Project Management

Software Development Cycle

and Roles in a Project Team

(2)

Software Developement Cycle

Software Development Stages

(3)

Software Development Stages

Planning

Development

Implementation

Maintenance

(4)

Software Development Stages

Planning Development Implementation

Maintenance

(5)

Stage 1: Planning

Studying the problem domain

Preparing a Design Document

Deciding on the schedule

Setting up a budget

Assigning roles in the project

(6)

Stage 2: Development

Programming the solution

Designing the Graphical User Interface

Testing – Quality Assurance

(7)

Stage 3: Implementation

Data Porting

Preparation of the User Documentation

Personel Training

(8)

Stage 4: Maintenance

Technical Support

Patches

Updates

Administration

(9)

Software Development Stages

Planning Development Implementation

Maintenance

(10)

Roles in a Project Team

Roles and responsibilities at the different stages of the software

development cycle

<O>

(11)

Client/Sponsor

Describe the requirements

Provide the team with sufficient funding

(12)

Project Manager

Securing resources and support from the client

Dealing with problems and solving them

Preparing schedules and assigning roles

Managing the budget and human resources

Supervising the project

Keeping track of deadlines

(13)

Analysts

Business Analysts

Requirement Analysts

(14)

Business Analysts

Discussing the project with the client

Making sure the client is sure that what the client wants is what he really wants

Preparing a list of business requirements

(15)

Requirement Analysts

Translating the business specification to technical specification

Writing a Design Document

(16)

Programmers

Programming the solution

Getting rid of as many bugs as possible

(17)

Lead Programmer

Designing the solution’s skeleton

Focusing on:

Maintenance

Application Performance

Compatibility

(18)

The Others

2D and 3D Artists

Sound Designers

Musicians

Database Designers and Developers

Network Consultants

GUI Designers

(19)

Quality Assurance/Testers

Testing the application to find bugs

Being able to communicate to the

programmers what the problem is

(20)

Documentation Writer

Prepares a documentation for the users

(User Manual)

(21)

Tech Support & Admins

Assisting the users with any problems they might encounter

Helping to solve the problems

Administrating databases and servers

(22)

The End

That’s all folks!

Cytaty

Powiązane dokumenty

Om dezelfde redenen zal ook de baan van een steen nadat deze tegen de pijler- wand is gebotstvoornamelijk worden bepaald door de vorm van de pijler en de steen, en in mindere mate

regarding the properties of mid-altitude winds which are crucial for the assessment of airborne wind energy (AWE) generators [1,2].. Wind data in mid-altitudes is available in

The analysis of two approaches to leadership (i.e. transformational), in regard to growing demand for versatility of Project Manager, points to the necessity of continuous

A development activity of investment projects in the form of Real Estates with modern retail area can be categorised into a group of industrial services rendered by enterprises for

– the phase of integrated design – when there are scientific and commercial suites of methodologies of IT project management which are the conglomerate of methods of project

responsible for more than one stage of process - analyst / designer and programmer.. - analyst and designer

Game Master - generates the board and the shape of the project goals, holds the real state of the game and generates new pieces on the tasks area Player - an agent playing the