• Nie Znaleziono Wyników

Simulatie van een ferro-alloys terminal. Een computersimulatie in Taylor II (summary)

N/A
N/A
Protected

Academic year: 2021

Share "Simulatie van een ferro-alloys terminal. Een computersimulatie in Taylor II (summary)"

Copied!
1
0
0

Pełen tekst

(1)

Delft University of Technology

Faculty Mechanical, Maritime and Materials Engineering Transport Technology / Logistic Engineering

R.C. Govers Simulatie van een ferro-alloys terminal: een computersimulatie in Taylor II. Computer program, Report 97.3.LT.4932, Transport Technology, Logistic Engineering.

This computer simulation program has been written for the department Transport Technology of the Technical University of Delft. A simulation had to be made of a ferro-alloys terminal which will be build in the Port of Rotterdam. On this terminal the ferro-alloys will be stored, transported and processed. These activities will be simulated in Taylor II version 4.1. This is a computer program especially designed for simulations.

The first problem was to deterinine how many trucks will be needed to assure a maximum capacity of the quay crane when a ship lies at the quay. The second problem was to determine how many bulldozers will be needed to make sure that the process of breaking and sifting will work at maximum capacity.

The trucks will work between the quay crane and the storage warehouse. The bulldozers will be working between the machine buffers and the storage warehouse.

With Taylor II version 4.1, two simulation models experiments have been made. One of the discharge process and one of the breaking and sifting process. Both processes are built out of standard elements. The different elements which have been used are: machines, buffers, transporters and paths. From the simulation it is very clear how the ferroalloys are moving and processed over the terminal, also visible is if the machines work as expected. After experimenting with both simulation models, the number of trucks and bulldozers necessary have been set. It is assumed that every ten days a portion of 10.000 tons of ferro-alloys still to be processed will arrive. It appears that 2 trucks will be needed to guarantee a maximum capacity of the quay crane. Also 5 bulldozers will be needed to make sure buffers are filled and made emptied in due time.

Reports on Logistic Engineering (in Dutch)

Cytaty

Powiązane dokumenty

23 Tekst jedn. Maciej Zieliński, Wykładnia prawa.. Taka wskazówka sądu jest bardzo oczywista. Z kolei druga dana w cytowa- nym judykacie odsyła, przy ustalaniu znaczenia tego

I jeszcze jeden rys charakteru Komendanta, podany przez Wacława Siero- szewskiego, tym razem jako „człowieka czynu”, konstruktora strategicznego, legionisty i frontowca (równolegle

In the specific context of the West it is also necessary to point at the influence of Christianity which profoundly influenced and transformed the cultural profile

Zaproponowany, nowy instrument stabilizacji dochodów (IST) rodzi jednak pewne obawy. Mianowicie podstawą jego wdrożenia i realizacji jest ewidencja dochodów

This paper deals with the phenomenon of V-to-T movement, which is one of the major parameters differentiating Romance from the majority of modern Germanic languages, and it defends

tej piosenki jest jasny: najważniejsze jest to, że jesteście sobą, a nie to, jak inni was postrzegają. W piosence Shake it off śpiewa o ludziach, którzy krytykują ją za jej

2. 2% of newly manufactured processors have damaged cores. A laptop with a damaged core overheats; overheating also appears in 0.002% of laptops with fully functional cores. We

How many errors will detect and how many will correct the code which repeats each digit seven times?. Consider the linear code generated by the