Important Notice
In Europe there is no harmonized norm or regulation regarding Integrated Function Maintnance (fire protection system). Each country could have its own norm or regulation, however the most commonly used one is German standard DIN4102-12. DIN 4102-12 has been introduced by approved testing and certification organisations in Germany, as the effect of years of experience and numerous tests to maintain electric systems circuit integrity in the event of fire.
Among fundamental assumptions of the DIN 4102-12 standard is testing carefully if all systems of cables and conduits, including mounting elements, effectively provide power supply to human life saving devices in the event of fire.
BAKS has carried out more than sixty product tests together with the following cable manufactures:
Bitner, Dätwyler, Elkond, Elpar, Eupen, Facab Lynen, Kabtek, Madex, Nexans, NKT,
Prakab, Studer, Technokabel, TELE-FONIKA. All tests were conducted at the three accredited institutes, i.e. DMT Dortmund, Fires Baltizovce, and ITB Fire Testing Laboratory in Warsaw, and confirmed by applicable certificates.
E30, E90 Systems acc. to DIN4102-12
Certyfikat potwierdza zgodność systemów nośnych BAKS o odporności ogniowej E-30, E-90 of normą DIN 4102:12 w oparciu o badania przeprowadzone w akredytowanych instytutach.
Certyfikat na Zespoły kablowe BAKS o klasie podtrzymania funkcji elektrycznych E-30,E-60, E-90 wydany przez CNBOP w Warszawie.
Certyfikat Zgodności E-30, E-60, E-90 potwierdzony jest pozytywnymi raportami of około 40-stu badań of następującymi producentami: Bitner, Dätwyler, Elkond, Elpar, Eupen, Facab Lynen, Madex, Nexans, Prakab, Studer, Technokabel, Telefonika.
Aprobata CNBOP na systemy nośne tras kablowych BAKS o odporności ogniowej E-30, E-90, potwierdzająca badania na zgodność of DIN 4102-12
Aprobata Techniczna na puszki instalacyjne przeciwpożarowe o odporności ogniowej E-90
Certyfikat Zgodności na puszki instalacyjne przeciwpożarowe BAKS o odporności ogniowej E-90
Aprobata na Zespoły kablowe firmy BAKS potwierdza uzyskanie pozytywnego wyniku w badaniach ogniowych konstrukcji nośnych BAKS wraz of kablami wymienionych producentów and jest zgodna of najnowszym rozporządzeniem Ministra Infrastruktury of dn. 12.03.2009 (Dz. U. 2009, Nr 56, poz. 461), obowiązującym od dn. 08.07.2009r oraz of Normą DIN 4102-12:1998-11.
XIX
Each Certificate of Conformity is issued by BAKS upon inspecting the completed electrical installation
0 0 200 400 600 800 1000 1200
25 50 75 100
TEMP. [°C]
TIME [min.]
30 60 90
Important! Up until now BAKS has carried out flaming tests with the following cable producers:
Bitner, Dätwyler, Elkond, Eupen, Facab Lynen, Madex, Kabtek, Nexans, NKT, Prakab, Studer, Technokabel and TELE-FONIKA Kable
System Circuit Integrity in the Event of Fire – E30, E90 Systems
Particular emphasis has been recently placed on maintaining human safety in public utility buildings and
commercial and industrial occupancies in fire conditions. Therefore, it is of vital importance that the fire emergency and signalling systems are reliable. To comply with the new safety requirements BAKS decided to carry out tests in order to implement a new and modified cable tray and ladder system, in conformity with DIN 102 part 12.
Therefore, a cable management system together with all the cables must be inspected to ensure that during a fire all electricity receivers are incessantly supplied with electric energy for the required period of time.
Uninterrupted functioning of electrical installation in accordance with existing regulations is understood as continuous supply of electric power in a facility in fire conditions. The above requirements do not refer to the whole electrical supply system in the facility but to its particular circuit groups only, which are relevant for special safety protection of a large number of people gathered therein.
Typical examples of such circuits include emergency lighting, sound alarms, ventilation devices in hotels, hospitals, and in any other public utility and commercial occupancies where large groups of people frequently gather.
The standard is obligatory for low voltage that does not exceed 1kV. System Circuit Integrity in the Event of Fire in the facility is classified within two different emergency running time groups: E30 and E90 Systems.
Example:
Marking E30 means that the requirement for maintaining circuit integrity of emergency machinery and equipment to continue functioning in the building structure in the event of fire must not be shorter than 30 minutes. This standard is designed for fire signalling, monitoring devices, and evacuation lighting, where water sprinkling systemis installed.
Marking E90 means that the requirement for maintaining circuit integrity of emergency machinery and equipment to continue functioning in the building structure in the event of fire must be 90 minutes or longer.
It has been designed for ventilation devices of stairways and emergency exits, lift shafts, raising of fire water pressure, and for devices that evacuate smoke and combustion gases.
BAKS has carried out repeated special tests in the accredited fire testing laboratories in Germany and Slovakia.
They were made on ceilings of cell and B20 class of concrete. The base of research conducted according to the DIN 4102 norm were standard tests with products placed in a fire test furnace. The process of preheating was conducted according to an internationally accepted time-temperature curve diagram.
The support systems offered by BAKS comply with DIN 4102 part 12.
Accordingly, cable ladders may be suspended from ceilings, cable trays mounted to walls, fire resistant cables attached to ceilings both in the vertical and horizontal plane, fixed to walls with a single support or ladder length.
For all systems several manufacturing and finishing methods are available for installers to select the most
appropriate option to suit onsite conditions.
BAKS SUPPORTING SYSTEMS - REPORTS FROM TESTS WITH THE E30, E90 INTEGRATED FUNCTION MAINTANANCE CLASS
Report Classification
Producers
BITNER
ZAKŁADY KABLOWE
C
ABSTUDER CABLES
ATTENTION! Due to the introduction of innovative technologies In material and construction design, BAKS has done several examinations of new solutions in fire resistance system (extending the rules and standards of DIN4102-12)
Zakłady Kablowe BITNER ul. Freiedleina 3/3
30-009 Kraków
Datwyler Kabel-Systeme Reprezentant w Polsce Dariusz Czarnecki
ul. Poniatowskiego 9a 05-870 Błonie
Oravická 1228 Trstená 028 01 Slovenská republika
KABELWERK Eupen AG Malmedyer Strasse 9 4700 Eupen (Belgia)
FACAB LYNEN Dürener Straße 340, 52249 Eschweiler
Alipaşa mevkii Sanayi 12 Sokak No:7 , Silivri - İstanbul / TURKEY
ul. Żurawia 96, 05-462 Wiązowna, Stefanówka
NEXANS Deutschland Industries Einersbergstraße 1
36404 Vacha
PRAKAB Ke Kablu 278 102 09 Praha - Hostivař, Česká Republika
Studer Cables Switzerland Herrenmattstrasse 20
CH-4658 Daniken
TECHNOKABEL
TECHNOKABEL S.A.
ul. Nasielska 55 04-343 Warszawa
TELE-FONIKA Kable S.A.
ul. Składowa 2 41-902 Bytom
There is possibility to perform special fire examination with construction designed for a specific project
nkt cables S.A.
ul. Gajowa 3 43-254 Warszowice Fabryka kabli ELPAR SP of o.o.
ul.Laskowska 1, 21-200 Parczew
XIX
1. DMT Germany: Test report no. 31/20 of 21.04.2006 2. DMT Germany: Test report no. 31/22 of 31.07.2006 1. DMT Germany: Test report no. 31/49 of 15.04.2010 2. DMT Germany: Test report no. 31/50 of 23.08.2010 3. DMT Germany: Test report no. 31/57 of 19.12.2013 4. DMT Germany: Test report no. 31/60 of 15.01.2014 FIRES Slovakia: Test report no. FR-063-08-AUNE of 27.05.2008 FIRES Slovakia: Test report no. FR-225-14-AUNE2 of 22.12.2014
1. FIRES Slovakia: Test report no. FR-201-09-AUNE of 14.01.2010 2. DMT Germany: Test report no. DMT-DO-31/51 of 29.09.2010 3. DMT Germany: Test report no. DMT-DO-31/52 of 02.12.2010 4. FIRES Slovakia: Test report no. FR-126-11-AUNE of 27.06.2011 5. FIRES Slovakia: Test report no. FR-196-11-AUNE of 26.10.2011 6. DMT Germany: Test report no. DMT-DO-31/51 of dn. 07.10.2012 7. FIRES Slovakia: Test report no. FR-005-13-AUNE of 24.01.2013
8. FIRES Slovakia: Test report no. FR-183-13-AUNE of 25.10.2013 9. FIRES Slovakia: Test report no. FR-016-14-AUNE of 11.07.2014 10. FIRES Slovakia: Test report no. FR-010-15-AUNE2 of 06.03.2015 11. FIRES Slovakia: Test report no. FR-202-15-AUNE2 of 12.01.2016 1. FIRES Slovakia: Test report no. FR-121-10-AUNE of 25.06.2010
2. FIRES Slovakia: Test report no. FR-086-11-AUNE of 21.05.2011 3. FIRES Slovakia: Test report no. FR-266-11-AUNE of 23.02.2012r 4. FIRES Slovakia: Test report no. FR-020-12-AUNE of 29. 02. 2012 5. FIRES Slovakia: Test report no. FR-0135-12-AUNE of 19. 07. 2012 6. FIRES Slovakia: Test report no. FR-079-13-AUNE of 06. 06. 2013 7. FIRES Slovakia: Test report no. FR-160-13-AUNE of 26.09.2013 8. FIRES Slovakia: Test report no. FR-204-13-AUNE of 19.11.2013 9. FIRES Slovakia: Test report no. FR-049-14-AUNE of 04.04.2014
10. FIRES Slovakia: Test report no. FR-174-14-AUNE2 of 21.11.2014 11. FIRES Slovakia: Test report no. FR-243-14-AUNE2 of 26.01.2015 12. FIRES Slovakia: Test report no. FR-031-15-AUNE2 of 07.04.2015 13. FIRES Slovakia: Test report no. FR-112-15-AUNE2 of 01.07.2015 14. FIRES Slovakia: Test report no. FR-150-15-AUNE3 of 08.09.2015 15. FIRES Slovakia: Test report no. FR-018-16-AUNE3 of 26.04.2016 1. FIRES Slovakia: Test report no. FR-257-08-AUNE of 17.12.2008
2. Test to the Czech norm ZP27-2008
3. FIRES Slovakia: Test report no. FR-098-14-AUNE of 17.07.2014 1. FIRES Slovakia: Test report no. FR-217-13-AUNE of 27.09.2012
1. FIRES Slovakia: Test report no. FR-102-12-AUNE of 18.05.2012 2. FIRES Slovakia: Test report no. FR-245-12-AUNE of 13.12.2012
1. DMT Germany: Test report no. 31/43 of 30.10.2009 2. DMT Germany: Test report no. 31/44 of 12.02.2009 1. FIRES Slovakia: Test report no. FR-090-10-AUNE of 24.05.2010 2. FIRES Slovakia: Test report no. FR-171-10-AUNE of 14.10.2010 3. FIRES Slovakia: Test report no. FR-044-11-AUNE of 20.05.2011 4. FIRES Slovakia: Test report no. FR-0030-13-AUNE of 28.02.2013 5. DMT Germany: Test report no. 31/55 of 01.03.2012 6. FIRES Slovakia: Test report no. FR-0060-13-AUNE of 19.04.2013 7. FIRES Slovakia: Test report no. FR-030-13-AUNE of 28.02.2013 8. DMT Germany: Test report no 31/58 of 07.08.2013 9. FIRES Slovakia: Test report no. FR-066-14-AUNE of 23.05.2014
10. FIRES Slovakia: Test report no. FR-129-14-AUNE of 17.07.2014 11. FIRES Slovakia: Test report no. FR-062-15-AUNE2 of 26.05.2015 12. FIRES Slovakia: Test report no. FR-029-16-AUNE3 of 29.04.2016
1. FIRES Slovakia: Test report no. FR-108-13-AUNE of 11.07.2013 2. FIRES Slovakia: Test report no. FR-224-13-AUNE of 02.12.2013 3. FIRES Slovakia: Test report no. FR-098-14-AUNE of 17.07.2014 1. DMT Germany: Test report no. 31/53 of 19.12.2013
2. DMT Germany: Test report no. 31/59 of 25.04.2014 3. MPA iBMB Germany: Test report no. 3593/674/14 of 21.07.2014 4. FIRES Slovakia: Test report no. FR-062-15-AUNE2 of 09.03.2015 5. DMT Germany: Test report no. 31/75 of 01.03.2016 6. DMT Germany: Test report no. 31/82 of 30.05.2016
1. FIRES Slovakia: Test report no. FR-143-14-AUNE3 of 22.08.2014 2. FIRES Slovakia: Test report no. FR-156-14-AUNE2 of 28.08.2014 3. FIRES Slovakia: Test report no. FR-035-15-AUNE2 of 10.04.2015
1. DMT Germany: Test report no. 31/29 of 31.01.2007 2. DMT Germany: Test report no. 31/30 of 31.01.2007 3. DMT Germany: Test report no. 31/34 of 22.08.2007 4. DMT Germany: Test report no. 31/61 of 22.05.2014
5. DMT Germany: Test report no. 31/70 of 04.08.2014 6. DMT Germany: Test report no. 31/86 of 24.08.2016
Flaming Testing of BAKS E90 Systems Carried out with Cables from BITNER
Flaming Testing of BAKS E90 Systems Carried out with Cables from DÄTWYLER
View before and after the inspection View before and after the inspection
View before and after the inspection View before and after the inspection
Flaming Testing of BAKS E90 Systems Carried out with Cables from ELKOND
Flaming Testing of BAKS E90 Systems Carried out with Cables from EUPEN
View before and after the inspection View before and after the inspection
View before and after the inspection View before and after the inspection
XIX
Flaming Testing of BAKS E90 Systems Carried out with Cables from TELEFONIKA
Flaming Testing of BAKS E90 Systems Carried out with Cables from FACAB
View before and after the inspection View before and after the inspection
View before and after the inspection View before and after the inspection
Flaming Testing of BAKS E90 Systems Carried out with Cables from NEXANS
Flaming Testing of BAKS E90 Systems Carried out with Cables from PRAKAB
View before and after the inspection View before and after the inspection
View before and after the inspection View before and after the inspection
XIX
Flaming Testing of BAKS E90 Systems Carried out with Cables from STUDER
Flaming Testing of BAKS E90 Systems
Carried out with Cables from TECHNOKABEL
View before and after the inspection View before and after the inspection
View before and after the inspection View before and after the inspection
Basic Technical Data for the Installation of Fire Circuit Integrity Systems
Safe working load for cable trays - 10 kg/m, 20 kg/m.*
Cable Tray Width:
b- 100 mm b- 150 mm b- 200 mm b- 300 mm b- 400 mm*
b- 500 mm*
b- 600 mm*
Safe working load for ladders - 20 kg/m.
b- 100 mm b- 200 mm b- 300 mm b- 400 mm b- 500 mm*
b- 600 mm*
1. Technical specifications for cable trays, ladders and and mesh trays
2. Maximum distance between supports
Assembly that is standard
3. Maximum number of cable run levels (multi-tiers) per single rod
* Upgraded Testing Standard
1200mm 1500mm
Assembly that exceeds standard Safe working load for mesh trays - 2,0 kg/m*
60
60
Safe working load for mesh trays - 20 kg/m.
Cable Tray Width:
b- 100 mm*
b- 150 mm*
b- 200 mm*
b- 300 mm*
b- 400 mm*
b- 500 mm*
b- 600 mm*
b
60
60
b
60
b a
For cable trays of 1.5 mm steel thickness, assembling with LPP/LPOPH60N connectors and min. 4 SGKM6x12 sets of screws per connector.
* Upgraded Testing Standard
XIX Improper
arrangement
Cable route E90
Cable route E90
Usual cable route
4. In E30 and E90 Systems cables that do not comply with the above CI fire resistance standards may not be distributed
5. No cables that will not guarantee maintaining system circuit integrity are allowed above E30, E90 Systems, nor fastening components other than those of E30, E90 Systems is allowed
Proper arrangement
Improper arrangement
Cable route E90
Usual cable route
Proper arrangement
a=150 - standard a*=300 mm - upgraded standard
8. Routing cables in the vertical plane is possible only on mesh trays, ladder and rungs
max. 1500 mm max. 600 mm
max. 250 mm
standard - 300 mm upgraded standard - 600 mm
max. 1200 mm standard - 300 mm, upgraded standard - 600 mm
Indirectly through the use of Rod Hanger USOV and Bolt Anchor PSROM10
6. Mounting threaded rod onto ceiling
Directly onto ceiling with Drop-In Anchor - Steels TRSO M10, on condition that the anchor is concrete-sank 60mm min.
PG
min 60 mm standard TSRO
USV/USOV
min 60 mm standard PSROM10
PGM10
Note!
Standardized cable routes in vertical arrangement should be ducted in conformity with DIN4102-12, or every 3,5 m at the maximum, protected with the certified floor passageway in case of fire.
max.
150 mm
max. 150 mm LDP/LDOP
DGOP
max. 150 mm max. 600 mm
max.
150 mm
max. 1,5 m
CZDP/CZDOP
DGOP
max distance to the next support 1500 mm
LDP/LDOP
DGOP
Zalecane sposoby podparcia przy łączeniu drabinki of łukiem
Zalecany sposób podparcia przy łączeniu drabinki z czwórnikiem
max. 150 mm max. 600 mm
max.
150 mm
max. 1,5 m
CZKPP/CZKPOP
KCP/KCOP max.
150 mm
max. 150 mm
max distance to the next support 1500 mm
Zalecane sposoby podparcia przy łączeniu korytka of kolankiem
KKPP/KKPOP
KCP/KCOP
Zalecane sposoby podparcia przy łączeniu korytka z czwórnikiem
Zalecane sposoby podparcia przy łączeniu korytka siatkowego of kolankiem
Zalecane sposoby podparcia przy łączeniu korytka siatkowego z trójnikiem
max.
150 mm
max. 150 mm
max.
150 mm
max.
150 mm
max. 150 mm TKS
KDS/KDSO KDS/KDSO
KKS
7. Recommended way to support the fittings close to the connection with straight section
XIX
5
11
6
3 2
10
9
8 12
1
4 Example of Assembly for Cables Distribution - Cable Tray - to the Wall and Ceiling.
Cable Tray Thickness 1,5 mm Max. Spacing of Supports 1,2 m Max. Safe Load 10 kg/m
Example of Assembly for Cables Distribution - Cable Tray - to the Wall and Ceiling on Two Levels.
7
No. of Pcs.
in Single Suspension CODE Catalogue PRODUCT No.
No.
OPTIONALLY TO COMPLETE THE SET *
LIST OF ELEMENTS TO CONNECT 2 PCS OF CABLE TRAYS LIST OF ELEMENTS TO CREATE SUPPORT
1+1 1
2
1 2 2 2 2
1 1 1 4 4 16
1 Cable Tray
Straight Connector Screw Set
Bracket
Screw Set Spacer Threaded Rod
Rod Hanger Washer
Nut Joint Plate
Drop-In Anchor Washer
Nut Bolt Anchor 1
2 3
5 6 7*
10
12 8*
9*
4
13*
8*
9*
11*
KCP/KCOP300H60/3 LPP/LPOPH60
SGKM6x12
WFL/WFLO300
SGKM6x12 PD11 PGM10/1 USV/USOV
PP10 NSM10 BL/BLO300
TRSOM10 PP10 NSM10 PSROM10x80
161430 163111 651141
720130
651141 803100 651001 750709 650544 650244 100130
804800 650544 650244 804100 Mounting threaded rod onto ceiling:
- indirectly through Rod Hanger USV/USOV with Bolt Anchor PSROM10 - directly with Drop-In Anchor TRSOM... without the use of Rod Hangers USV/USOV, on condition that the anchor is concrete-sank 60mm min.
60
=
*
13Cable Tray Thickness 1,5 mm Max. Spacing of Supports 1,2 m Max. Safe Load 10 kg/m for 1 level
No. of Pcs.
in Single Suspension CODE Catalogue PRODUCT No.
No.
OPTIONALLY TO COMPLETE THE SET *
LIST OF ELEMENTS TO CONNECT 4 PCS OF CABLE TRAYS LIST OF ELEMENTS TO CREATE SUPPORT
2+1 2
4
1 4 4 4 4
2 1 1 6 6 32
2 Cable Tray
Straight Connector Screw Set
Bracket
Screw Set Spacer Threaded Rod
Rod Hanger Washer
Nut Joint Plate
Drop-In Anchor Washer
Nut Bolt Anchor 1
2 3
5 6 7*
10
12 8*
9*
4
13*
8*
9*
11*
KCP/KCOP300H60/3 LPP/LPOPH60
SGKM6x12
WFL/WFLO300
SGKM6x12 PD11 PGM10/1 USV/USOV
PP10 NSM10 BL/BLO300
TRSOM10 PP10 NSM10 PSROM10x80
161430 163111 651141
720130
651141 803100 651001 750709 650544 650244 100130
804800 650544 650244 804100 Mounting threaded rod onto ceiling:
- indirectly through Rod Hanger USV/USOV with Bolt Anchor PSROM10 - directly with Drop-In Anchor TRSOM... without the use of Rod Hangers USV/USOV, on condition that the anchor is concrete-sank 60mm min.
60
=
*
13 - Max. Spacing of Supports 1,2 m.- Max. Safe Load cable tray load 10 kg/m.
- Max. number of cable run levels per single rod - 2 - Fastening to concrete, B20 min.
- On E30 and E90 assemblies no fastening components other than those E30, E90 Systems is allowed - Above E30, E90 Systems no fastening components other than those of E30, E90 Systems
- In E30, E90 Systems laying cables that do not conform with the above CI fire resistance standards
is not allowed
1 2
7 5
9 3
8
4
6 10
11 12
Example of Assembly for Cables Distribution - Cable Tray - to the Wall and Ceiling.
Cable Tray Thickness 1,5 mm Max. Spacing of Supports 1,2 m Max. Safe Load 10 kg/m
Example of Assembly for Cables Distribution - Cable Tray to the Wall and Ceiling on Two Levels.
13
No. of Pcs.
in Single Suspension CODE Catalogue PRODUCT No.
No.
OPTIONALLY TO COMPLETE THE SET *
LIST OF ELEMENTS TO CONNECT 2 PCS OF CABLE TRAYS LIST OF ELEMENTS TO CREATE SUPPORT
KCP/KCOP300H60/3 LPP/LPOPH60
SGKM6x12
WMC/WMCO300 BL/BLO300
PGM10/1 USV/USOV
PP10 UPW/UPWO
SGKM8x14
SGKM6x12 PSROM10x80
NSM10
TRSOM10 PP10 NSM10 11*
7
12 1 2 3
5 4
8 9*
10*
6
13*
14*
11*
10*
Cable Tray Straight Connector
Screw Set
Bracket Joint Plate
Threaded Rod Rod Hanger
Washer Nut Rod Grip Screw Set
Screw Set Bolt Anchor
Drop-In Anchor Washer
Nut
651001 750709 650544 650244 750100 651241
651141 651141 100130 161430 163111
711130
804100
804800 650544 650244
2 2 16
1 1
1 1 4 4 1 2
2 2+1
1 2 2 Mounting threaded rod onto ceiling:
- indirectly through Rod Hanger USV/USOV with Bolt Anchor PSROM10 - directly with Drop-In Anchor TRSOM... without the use of Rod Hangers USV/USOV, on condition that the anchor is concrete-sank 60mm min.
60
=
*
14Cable Tray Thickness 1,5 mm Max. Spacing of Supports 1,2 m Max. Safe Load 10 kg/m for 1 level
No. of Pcs.
in Single Suspension CODE Catalogue PRODUCT No.
No.
OPTIONALLY TO COMPLETE THE SET *
LIST OF ELEMENTS TO CONNECT 4 PCS OF CABLE TRAYS LIST OF ELEMENTS TO CREATE SUPPORT
KCP/KCOP300H60/3 LPP/LPOPH60
SGKM6x12
WMC/WMCO300 BL/BLO300
PGM10/1 USV/USOV
PP10 UPW/UPWO
SGKM8x14
SGKM6x12 PSROM10x80
NSM10
TRSOM10 PP10 NSM10 11*
7
12 1 2 3
5 4
8 9*
10*
6
13*
14*
11*
10*
Cable Tray Straight Connector
Screw Set
Bracket Joint Plate
Threaded Rod Rod Hanger
Washer Nut Rod Grip Screw Set
Screw Set Bolt Anchor
Drop-In Anchor Washer
Nut
651001 750709 650544 650244 750100 651241
651141 651141 100130 161430 163111
711130
804100
804800 650544 650244
4 4 32
2 2
1 1 6 6 2 4
4 4+1
1 4 4 Mounting threaded rod onto ceiling:
- indirectly through Rod Hanger USV/USOV with Bolt Anchor PSROM10 - directly with Drop-In Anchor TRSOM... without the use of Rod Hangers USV/USOV, on condition that the anchor is concrete-sank 60mm min.
60
=
*
14 - Max. Spacing of Supports 1,2 m.- Max. Safe Load cable tray load 10 kg/m.
- Max. number of cable run levels per single rod - 3 - Fastening to concrete, B20 min.
- On E30 and E90 assemblies no fastening components other than those E30, E90 Systems is allowed - Above E30, E90 Systems no fastening components other than those of E30, E90 Systems
- In E30, E90 Systems laying cables that do not conform with the above CI fire resistance standards
is not allowed
XIX
Example of Assembly for Cables Distribution - Cable Tray - to the Wall and Ceiling.
9
1 2
3
11 5
7 6
10
4
12
13
Example of Assembly for Cables Distribution - Cable Tray to the Wall and Ceiling on Two Levels.
8
Cable Tray Thickness 1,5 mm Max. Spacing of Supports 1,2 m Max. Safe Load 10 kg/m
No. of Pcs.
in Single Suspension CODE Catalogue PRODUCT No.
No.
OPTIONALLY TO COMPLETE THE SET *
LIST OF ELEMENTS TO CONNECT 2 PCS OF CABLE TRAYS LIST OF ELEMENTS TO CREATE SUPPORT
KCP/KCOP300H60/3 2
LPP/LPOPH60 2
SGKM6x12 16
WU/WUO300 1
Cable Tray Straight Connector
Screw Set
Bracket
BL/BLO300 1
PGM10/1 1
USV/USOV 1
651001 750709 Joint Plate
Threaded Rod Rod Hanger
PP10 4
NSM10 4
650544 650244 Washer
Nut
UPW/UPWO 750100 1 Rod Grip
SGKM8x14 651241 2 Screw Set
SGKM6x12 2
Screw Set 651141
651141 100130 161430 163111
805230
PSROM10x80 804100 2+1 Bolt Anchor
1 TRSOM10 804800 Drop-In Anchor
PP10 2
NSM10 2
650544 650244 Washer
Nut 11*
7
12 1 2 3
5 4
8 9*
10*
6
13*
14*
11*
10*
Mounting threaded rod onto ceiling:
- indirectly through Rod Hanger USV/USOV with Bolt Anchor PSROM10 - directly with Drop-In Anchor TRSOM... without the use of Rod Hangers USV/USOV, on condition that the anchor is concrete-sank 60mm min.
60
=
*
14Cable Tray Thickness 1,5 mm Max. Spacing of Supports 1,2 m Max. Safe Load 10 kg/m for 1 level
No. of Pcs.
in Single Suspension CODE Catalogue PRODUCT No.
No.
OPTIONALLY TO COMPLETE THE SET *
LIST OF ELEMENTS TO CONNECT 4 PCS OF CABLE TRAYS LIST OF ELEMENTS TO CREATE SUPPORT
KCP/KCOP300H60/3 4
LPP/LPOPH60 4
SGKM6x12 32
WU/WUO300 2
Cable Tray Straight Connector
Screw Set
Bracket
BL/BLO300 2
PGM10/1 1
USV/USOV 1
651001 750709 Joint Plate
Threaded Rod Rod Hanger
PP10 6
NSM10 6
650544 650244 Washer
Nut
UPW/UPWO 750100 2 Rod Grip
SGKM8x14 651241 4 Screw Set
SGKM6x12 4
Screw Set 651141
651141 100130 161430 163111
805230
PSROM10x80 804100 4+1 Bolt Anchor
1 TRSOM10 804800 Drop-In Anchor
PP10 4
NSM10 4
650544 650244 Washer
Nut 11*
7
12 1 2 3
5 4
8 9*
10*
6
13*
14*
11*
10*
Mounting threaded rod onto ceiling:
- indirectly through Rod Hanger USV/USOV with Bolt Anchor PSROM10 - directly with Drop-In Anchor TRSOM... without the use of Rod Hangers USV/USOV, on condition that the anchor is concrete-sank 60mm min.
60
=
*
14 - Max. Spacing of Supports 1,2 m.- Max. Safe Load cable tray load 10 kg/m.
- Max. number of cable run levels per single rod - 3 - Fastening to concrete, B20 min.
- On E30 and E90 assemblies no fastening components other than those E30, E90 Systems is allowed - Above E30, E90 Systems no fastening components other than those of E30, E90 Systems
- In E30, E90 Systems laying cables that do not conform with the above CI fire resistance standards
is not allowed
Example of Assembly for Cables Distribution - Cable Tray to the Wall.
10
5
6
7
8 11
13
3 2
9 4
12
1
Cable Tray Thickness 1,5 mm Max. Spacing of Supports 1,2 m Max. Safe Load 10 kg/m
No. of Pcs. in Single Suspension CODE Catalogue PRODUCT No.
No.
LIST OF ELEMENTS TO CONNECT 2 PCS OF CABLE TRAYS LIST OF ELEMENTS TO CREATE SUPPORT
2 2 16
1 1 1 1 4 4 2 1
2 2+1 161430 163111 651141
711130 752900 651001 731401 650544 650244 651241 100130
651141 804100 KCP/KCOP300H60/3
LPP/LPOPH60 SGKM6x12
WMC/WMCO300 UPWK/UPWKO
PGM10/1 WPPGV/WPPOV
PP10 NSM10 SGKM8x14 BL/BLO300
SGKM6x12 PSROM10x80 Cable Tray
Straight Connector Screw Set
Bracket Uchwyt Threaded Rod Artic. Rod Hanger
Washer Nut Screw Set Joint Plate
Screw Set Bolt Anchor 1
2 3
11 5 6 7 8 9 10
4
12 13
Example of Assembly for Cables Distribution - Cable Tray to the Wall.
No. of Pcs.
in Single Suspension CODE Catalogue PRODUCT No.
No.
LIST OF ELEMENTS TO CONNECT 2 PCS OF CABLE TRAYS LIST OF ELEMENTS TO CREATE SUPPORT
2 2 16
1 1 1 1 4 4 2 1
2 2+1 161430 163111 651141
711130 752900 651001 750809 650544 650244 651241 100130
651141 804100 KCP/KCOP300H60/3
LPP/LPOPH60 SGKM6x12
WMC/WMCO300 UPWK/UPWKO
PGM10/1 WKPO
PP10 NSM10 SGKM8x14 BL/BLO300
SGKM6x12 PSROM10x80 Cable Tray
Straight Connector Screw Set
Bracket Rod Grip Threaded Rod
Rod Hanger Washer
Nut Screw Set Joint Plate
Screw Set Bolt Anchor 1
2 3
11 5 6 7 8 9 10
4
12 13
10 5
6
7
8
11
13 3
9 2
4
12
1
Cable Tray Thickness 1,5 mm Max. Spacing of Supports 1,2 m Max. Safe Load 10 kg/m
Cable Tray Thickness 1,5 mm Max. Spacing of Supports 1,2 m Max. Safe Load 10 kg/m
No. of Pcs.
in Single Suspension CODE Catalogue PRODUCT No.
No.
LIST OF ELEMENTS TO CONNECT 4 PCS OF CABLE TRAYS LIST OF ELEMENTS TO CREATE SUPPORT
4 4 32
2 1
2 1 8 8 4 2
4 5 161430 163111 651141
711130 752900
651001 750809 650544 650244 651241 100130
651141 804100 KCP/KCOP300H60/3
LPP/LPOPH60 SGKM6x12
WMC/WMCO300 UPWK/UPWKO
PGM10/1 WKPO
PP10 NSM10 SGKM8x14 BL/BLO300
SGKM6x12 PSROM10x80 Cable Tray
Straight Connector Screw Set
Bracket Rod Grip
Threaded Rod Rod Hanger
Washer Nut Screw Set Joint Plate
Screw Set Bolt Anchor 1
2 3
11 5 6 7 8 9 10
4
12 13 14
2 750100 UPW/UPWO
Rod Grip
11
5 7
8
9 12
14 3
10 2
4
12
1
6
Example of Assembly for Cables Distribution cable tray load - to the Wall
on Two Levels.
Possibility to mount the threaded rod to the wall use Articulated Rod Hanger WPPGV/WPPOV and Anchor Bolt PSROM10
* =WPPGV/WPPOV
* =WPPGV/WPPOV
XIX
No. of Pcs.
in Single Suspension CODE Catalogue PRODUCT No.
No.
LIST OF ELEMENTS TO CONNECT 2 PCS OF CABLE TRAYS LIST OF ELEMENTS TO CREATE SUPPORT
1 2 3
7*
5 4
8*
9*
10
13*
6
14
2
LPP/LPOPH60 2
SGKM6x12 16
161430 163111 651141 Cable Tray
Straight Connector
BL/BLO300 KCP/KCOP300H60/3
Bracket
PD11 803100
Spacer Threaded Rod
Rod Hanger Washer
Nut
100130
Screw Set 11
12
Bracket
WFL/WFLO300
PSROM10x80
1
1+1 720130
804100 Bolt Anchor
1
PGM10/1 1
USV/USOV 1
651001 750709
PP10 4
NSM10 4
650544 650244
1
WFL/WFLO500 720150 1 SMM10x20 650743 2
SGKM6x12 651141 2 Screw Set
OPTIONALLY TO COMPLETE THE SET *
15 8*
9*
TRSOM10 804800 1 Drop-In Anchor
PP10 2
NSM10 2
650544 650244 Washer
Nut Screw Set Joint Plate
Example of Assembly for Cables Distribution - Cable Tray to the Ceiling.
Cable Tray Thickness 1,5 mm Max. Spacing of Supports 1,2 m Max. Safe Load 10 kg/m
13
9
8
10
12
3 2
1
4
6
14
Mounting threaded rod onto ceiling:
- indirectly through Rod Hanger USV/USOV with Bolt Anchor PSROM10 - directly with Drop-In Anchor TRSOM... without the use of Rod Hangers USV/USOV, on condition that the anchor is concrete-sank 60mm min.
60
=
*
15Example of Assembly for Cables Distribution - Cable Tray to the Ceiling.
Cable Tray Thickness 1,5 mm Max. Spacing of Supports 1,2 m Max. Safe Load 10 kg/m
60
Mounting threaded rod onto ceiling:
TRSOM... concrete-sank 60mm min.
1 2
3 4
6 7
9 8 10
11
5
7
12
No. of Pcs.
in Single Suspension CODE Catalogue PRODUCT No.
No.
LIST OF ELEMENTS TO CONNECT 2 PCS OF CABLE TRAYS LIST OF ELEMENTS TO CREATE SUPPORT
1 2 3
7 5 4
8 9 10 11 6
12
Cable Tray Straight Connector
Screw Set
Threaded Rod
Washer Nut Screw Set Joint Plate
Bolt Anchor Bracket
Drop-In Anchor
Spacer
LPP/LPOPH60 SGKM6x12
PGM10/1
PP10 NSM10 SGKM6x12 BL/BLO300
PSROM10x80 WFC/WFCO300
TRSOM10
PD11
2 2 16 161430 163111 651141
1 720330
1 1 651001 804800
2 2 650544 650244 651141 2
1 100130
1 804100
1 803100 KCP/KCOP300H60/3
7 5
11
Example of Assembly for Cables Distribution - Cable Tray to the Ceiling.
Cable Tray Thickness 1,5 mm Max. Spacing of Supports 1,2 m Max. Safe Load 10 kg/m for 1 level
Example of Assembly for Cables Distribution - Cable Tray to the Ceiling on Two Levels.
1 2
3
6 10
13 11 12
4
15
14
5
7
8 9
No. of Pcs.
in Single Suspension CODE Catalogue PRODUCT No.
No.
OPTIONALLY TO COMPLETE THE SET *
LIST OF ELEMENTS TO CONNECT 2 PCS OF CABLE TRAYS LIST OF ELEMENTS TO CREATE SUPPORT
1 2 3
7 5 4
8 9*
10*
11*
6
13 12
14 15*
16 10*
11*
Cable Tray Straight Connector
Screw Set
Ceiling Bracket Threaded Rod
Washer Nut Rod Grip
Screw Set Screw Set
Screw Set Bolt Anchor
Drop-In Anchor Washer
Nut
KCP/KCOP300H60/3
WWS/WWSO300
US12/USO12 LPP/LPOPH60
SGKM6x12
WPCW/WPCO400 BL/BLO300
PGM10/1
PP10 NSM10 UPW/UPWO
SGKM8x14 SMM10x30
SGKM6x12 PSROM10x80
TRSOM10 PP10 NSM10
710530
750508 161430 163111 651141
750640 100130
651001
650544 650244 750100
651241 650843
651141 804100
804800 650544 650244
1 2 2 16
1 1
1 1 4 4 1
2 2
2 2+1
1 2 2 Bracket
Joint Plate
Mounting threaded rod onto ceiling:
- indirectly through Rod Hanger USV/USOV with Bolt Anchor PSROM10 - directly with Drop-In Anchor TRSOM... without the use of Rod Hangers USV/USOV, on condition that the anchor is concrete-sank 60mm min.
60
=
*
16Rod Hanger
No. of Pcs.
in Single Suspension CODE Catalogue PRODUCT No.
No.
OPTIONALLY TO COMPLETE THE SET *
LIST OF ELEMENTS TO CONNECT 4 PCS OF CABLE TRAYS LIST OF ELEMENTS TO CREATE SUPPORT
1 2 3
7 5 4
8 9*
10*
11*
6
13 12
14 15*
16 10*
11*
Cable Tray Straight Connector
Screw Set
Ceiling Bracket Threaded Rod
Washer Nut Rod Grip
Screw Set Screw Set
Screw Set Bolt Anchor
Drop-In Anchor Washer
Nut
KCP/KCOP300H60/3
WWS/WWSO300
US12/USO12 LPP/LPOPH60
SGKM6x12
WPCW/WPCO400 BL/BLO300
PGM10/1
PP10 NSM10 UPW/UPWO
SGKM8x14 SMM10x30
SGKM6x12 PSROM10x80
TRSOM10 PP10 NSM10
710530
750508 161430 163111 651141
750640 100130
651001
650544 650244 750100
651241 650843
651141 804100
804800 650544 650244
2 4 4 32
1 2
1 1 6 6 2
4 4
4 2+1
1 4 4 Bracket
Joint Plate
Rod Hanger
Optional transition from cable run of trays in the horizontal plane to the vertical plane only through the use of cable ladders.
Mounting threaded rod onto ceiling:
- indirectly through Rod Hanger USV/USOV with Bolt Anchor PSROM10 - directly with Drop-In Anchor TRSOM... without the use of Rod Hangers USV/USOV, on condition that the anchor is concrete-sank 60mm min.
60
=
*
16 Cable Tray Thickness 1,5 mmMax. Spacing of Supports 1,2 m Max. Safe Load 10 kg/m for 1 level
- Max. Spacing of Supports 1,2 m.
- Max. Safe Load cable tray load 10 kg/m.
- Max. number of cable run levels per single rod - 3 - Fastening to concrete, B20 min.
- On E30 and E90 assemblies no fastening components other than those E30, E90 Systems is allowed - Above E30, E90 Systems no fastening components other than those of E30, E90 Systems
- In E30, E90 Systems laying cables that do not conform with the above CI fire resistance standards
is not allowed
XIX
Example of Assembly for Cables Distribution - Cable Tray to the Ceiling.
Cable Tray Thickness 1,5 mm Max. Spacing of Supports 1,2 m Max. Safe Load 10 kg/m
Example of Assembly for Cables Distribution - Cable Tray to the Ceiling on Two Levels.
1 2
3
6 10
13 11 12
4 15
14
5
7
8 9
No. of Pcs.
in Single Suspension CODE Catalogue PRODUCT No.
No.
OPTIONALLY TO COMPLETE THE SET *
LIST OF ELEMENTS TO CONNECT 4 PCS OF CABLE TRAYS LIST OF ELEMENTS TO CREATE SUPPORT
1 2 3
7 5 4
8 9*
10*
11*
6
13 12
14 15*
16 10*
11*
Cable Tray Straight Connector
Screw Set
Bracket
Ceiling Bracket Joint Plate
Threaded Rod Rod Hanger
Washer Nut Rod Grip
Screw Set Screw Set
Screw Set Bolt Anchor
Drop-In Anchor Washer
Nut
KCP/KCOP300H60/3 LPP/LPOPH60
SGKM6x12
WMC/WMCO300
WPCW/WPCO400 BL/BLO300
PGM10/1 USV/USOV
PP10 NSM10 UPW/UPWO
SGKM8x14 SMM10x30
SGKM6x12 PSROM10x80
TRSOM10 PP10 NSM10
161430 163111 651141
711130
750640 100130
651001 750709 650544 650244 750100
651241 650843
651141 804100
804800 650544 650244
4 4 32
1 2 2
1 1 6 6 2
4 4
4 2+1
1 4 4 Mounting threaded rod onto ceiling:
- indirectly through Rod Hanger USV/USOV with Bolt Anchor PSROM10 - directly with Drop-In Anchor TRSOM... without the use of Rod Hangers USV/USOV, on condition that the anchor is concrete-sank 60mm min.
60
=
*
16 - Max. Spacing of Supports 1,2 m.- Max. Safe Load cable tray load 10 kg/m.
- Max. number of cable run levels per single rod - 3 - Fastening to concrete, B20 min.
- On E30 and E90 assemblies no fastening components other than those E30, E90 Systems is allowed - Above E30, E90 Systems no fastening components other than those of E30, E90 Systems
- In E30, E90 Systems laying cables that do not conform with the above CI fire resistance standards
is not allowed
Optional transition from cable run of trays in the horizontal plane to the vertical plane only through the use of cable ladders.
No. of Pcs.
in Single Suspension CODE Catalogue PRODUCT No.
No.
OPTIONALLY TO COMPLETE THE SET *
LIST OF ELEMENTS TO CONNECT 2 PCS OF CABLE TRAYS LIST OF ELEMENTS TO CREATE SUPPORT
1 2 3
7 5 4
8 9*
10*
11*
6
13 12
14 15*
16 10*
11*
Cable Tray Straight Connector
Screw Set
Bracket
Ceiling Bracket Joint Plate
Threaded Rod Rod Hanger
Washer Nut Rod Grip
Screw Set Screw Set
Screw Set Bolt Anchor
Drop-In Anchor Washer
Nut
KCP/KCOP300H60/3 LPP/LPOPH60
SGKM6x12
WMC/WMCO300
WPCW/WPCO400 BL/BLO300
PGM10/1 USV/USOV
PP10 NSM10 UPW/UPWO
SGKM8x14 SMM10x30
SGKM6x12 PSROM10x80
TRSOM10 PP10 NSM10
161430 163111 651141
711130
750640 100130
651001 750709 650544 650244 750100
651241 650843
651141 804100
804800 650544 650244
2 2 16
1 1 1
1 1 4 4 1
2 2
2 2+1
1 2 2 Mounting threaded rod onto ceiling:
- indirectly through Rod Hanger USV/USOV with Bolt Anchor PSROM10 - directly with Drop-In Anchor TRSOM... without the use of Rod Hangers USV/USOV, on condition that the anchor is concrete-sank 60mm min.
60
=
*
16Cable Tray Thickness 1,5 mm Max. Spacing of Supports 1,2 m Max. Safe Load
10 kg/m for 1 level
Example of Assembly for Cables Distribution - Cable Ladder - and Cable Tray to the Ceiling on Two Levels.
Cable Tray Thickness and Cable Ladder 1,5 mm Max. Spacing of Supports 1,2 m
Max. Safe Load for the ladder 20 kg/m Max. Safe Load Cable Tray 10 kg/m
Example of Assembly for Cables Distribution - Cable Ladder - or korytku to the Ceiling.
2 3
18 9
10
14 13
16
1 6 4
7
11 12
20
15
5
8
19
17
No. of Pcs.
in Single Suspension CODE Catalogue No. No.
OPTIONALLY TO COMPLETE THE SET *
LIST OF ELEMENTS TO CONNECT 2 PCS OF CABLE TRAYS I 2 LADDERS LIST OF ELEMENTS TO CREATE SUPPORT
1 2 3
8 9 10 11 12*
13*
14*
15 16
18 4 5 6 7
19 20*
21 13 14 17
PRODUCT
Cable Ladder Straight Connector
Screw Set
Hold Down Clamp Bracket Rod Grip Threaded Rod
Rod Hanger Washer
Nut Screw Set Ceiling Bracket
Screw Set Screw Set Cable Tray Straight Connector
Screw Set Joint Plate
Screw Set Bolt Anchor
Bracket
Drop-In Anchor Washer
Nut
DGOP400H60/3N LDC/LDOCH60
SGKM8x14
ZM/ZMO WMC/WMCO400
UPW/UPWO PGM10/1 USV/USOV
PP10 NSM10 SGKM6x12 WPCW/WPCO400
SMM10x30 LPP/LPOPH60
SGKM6x12 BL/BLO300
SGKM8x14 WMC/WMCO300
PSROM10x80
TRSOM10 PP10 NSM10 KCP/KCOP300H60/3
863043 461001 651241
400700 711140 750100 651001 750709 650544 650244 651141 750640
650843 161430 163111 651141 100130
651241 804100 711130
804800 650544 650244
2 2 8
2 1 2 2 2 8 8 2 1
4 2 2 16
1
6 2+2
1
4 4 2 Mounting threaded rod onto ceiling:
- indirectly through Rod Hanger USV/USOV with Bolt Anchor PSROM10 - directly with Drop-In Anchor TRSOM... without the use of Rod Hangers USV/USOV, on condition that the anchor is concrete-sank 60mm min.
60
=
*
21Optional transition from cable run of trays in the horizontal plane to the vertical plane only through the use of cable ladders.
- Max. Spacing of Supports 1,2 m.
- Max. Safe Load cable tray load 10 kg/m.
- Max. number of cable run levels per single rod - 3 - Fastening to concrete, B20 min.
- On E30 and E90 assemblies no fastening components other than those E30, E90 Systems is allowed - Above E30, E90 Systems no fastening components other than those of E30, E90 Systems
- In E30, E90 Systems laying cables that do not conform with the above CI fire resistance standards is not allowed
No. of Pcs.
in Single Suspension CODE Catalogue No. No.
OPTIONALLY TO COMPLETE THE SET *
LIST OF ELEMENTS TO CONNECT 4 PCS OF CABLE TRAYS and 4 LADDERS LIST OF ELEMENTS TO CREATE SUPPORT
1 2 3
8 9 10 11 12*
13*
14*
15 16
18 4 5 6 7
19 20*
21 13 14 17
PRODUCT
Cable Ladder Straight Connector
Screw Set
Hold Down Clamp Bracket Rod Grip Threaded Rod
Rod Hanger Washer
Nut Screw Set Ceiling Bracket
Screw Set Screw Set Cable Tray Straight Connector
Screw Set Joint Plate
Screw Set Bolt Anchor
Bracket
Drop-In Anchor Washer
Nut
DGOP400H60/3N LDC/LDOCH60
SGKM8x14
ZM/ZMO WMC/WMCO400
UPW/UPWO PGM10/1 USV/USOV
PP10 NSM10 SGKM6x12 WPCW/WPCO400
SMM10x30 LPP/LPOPH60
SGKM6x12 BL/BLO300
SGKM8x14 WMC/WMCO300
PSROM10x80
TRSOM10 PP10 NSM10 KCP/KCOP300H60/3
863043 461001 651241
400700 711140 750100 651001 750709 650544 650244 651141 750640
650843 161430 163111 651141 100130
651241 804100 711130
804800 650544 650244
4 4 16
4 2 4 2 2 12 12 4 1
8 4 4 32
2
12 2+2
2
8 8 2 Mounting threaded rod onto ceiling:
- indirectly through Rod Hanger USV/USOV with Bolt Anchor PSROM10 - directly with Drop-In Anchor TRSOM... without the use of Rod Hangers USV/USOV, on condition that the anchor is concrete-sank 60mm min.
60
=
*
21Cable Tray Thickness and drabinki 1,5 mm Max. Spacing of Supports 1,2 m Max. Safe Load for the ladder 20 kg/m Max. Safe Load Cable Tray 10 kg/m
XIX
Example of Assembly for Cables Distribution - Cable Tray to the Ceiling.
10 1
12
3
7 4
5
6
2
8 9
Cable Tray Thickness 1,5 mm Max. Spacing of Supports 1,2 m Max. Safe Load 10 kg/m
11
No. of Pcs.
in Single Suspension CODE Catalogue PRODUCT No.
No.
OPTIONALLY TO COMPLETE THE SET *
LIST OF ELEMENTS TO CONNECT 2 PCS OF CABLE TRAYS LIST OF ELEMENTS TO CREATE SUPPORT
1 2 3
7*
5 4
8*
9 10 11 6*
12
13 7*
8*
Cable Tray
Drop-In Anchor
KCP/KCOP300H60/3
Bolt Anchor Threaded Rod
Rod Hanger Washer
Nut Support Channel
Screw Set Washer Straight Connector
Screw Set Joint Plate
Washer Nut
PGM10/1 USV/USOV
PP10 NSM10 CWP/CWOP40H40/04
SGKM6x12
PSROM10x80 PW6 LPP/LPOPH60
SGKM6x12 BL/BLO300
TRSOM10 PP10 NSM10
750709 651001
650544 650244 611104 651141
804100 650844 161430 163111 651141 100130
804800 650544 650244
2 2 8 8 1 2
2 2 2 2 16
1
2 4 4 Mounting threaded rod onto ceiling:
- indirectly through Rod Hanger USV/USOV with Bolt Anchor PSROM10 - directly with Drop-In Anchor TRSOM... without the use of Rod Hangers USV/USOV, on condition that the anchor is concrete-sank 60mm min.
60
=
*
13max.
150 mm
m ax. 150 mm
max distance to the next support 1200 mm
Recommended way to support the 90° Horizontal Bend close to the Connection with Cable Tray
KKPP/KKPOP
KCP/KCOP
Example of Assembly for Cables Distribution - Cable Ladder - to the Wall and Ceiling.
Ladder Material Thickness1,5 mm Max. Spacing of Supports 1,2 m Max. Safe Load 20kg/m for 1 level
Example of Assembly for Cables Distribution
- Cable Ladder - to the Wall and Ceiling on Two Levels.
2 3
4 5
6
7
8
9 10 11
1 12
No. of Pcs.
in Single Suspension CODE Catalogue PRODUCT No.
No.
OPTIONALLY TO COMPLETE THE SET *
LIST OF ELEMENTS TO CONNECT 2 LADDERS LIST OF ELEMENTS TO CREATE SUPPORT
DGOP400H60/3N LDC/LDOCH60
SGKM8x14 ZM/ZMO WFL/WFLO400
PD11 PGM10/1 USV/USOV
PP10 NSM10 SGKM8x14 PSROM10x80
TRSOM10 PP10 NSM10
863043 461001 651241 400700 720140 803100 651001 750709 650544 650244 651241 804100
804800 650544 650244 Cable Ladder
Straight Connector Screw Set Hold Down Clamp
Bracket Spacer Threaded Rod
Rod Hanger Washer
Nut Screw Set Bolt Anchor
Drop-In Anchor Washer
Nut 1
2 3 4 5 6 7 8*
9*
11 12*
13 9*
10*
2 2 8 2 1 1 1 1 4 4 2 1+1
1 2 2 Ladder Material Thickness1,5 mm
Max. Spacing of Supports 1,2 m Max. Safe Load 20 kg/m
Mounting threaded rod onto ceiling:
- indirectly through Rod Hanger USV/USOV with Bolt Anchor PSROM10 - directly with Drop-In Anchor TRSOM... without the use of Rod Hangers USV/USOV, on condition that the anchor is concrete-sank 60mm min.
60
=
*
13 10*No. of Pcs.
in Single Suspension CODE Catalogue PRODUCT No.
No.
OPTIONALLY TO COMPLETE THE SET *
LIST OF ELEMENTS TO CONNECT 4 LADDERS LIST OF ELEMENTS TO CREATE SUPPORT
DGOP400H60/3N LDC/LDOCH60
SGKM8x14 ZM/ZMO WFL/WFLO400
PD11 PGM10/1 USV/USOV
PP10 NSM10 SGKM8x14 PSROM10x80
TRSOM10 PP10 NSM10
863043 461001 651241 400700 720140 803100 651001 750709 650544 650244 651241 804100
804800 650544 650244 Cable Ladder
Straight Connector Screw Set Hold Down Clamp
Bracket Spacer Threaded Rod
Rod Hanger Washer
Nut Screw Set Bolt Anchor
Drop-In Anchor Washer
Nut 1
2 3 4 5 6 7 8*
9*
11 12*
13 9*
10*
4 4 16
4 2 2 1 1 6 6 4 2+1
1 4 4 10*
Mounting threaded rod onto ceiling:
- indirectly through Rod Hanger USV/USOV with Bolt Anchor PSROM10 - directly with Drop-In Anchor TRSOM... without the use of Rod Hangers USV/USOV, on condition that the anchor is concrete-sank 60mm min.
60
=
*
13XIX
- Max. Spacing of Supports 1,2 m.
- Max. Safe Load Cable Ladder load 10 kg/m.
- Max. number of cable run levels per single rod - 2 - Fastening to concrete, B20 min.
- On E30 and E90 assemblies no fastening components other than those E30, E90 Systems is allowed - Above E30, E90 Systems no fastening components other than those of E30, E90 Systems
- In E30, E90 Systems laying cables that do not conform with the above CI fire resistance standards
is not allowed
Example of Assembly for Cables Distribution - Cable Ladder - to the Wall and Ceiling.
1 2
3 5
7
11 6 9 10 4
8 12
Example of Assembly for Cables Distribution
- Cable Ladder - to the Wall and Ceiling on Two Levels.
Ladder Material Thickness1,5 mm Max. Spacing of Supports 1,2 m Max. Safe Load 20 kg/m
No. of Pcs.
in Single Suspension CODE Catalogue PRODUCT No.
No.
OPTIONALLY TO COMPLETE THE SET *
LIST OF ELEMENTS TO CONNECT 2 LADDERS LIST OF ELEMENTS TO CREATE SUPPORT
Cable Ladder Straight Connector
Screw Set Hold Down Clamp
Bracket Rod Grip Threaded Rod
Rod Hanger Washer
Nut Screw Set Bolt Anchor
Washer Nut
2 2 8 2 1 1 1 1 4 4 4 2+1
1 2 2 651241 400700 711140 750100 651001 750709 650544 650244 651241 863043 461001
804100
804800 650544 650244 DGOP400H60/3N
LDC/LDOCH60 SGKM8x14
ZM/ZMO WMC/WMCO400
UPW/UPWO PGM10/1 USV/USOV
PP10 NSM10 SGKM8x14 PSROM10x80
TRSOM10 PP10 NSM10 Drop-In Anchor
1 2 3 4 5 6 7 8*
9*
11 12*
13 9*
10*
Mounting threaded rod onto ceiling:
- indirectly through Rod Hanger USV/USOV with Bolt Anchor PSROM10 - directly with Drop-In Anchor TRSOM... without the use of Rod Hangers USV/USOV, on condition that the anchor is concrete-sank 60mm min.
60
=
*
13Ladder Material Thickness1,5 mm Max. Spacing of Supports 1,2 m Max. Safe Load 20kg/m for 1 level
No. of Pcs.
in Single Suspension CODE Catalogue PRODUCT No.
No.
OPTIONALLY TO COMPLETE THE SET *
LIST OF ELEMENTS TO CONNECT 4 LADDERS LIST OF ELEMENTS TO CREATE SUPPORT
Cable Ladder Straight Connector
Screw Set Hold Down Clamp
Bracket Rod Grip Threaded Rod
Rod Hanger Washer
Nut Screw Set Bolt Anchor
Washer Nut
4 4 16
4 2 2 1 1 6 6 8 4+1
1 4 4 651241 400700 711140 750100 651001 750709 650544 650244 651241 863043 461001
804100
804800 650544 650244 DGOP400H60/3N
LDC/LDOCH60 SGKM8x14
ZM/ZMO WMC/WMCO400
UPW/UPWO PGM10/1 USV/USOV
PP10 NSM10 SGKM8x14 PSROM10x80
TRSOM10 PP10 NSM10 Drop-In Anchor
1 2 3 4 5 6 7 8*
9*
11 12*
13 9*
10*
Mounting threaded rod onto ceiling:
- indirectly through Rod Hanger USV/USOV with Bolt Anchor PSROM10 - directly with Drop-In Anchor TRSOM... without the use of Rod Hangers USV/USOV, on condition that the anchor is concrete-sank 60mm min.
60
=
*
1310*
10*
- Max. Spacing of Supports 1,2 m.
- Max. Safe Load Cable Ladder load 10 kg/m.
- Max. number of cable run levels per single rod - 3 - Fastening to concrete, B20 min.
- On E30 and E90 assemblies no fastening components other than those E30, E90 Systems is allowed - Above E30, E90 Systems no fastening components other than those of E30, E90 Systems
- In E30, E90 Systems laying cables that do not conform with the above CI fire resistance standards
is not allowed
Example of Assembly for Cables Distribution - Cable Ladder - to the Wall and Ceiling.
Ladder Material Thickness1,5 mm Max. Spacing of Supports 1,2 m Max. Safe Load 20 kg/m
8
1 2
3
10
5
11 6
7
9 4
12
Example of Assembly for Cables Distribution
- Cable Ladder - to the Wall and Ceiling on Two Levels.
No. of Pcs.
in Single Suspension CODE Catalogue PRODUCT No.
No.
OPTIONALLY TO COMPLETE THE SET *
LIST OF ELEMENTS TO CONNECT 2 LADDERS LIST OF ELEMENTS TO CREATE SUPPORT
Drop-In Anchor Cable Ladder Straight Connector
Screw Set Hold Down Clamp
Bracket Rod Grip Threaded Rod
Rod Hanger Washer
Nut 1
2 3 4 5 6 7 8*
9*
10*
Screw Set 11
Bolt Anchor 12*
13 804800
Washer Nut 9*
10*
650544 650244 651241 400700 805240 750100 651001 750709 650544 650244 651241 863043 461001
804100 2 2 8 2 1 1 1 1 4 4 4 2+1
2 2 1 SGKM8x14
ZM/ZMO WU/WUO400
UPW/UPWO PGM10/1 USV/USOV
PP10 NS M10 SGKM8x14 PSROM10x80
TRSOM10 PP10 NSM10 DGOP400H60/3N
LDC/LDOCH60
Mounting threaded rod onto ceiling:
- indirectly through Rod Hanger USV/USOV with Bolt Anchor PSROM10 - directly with Drop-In Anchor TRSOM... without the use of Rod Hangers USV/USOV, on condition that the anchor is concrete-sank 60mm min.
60
=
*
13Ladder Material Thickness1,5 mm Max. Spacing of Supports 1,2 m Max. Safe Load 20kg/m for 1 level.
No. of Pcs.
in Single Suspension CODE Catalogue PRODUCT No.
No.
OPTIONALLY TO COMPLETE THE SET *
LIST OF ELEMENTS TO CONNECT 4 LADDERS LIST OF ELEMENTS TO CREATE SUPPORT
Drop-In Anchor Cable Ladder Straight Connector
Screw Set Hold Down Clamp
Bracket Rod Grip Threaded Rod
Rod Hanger Washer
Nut 1
2 3 4 5 6 7 8*
9*
10*
Screw Set 11
Bolt Anchor 12*
13 804800
Washer Nut 9*
10*
650544 650244 651241 400700 805240 750100 651001 750709 650544 650244 651241 863043 461001
804100 4 4 16
4 2 2 1 1 6 6 8 4+1
4 4 1 SGKM8x14
ZM/ZMO WU/WUO400
UPW/UPWO PGM10/1 USV/USOV
PP10 NS M10 SGKM8x14 PSROM10x80
TRSOM10 PP10 NSM10 DGOP400H60/3N
LDC/LDOCH60
Mounting threaded rod onto ceiling:
- indirectly through Rod Hanger USV/USOV with Bolt Anchor PSROM10 - directly with Drop-In Anchor TRSOM... without the use of Rod Hangers USV/USOV, on condition that the anchor is concrete-sank 60mm min.
60
=
*
13XIX
- Max. Spacing of Supports 1,2 m.
- Max. Safe Load Cable Ladder load 10 kg/m.
- Max. number of cable run levels per single rod - 3 - Fastening to concrete, B20 min.
- On E30 and E90 assemblies no fastening components other than those E30, E90 Systems is allowed - Above E30, E90 Systems no fastening components other than those of E30, E90 Systems
- In E30, E90 Systems laying cables that do not conform with the above CI fire resistance standards
is not allowed
Example of Assembly for Cables Distribution - to the Wall on Two Levels.
- Cable Ladder
Ladder Material Thickness1,5 mm Max. Spacing of Supports 1,2 m Max. Safe Load 20 kg/m
No. of Pcs.
in Single Suspension CODE Catalogue PRODUCT No.
No.
LIST OF ELEMENTS TO CONNECT 4 LADDERS LIST OF ELEMENTS TO CREATE SUPPORT
1 2 3
12 5 6
8 9 10 11 4
13
Cable Ladder Straight Connector
Screw Set Hold Down Clamp
Bracket Rod Grip
Threaded Rod Rod Hanger
Washer Nut Screw Set Bolt Anchor
DGOP400H60/3N LDC/LDOCH60
SGKM8x14 ZM/ZMO WMC/WMCO400
UPWK/UPWKO
PGM10/1 WKPO
PP10 NSM10 SGKM8x14 PSROM10x80
863043 461001 651241 400700 711140 752900
651001 750809 650544 650244 651241 804100
4 4 16
4 2 1
2 1 8 8 4 5 Ladder Material Thickness1,5 mm
Max. Spacing of Supports 1,2 m Max. Safe Load 20 kg/m
No. of Pcs.
in Single Suspension CODE Catalogue PRODUCT No.
No.
LIST OF ELEMENTS TO CONNECT 2 LADDERS LIST OF ELEMENTS TO CREATE SUPPORT
1 2 3
11 5 6 7 8 9 10
4
12
Cable Ladder Straight Connector
Screw Set Hold Down Clamp
Bracket Rod Grip Threaded Rod
Rod Hanger Washer
Nut Screw Set Bolt Anchor
DGOP400H60/3N LDC/LDOCH60
SGKM8x14 ZM/ZMO WMC/WMCO400
UPWK/UPWKO PGM10/1
WKPO PP10 NSM10 SGKM8x14 PSROM10x80
863043 461001 651241 400700 711140 752900 651001 750809 650544 650244 651241 804100
2 2 8 2 1 1 1 1 4 4 4 3
Example of Assembly for Cables Distribution - Cable Ladder - to the Wall.
Possibility to mount the threaded rod to the wall use Articulated Rod Hanger WPPGV/WPPOV and Anchor Bolt PSROM10
5 7
8
12
10
6
9 11
4 1
3 2
7 Rod Grip UPW/UPWO 750100 2