• Nie Znaleziono Wyników

Communication in Project Communication in Project Management Management

N/A
N/A
Protected

Academic year: 2021

Share "Communication in Project Communication in Project Management Management"

Copied!
14
0
0

Pełen tekst

(1)

Communication in Project Communication in Project

Management Management

byby

Marcin Ścioch Marcin Ścioch

s3523@pjwstk.edu.pl s3523@pjwstk.edu.pl

(2)

Instead of introduction Instead of introduction

BOSS: We've got to get this application BOSS: We've got to get this application developed by the end of the week or

developed by the end of the week or

you're all fired. Now, Jim, tell me what this you're all fired. Now, Jim, tell me what this

means.

means.

JIM: You're an idiot?JIM: You're an idiot?

BOSS: No, you're fired. Sally?BOSS: No, you're fired. Sally?

SALLY: We've got to get this software SALLY: We've got to get this software

developed by Friday or we'll be joining Jim developed by Friday or we'll be joining Jim

at Wal-Mart.

at Wal-Mart.

BOSS: That's it. Get out. Get it done.BOSS: That's it. Get out. Get it done.

(3)

What does effective communication What does effective communication

involves?

involves?

An exchange of information.An exchange of information.

An act or instance of transmitting An act or instance of transmitting information.

information.

A verbal or written message.A verbal or written message.

A technique for expressing ideas A technique for expressing ideas effectively.

effectively.

A process by which meanings are A process by which meanings are

exchanged between individuals through a exchanged between individuals through a

common system of symbols.

common system of symbols.

(4)
(5)

Project manager Project manager

is the person who has the overall is the person who has the overall

responsibility for the successful planning responsibility for the successful planning

and execution of project and execution of project

has to come up with a plan of the flow of has to come up with a plan of the flow of information and of the resources needed information and of the resources needed

(servers etc) (servers etc)

is the one who’s responsible for making is the one who’s responsible for making decisions both small and large

decisions both small and large

(6)

Project administrator Project administrator

responsible for the deployment and responsible for the deployment and

maintenance of communication channels maintenance of communication channels

for the whole team for the whole team

regular back-up of project dataregular back-up of project data

provide timely response to inquiries from provide timely response to inquiries from the team

the team

allows a project member complete control allows a project member complete control over a project and speak on behalf of the over a project and speak on behalf of the

project team project team

(7)

Types of communication Types of communication

FormalFormal

In complex projectsIn complex projects

InformalInformal

In small projectsIn small projects

(8)

A good and a bad message A good and a bad message . .

Who are you: 723PC (Airplane tail number) Where are you: Dove Street (Location of where the

plane is currently located)

Where are you going: Mesa Departure (Will be traveling Over Costa Mesa)

Santa Barbara (Final destination) Local Weather

Conditions: Information Bravo (The FAA has an hourly local weather transmission

that the pilot is required to have listened to prior to take-off)

(9)

A good and a bad message A good and a bad message . .

Who called: 723PC (confirms who sent the message)

Confirmation on where: Turn right heading 220 at or below 2400 (confirms the direction and altitude that the pilot can travel upon

take-off.)

Next handoff: Advisory Frequency 124.85 (pilot will pre-set the next transmission while

in the air)

Transponder #: Squawk 0210 (The transponder number that the air traffic controller

has assigned to the plane and

(10)

Written message Written message

Sender and Receiver acknowledge Sender and Receiver acknowledge each other

each other

Few very specific words, explicit and Few very specific words, explicit and unambiguous

unambiguous

Re-Affirm what has been heard and Re-Affirm what has been heard and understood

understood

(11)

Verbal message Verbal message

The message itself The message itself

Para lingual attributes of the Para lingual attributes of the message

message

Nonverbal communication Nonverbal communication

(12)

Phone call Phone call

Quick - not more than 5 minutesQuick - not more than 5 minutes

ProfessionalProfessional

Point to pointPoint to point

(13)

References References

Z. Szyjewski „Z. Szyjewski „Metody zarządzania Metody zarządzania projektami informatycznymi

projektami informatycznymi” Placet ” Placet 20042004

A. Mehta „Communication in Project A. Mehta „Communication in Project Management”

Management”

www.informit.comwww.informit.com

(14)

Thank you for your Thank you for your

attention!

attention!

Cytaty

Powiązane dokumenty

The recent publication of ICOLD (International Commission on Large Dams) Bulletin 164 on internal erosion in existing dams, dikes and levees and their foundations (ICOLD 2016,

The method can be used in multi- stage projects where there is free choice of the start of the next phases of the project, which creates a Real Option situation.. The starting the

The analysis of two approaches to leadership (i.e. transformational), in regard to growing demand for versatility of Project Manager, points to the necessity of continuous

Так, можна зазначити, що такий інститут, як гро- мадські ради при органах державної влади, безпосередньо створений для сприяння

Do isto ty bow iem dobrze spełnionych obow iązków zaw odow ych należy społeczno-polityczna działalność ad w o k atu ry... i cie­ szyła się dużym

The survey includes five scales (goal orientations — mastery goal orientation and performance 40.. goal orientation — social capital, environmental complexity, and project

Jana Bosko w Różanymstoku (Decyzja Podlaskiego Woje­ wódzkiego Konserwatora Zabytków w Białymstoku z dnia 17 marca 2003 roku; Dekret powołania Salezjańskiego

jeszcze, że hołdując tradycyjnym wzorom rodziny i małżeństwa środowi­ sko wiejskie znacznie silniej wyznacza pozytywne postawy wobec mał­ żeństwa jako instytucji „ustanowionej