Delft University of Technology

Faculty Mechanical, Maritime and Materials Engineering Transport Technology

M. Kooijman 2nd trolley systems in container cranes

Literature survey, Report 2006.TL.7075, Transport Engineering and Logistics.

The amount of containers that a quay crane can handle within an hour can be raised by the application of a second trolley system. Ship can leave the port earlier, or larger ship can be handled. Many second trolley systems have a platform to store the container temporarily. The supply of containers to the terminal become smoother by the use of a platform, as a result more containers can be handled.

In this literature search several published concepts have been treated. These concepts are second trolley systems with a fixed platform, with a moveable platform, systems with an ongoing container transport and systems without a platform.

It is impossible to designate one concept that fits in all situations. The choice for a concept depends among other things on the available budget, the desired crane productivity and if the concept is applied on a new or existing terminal.

Reports on Transport Engineering and Logistics (in Dutch)

Cytaty

Powiązane dokumenty

mówiącej o tym, że Bóg jest swoją istotą: istota jest zbiorem pew­ nych własności, Bóg jest swoją istotą, zatem Bóg jest zbiorem pew­ nych własności, co

When all target values regarding ‘inactive losses’ are achieved a production increase from 22,5 to 23,81 moves per hour is realized.. When implementing ‘hot-seat-swaps’ for

hoisting plans, transportation equipment and unloading order are analyzed to optimize the assembly process. The component transportation method is compared with transportation

Als een wordt gedeeld door de som van de schades per cyclus vermenigvuldigd met de hijspercentages van de hijslocaties, kan het aantal cycli tot breuk voor een punt in de kade

If for the important locations in the beam the number of cycles to failure is determined, based on the hoist percentage, the lowest number of cycles to fatigue can be determined..

Dit concept, genaamd de Monomax, kan getransporteerd worden naar de klant in componenten, semi erected of fully erected (figuur 4). Bij fully erected is de kraan

It is critical that floating cranes are not selective in the types of containers they handle so long as the current vessel stowage planning is used.. Handling only specific types

Deze concepten zijn onder te verdelen in tweede kat systemen met een vast platform, met een verplaatsbaar platform, systemen met een continu containertransport en systemen die