Title Deliverable:
Report on monitoring in the flood season in Cambodia in 2006 en 2007
DC-Project code:
DC Project Title:
WAOP
CT05.10
DC-Work package code
DC Work Package Title:
Mekong case
CT05.14.11
Principal Author 1:
Department of Hydrology and River
Works
Institute:
Principal Author 2:
Ministry of Water Resources and
Meteorology
Institute:
Contributor 1:
Institute
Contributor 2:
Institute
Report Type:
Final report
Report Status:
Definitief
Number of pages:
134
Number of
Annexes:
Keywords (3-8):
Mekong programme, roads and floods, environmentally friendly guidelines, floodplains
Abstract:
The FMMP is cooperating with WWF Living Mekong Programme, and three Delft
Cluster institutes (UNESCO-IHE, Delft Hydraulics and Geodelft) to implement a 2 year
'Roads and Floods' project. The project aims at developing economically sound and
environmentally friendly guidelines for the planning and design of roads in the Mekong
floodplains of Cambodia and Vietnam. The project is an integral part of the FMMP
Component 2 and contributes to Output 1.3 ('guidelines for effectiveness, use and impact
assessment of structural interventions').
In order to achieve the objectives of the 'Roads and Floods' project, various field
survey/monitoring activities will be executed and additional data will be collected.
Generally, the activities will contribute to:
. Development of a detailed 1020 inundation model for the study area.
. Assessments of damage to infrastructure (roads and permeability structures) due to
flooding events. The type of damage and the underlying failure mechanisms will
be determined from survey data and possibly historical data.
Institute Publication-number (optional):
Isbn:
Issn:
DC-Publication-number (invullen door DC):
CT05.14.R02
KINGDOM OF CAMBODIA
Nation Religion King
REPORT
on
MONITORING
IN THE FLOOD SEASON
IN CAMBODIA IN 2006 AND 2007
CONTENTS
Page
1
Introduction
1
2
Pilot
sites
to
be
Survey
and
Studied
1
3
Field
Survey
Monitoring
2
4
Flood
Survey
Requirement
7
A-
Hydraulic
Survey
Requirement
7
Scopes of Works for Flood Marks
Installation 10
Installation Process
10
Scopes of Works for Flow Measurement Survey
12
B-1: Road damage data at Site C1 during flood survery
17
B-2: Road damage data at Site C1 in post flood survey
24
C-1: Road Damage Data at Site C2 during flood survery
27
C-2: Road Damage Data at Site C2 in post flood survery
32
5
Conclusion
35
Annex A-Monitoring Location in Cambodia in Pilot Site C1
3
Annex B- Monitoring Location in Cambodia in Pilot Site C2
6
LIST OF TABLE
Table 1 : ADP Discharge measurement at C1-H1
T-1
Table 2 : ADP Discharge measurement at C1-H2
T-2
Table 3 : ADP Discharge measurement at C1-H3
T-3
Table 4 : ADP Discharge measurement at C1-H4
T-4
Table 5 : Discharge measurement by Current Meter at C1-H5
T-5
Table 6 : ADP Discharge measurement at C1-H6
T-6
Table 7 : ADP Discharge measurement at C1-H10
T-7
Table 8 : ADP Discharge measurement at C2-H1
T-8
Table 9 : ADP Discharge measurement at C2-H2
T-9
Table 10 : ADCP Discharge measurement at C2-H3
T-10
Table 11 : Discharge measurement by Current Meter at C2-H5
T-11
Table 12 : ADCP Discharge measurement at C1-H6
T-11
Table 13 : Discharge measurement by Current Meter at C2-H7 (1/2)
T-12
Table 14 : ADCP Discharge measurement at C1-H4
T-13
Table 15 : ADP Discharge measurement at C1-H1
T-14
Table 18 : ADCP Discharge measurement at C1-H4
T-17
Table 19 : Discharge measurement by Current Meter at C1-H5
T-18
Table 20 : ADCP Discharge measurement at C1-H6
T-19
Table 21 : ADCP Discharge measurement at C1-H10
T-20
Table 22 : ADP Discharge measurement at C2-H1
T-21
Table 23 : ADP Discharge measurement at C2-H2
T-22
Table 24 : ADCP Discharge measurement at C2-H3
T-23
Table 25 : Discharge measurement by Current Meter at C2-H5
T-24
Table 26 : ADCP Discharge measurement at C2-H6
T-25
Table 27 : Discharge measurement by Current Meter at C2-H7
T-25
Table 28 : ADP Discharge measurement at C2-H8
T-26
Table
H-1
:
Gauge
Height
at
C1-H1
(1/3)
H-1
Table
H-1
:
Gauge
Height
at
C1-H1
(2/3)
H-2
Table
H-1
:
Gauge
Height
at
C1-H1
(3/3)
H-3
Table
H-2
:
Gauge
Height
at
C1-H2
(1/2)
H-4
Table
H-2
:
Gauge
Height
at
C1-H2
(2/2)
H-5
Table
H-3
:
Gauge
Height
at
C1-H3
(1/2)
H-6
Table
H-3
:
Gauge
Height
at
C1-H3
(2/2)
H-7
Table
H-4
:
Gauge
Height
at
C1-H4
(1/2)
H-8
Table
H-4
:
Gauge
Height
at
C1-H4
(2/2)
H-9
Table
H-5
:
Gauge
Height
at
C1-H5
(1/2)
H-10
Table
H-5
:
Gauge
Height
at
C1-H5
(2/2)
H-11
Table
H-6
:
Gauge
Height
at
C1-H6
(1/2)
H-12
Table
H-6
:
Gauge
Height
at
C1-H6
(2/2)
H-13
Table
H-7
:
Gauge
Height
at
C1-H7
(1/2)
H-14
Table
H-7
:
Gauge
Height
at
C1-H7
(2/2)
H-15
Table
H-8
:
Gauge
Height
at
C1-H8
(1/2)
H-16
Table
H-8
:
Gauge
Height
at
C1-H8
(2.2)
H-17
Table
H-9:
Gauge
Height
at
C1-H9
(1/2)
H-18
Table
H-9
:
Gauge
Height
at
C1-H9
(2/2)
H-19
Table H-10 : Gauge Height at C1-H10 (1/2)
H-20
Table
H-10:
Gauge
Height
at
C1-H10
(2/2)
H-21
Table
H-11
:
Gauge
Height
at
C2-H1
(1/3)
H-22
Table
H-11
:
Gauge
Height
at
C2-H1
(2/3)
H-23
Table
H-11
:
Gauge
Height
at
C2-H1
(3/3)
H-24
Table
H-12
:
Gauge
Height
at
C2-H2(1/3)
H-25
Table
H-12
:
Gauge
Height
at
C2-H2(2/3)
H-26
Table
H-12
:
Gauge
Height
at
C2-H2(3/3)
H-27
Table
H-13
:
Gauge
Height
at
C2-H3
(1/3)
H-28
Table
H-13
:
Gauge
Height
at
C2-H3
(2/3)
H-29
Table
H-13
:
Gauge
Height
at
C2-H3
(3/3)
H-30
Table
H-14
:
Gauge
Height
at
C2-H4
(1/3)
H-31
Table
H-14
:
Gauge
Height
at
C2-H4
(2/3)
H-32
Table
H-14
:
Gauge
Height
at
C2-H4
(3/3)
H-33
Table
H-15
:
Gauge
Height
at
C2-H5
(1/3)
H-34
Table
H-17
:
Gauge
Height
at
C2-H8
(1/3)
H-40
Table
H-17
:
Gauge
Height
at
C2-H8
(2/3)
H-41
Table
H-17
:
Gauge
Height
at
C2-H8
(3/3)
H-42
LIST OF FIGURE
Fig. 1: Cross Section of Site C1-H1 at Stung Slot River National Road #1
F-1
Fig.2: Cross Section of site C1-H2 at Kampong Seong Station on road # 318
F-1
Fig. 3: Cross Section of site C1-H3 at
Tonle
Torch
River
F-2
Fig. 4: Cross Section of site C1-H4 on Road #11 downstream of bridge
F-2
Fig. 5: Cross Section of site C1-H5
of
Boeung
Sner
F-3
Fig. 6: Cross Section of site C1-H6 of Tonle Toch river at Peam Sdei
F-3
Fig. 7: Cross Section of site C1-H7 at Khsach Sar
F-4
Fig. 8: Cross Section of site C1-H8
at
Prek
Khsai
Kor
F-4
Fig. 9: Cross Section of site C1-H10 at Prek Raing on National Road #1
F-5
Fig. 10: Cross Section of site C2-H1
at
Bridge
No
24 F-5
Fig. 11: Cross Section at stite C2-H2
of
Bridge
No
23
F-6
Fig. 12: Cross Section of site C2-H3
at
Tros
bridge
F-6
Fig. 13: Cross Section of C2-H5 at Reay Pay
F-7
Fig. 14: Cross Section of site C2-H6
at
Anlong
Chrey
F-7
Fig. 15: Cross Section of site C2-H7
at
Anlong
Koki F-8
Fig. 16: Cross Section of site C2-H8
at
Bridge
No
17
F-8
Fig. 17: Cross Section of Stung Slot
river
at
C1-H1
F-9
Fig. 18: Cross Section of site C1-H2 at Kampong Seong Station on road # 318
F-9
Fig. 19: Cross Section of site C1-H3 at
Tonle
Torch
River
F-10
Fig. 20: Cross Section of site C1-H4 on Road #11 downstream of bridge
F-10
Fig. 21: Cross Section of site C1-H5 of Boeung Sner
F-11
Fig. 22: Cross Section of site C1-H6 of Tonle Toch river at Peam Sdei
F-11
Fig. 23: Cross Section of site C1-H7 at Khsach Sar
F-12
Fig. 24: Cross Section of site C1-H8 at Prek Khsai Kor
F-12
Fig. 25: Cross Section of site C1-H10 at Prek Raing on National Road #1
F-13
Fig. 26: Cross Section of site C2-H1
at
Bridge
No
24 F-13
Fig. 27: Cross Section at stite C2-H2
of
Bridge
No
23
F-14
Fig. 28: Cross Section of site C2-H3
at
Tros
bridge
F-14
Fig. 29: Cross Section of C2-H5 at Reay Pay
F-15
Fig. 30: Cross Section of site C2-H6
at
Anlong
Chrey
F-15
Fig. 31: Cross Section of site C2-H7
at
Anlong
Koki F-16
Fig. 32: Cross Section of site C2-H8
at
Bridge
No
17
F-16
Fig.33:
Monthly
rainfall
at
Pochentong
in
2007
F-17
Fig.34:
Monthly
Rainfall
at
Kandal
in
2007
F-18
Fig.35: Monthly Rainfall at Kompong
Cham
in
2007 F-19
Fig.36: Monthly Rainfall at Prey
Veng
in
2007
F-20
1
Introduction
The FMMP is cooperating with WWF Living Mekong Programme, and three Delft
Cluster institutes (UNESCO-IHE, Delft Hydraulics and Geodelft) to implement a 2 year
'Roads and Floods' project. The project aims at developing economically sound and
environmentally friendly guidelines for the planning and design of roads in the Mekong
floodplains of Cambodia and Vietnam. The project is an integral part of the FMMP
Component 2 and contributes to Output 1.3 ('guidelines for effectiveness, use and impact
assessment of structural interventions').
In order to achieve the objectives of the 'Roads and Floods' project, various field
survey/monitoring activities will be executed and additional data will be collected.
Generally, the activities will contribute to:
. Development of a detailed 1020 inundation model for the study area.
. Assessments of damage to infrastructure (roads and permeability structures) due to
flooding events. The type of damage and the underlying failure mechanisms will
be determined from survey data and possibly historical data;
The FMMP in cooperation with CNMC will coordinate the flood, post flood survey and
data collection activities in the Cambodia that will be contracted out to the Department of
Hydrology and River Work - Ministry of Water Resources and Meteorology. The survey
activities will focus on the area of two pilot sites in the Cambodia' flood plain with a size
of about 20 by 20 kilometers during the year 2006 and 2007.
The findings in the pilot sites will be scaled-up to representative sub-floodplain regions
for analyzing road and flood interactions and cumulative effects.
2
Pilot Sites to be Surveyed and Studied
The project team has selected two pilot sites in the Cambodia flood plain namely C 1
and C2 for further study. All survey activities will be undertaken in the two pilot
sites.
The coordinates for the pilot site are (UTM zone 48N Indian 1960):
. Upper right comer: 105°25' 19.0" E, 11 °25' 8.5" N
Zone 1 Zone 2 Zone 4 Zone 5 N 17 1 2 3 4 5 6 7 15 11 12 10 20 13 14 18 19 8 9 Kompong Cham Prek Kdam Mekong River Tonle Sap River
Pilot site C2
3
Field Survey Monitoring
The survey activities will be only carried out in the pilot sites which focus on road and
associated structure and hydraulic monitoring locations. The survey activities will be
conducted in two year 2006 and 2007 with two main group: i) flood survey for year 2006
and 2007 and ii) post flood survey for 2007 (post flood survey for 2006 will be done by
regional consultant and FMMP staff).
Table 1: Monitoring moments and specific scopes.
ANNEX A
MONOTORING LOCATIONS IN CAMBODIA IN PILOT SITE C1
Pilot site C1 (see Figure 1)
o The hydraulic monitoring will be executed in 10 different monitoring
locations
(codes C1-H1 till C1-H10), see Figures A.2 – A.10 for exact locations.
Figure A.1
Pilot site C1 in Cambodia.
Survey moment
Main scope
Time period
Flood monitoring
•
Road condition
•
Damage
•
Flooding characteristics
One time in falling period
for 2006 flood and repeat
for 2007
Post-flood survey
•
Road condition
•
Damage
Figure A.2 Monitoring location C1-H1
(upstream of the bridge of Highway (national
road) #1 in the Prek Banam or Veal Robang
river)
Figure A.3 Monitoring location C1-H2
(downstream of the bridge of provincial road #
318 in the Prek Kampong Soeng or Prek
Trabek river)
C1-3
C1-4
Figure A.5 Monitoring location C1-H5 (could
possibly be similar to water level observation
station # 15 (Boeung Sner)
Figure A.6 Monitoring location C1-H6 (just
downstream of confluence in Tonle Toch
river, near Ph Peam Sdei)
Figure A.7 Monitoring location C1-H7 (west
of Ph Svay Khnei)
C2-H8
C2-H1
C2-H2
C2-H3
C2-H5
C2-H6
C2-H7
C2-H4
ANNEX B
MONOTORING LOCATIONS IN CAMBODIA IN PILOT SITE C2
o The hydraulic monitoring will be executed in 8 different monitoring
locations
B.2 Monitoring location C2-H1 (upstream of
the bridge of Highway (national road) # 6 in
the Prek Krang Svay river; similar to
monitoring location TLSV project - 2002)
B.3 Monitoring location C2-H2 (upstream
of the bridge of Highway (national road) #
6 in the Prek Muk Kampul river; similar to
monitoring location TLSV project - 2002)
B.4 Monitoring location C2-H3 (upstream of
the bridge of Highway (national road) # 6 in
Boeng Peal lake; similar to monitoring site
TLSV project - 2002)
B.6 Monitoring location C2-H5 (in the Prek
Kang Chak river, after the confluence with
the Prek Dei Kraham river, downstream of
the bridge)
B.7 Monitoring location C2-H6 (in the Prek
Muk Kampul, after the bifurcation with the
Prek Dei Kraham river)
B.8 Monitoring location C2-H7 (in the
stream draining Boeng Taprong lake into the
Prek Koy river, upstream of the bridge, near
Phum Anlong Koki)
B.9 Monitoring location C2-H8 (along
Highway (national road) # 6, upstream of
culvert in Phum Prek Dambang)
•
Damage assessments to infrastructure (roads and permeability structures) due to
flooding events. The type of damage and the underlying failure mechanisms will be
determined from monitoring data and possibly historical data. Ideally, the damage
should be expressed in unit costs specified to different road classes. These activities
are referred to as ‘damage assessments’.
4
Flood Survey Requirement
The purposes of survey campaign in flood season area:
. to measure the water level and flows (hydraulic survey) at monitoring points for
hydraulic model development (including calibration, verification and simulations); and
. to collect information of road damages in the pilot sites for damage assessments.
A-Hydraulic survey requirement
The execution of the flood survey will be during the flood falling period in year 2006 and
repeated in year 2007 expectedly sometime in October. It means that only one flood
survey will be carried out per year. The damage survey will be conducted in the period of
hydraulic survey.
The hydraulic survey will be conducted at 18 monitoring locations. In site CI, there are
10 locations will measured namely CI-HI till CI-HIO. In site C2, there are 8 locations
(see figure B 1 to B9 in Annex B) will be measured namely C2-HI till C2-H8.
The hydraulic survey activities cover:
. To install 15 Staff gauge with Ha Tien datum (before flood come) at 15 monitoring
locations as described above. The traditional method should be employed for
leveling work but not by GPS method. Required accuracy for leveling is ±l cm.
. To simultaneously measure water levels and 2D velocity by ADCP at 15 installed
staff gauges. Discharge, water depth will be derived from measured water level and
2D velocity .
. To continuous collecting water levels at 4 permanent gauging stations (managed by
MOWRAM) in the floodplain (4 permanent stations: PI5 near site CI, P13 upstream
of site Cl, PI upstream of site C2, PIO downstream site);
Frequency of water levels and 2D velocity monitoring:
. Conducting 15 locations water level and 2D velocity measurement for two flood
seasons: 2006 and 2007.
. In each year, the measurement will be conducted 1 time during falling period of flood
season;
In each time at each location, the water level and 2D velocity at every monitoring
location will be continuously measured for 1 day with 1 hour interval. It means 11 water
levels and eleven 2D velocity values will be collected in one day at one site. Because of
limitation of equipment and staff, the measurement for all locations cannot be conducted
simultaneously. With available equipment and staff, it is planned to measure
Scopes of Work for Flood Marks Installation
To timely develop and install the flood-referencing tool (flood marks) in the
selected 18 flood marks. The flood marks installation should be done before
floods in 2006. According to the Terms of Reference, team should carry out tasks
and produce the outputs as follows
A
Install 15 flood marks at Two Pilot area C1 and C2:
B
Leveling survey
Measure the geographical location (zero gauge), position and height of the 18
flood marks at the 2 Pilot area based on the nearest bench marks at exiting flood
marks and Bassac and Neak Loung stations.
These GPS survey have to be carried out using similar technique applied with
Last flood marks installation project and Tonle Sap and its vicinity-TSLV project
1. Outputs
15 flood marks are installed according to the MRC standard at the selected
location as follows.
Village Name
Approx. Lat
Approx. Long Max. Flood (m)
No 1
C1-H1
535397
1242912
10.0
No 2
C1-H2
538812
1240428
5.00
No 3
C1-H3
531094
1251321
3.00
No 4
C1-H4
532055
1250666
3.00
No 5
C1-H5
541773
1257805
4.00
No 6
C1-H7
541220
1250476
3.00
No 7
C1-H8
531175
1247603
5.00
No 8
C1-H9
533995
1253707
4.00
No 9
C1-H10
533841
1244162
4.00
No 10
C2-H1
495606
1312424
8.00
No 11
C2-H2
496343
1310392
7.00
No 12
C2-H3
493865
1319268
7.00
No 13
C2-H4
510836
1310211
3.00
No 14
C2-H7
500654
1311503
2.00
No 15
C2-H8
497737
1306000
2.00
Fifteen geographic locations, latitude, longitude and height in either UTM zone
48, Everest Spheroid, WGS84 Datum, or UTM zone 48, Everest Spheroid,
INDIAN60 Datum, have to be delivered to MRC by TORs.
Installation Process
During the installation, at each location, the Village observer provided the
necessary services including the identification of proposed Flood mark spot and
others. The team measured the geographical locations (zero gauge), position and
height of the spots.The measurement the geographical location position and
elevation of two Pilot area was based on the benchmarks at Last flood marks
installation project and Bassac and Neak Loung Hydrological Station.( GPS
GARMIN)
NIVELER (TY: NA2- LEICA) was used for leveling relocate the flood marks.
The accuracy ±3mm.
The team consisted of Department of Hydrology and River Works official staff
from provincial/district Department. Names of those officials are as listed bellow
• Hydrology Department
1. Sam Sopheak Team Leader of flood marks installation
2. Khum Vanny Technical staff
3. Non Veun Technical staff
4. Den Rotha Driver
• Provincial/District observer
Pilot area C1
Nom Hen
Observer C1-H1
Sac Khor
Observer C1-H2
Tear Aer
Observer C1-H3
Tear Aer
Observer C1-H4
Tear Aer
Observer C1-H5
Pech Sophal
Observer C1-H7
Tear Aer
Observer C1-H8
Moun Mear
Observer C1-H9
Nom Hen
Observer C1-H10
Pilot area C2
Bo Sac
Observer C2-H1
Soun Tit
Observer C2-H2
Sorn Toeun
Observer C2-H3
Cheang Meng Keat
Observer C2-H4
Phout Bunhon
Observer C2-H7
Tho Sokha
Observer C2-H8
Scopes of Work for Flow Measurement Survey
The flow Measurement Survey has been done for flood monitoring from 24-Sep to 05 Oct 2007
and after flood from 24 Oct to 03 Nov 2007. According to the Terms of Reference, team should
carry out tasks and produce the outputs as follows
• Discharge Measurement:
- by using Accoustic Douppler Profiler (ADP) and Current Meter at C1
- by using Current Meter and Accoustic Douppler Current Profier (ADCP) for C2.
• Cross-Sectional Survey and Longitudinal Survey including river bank and river bed
survey by using ADCP and leveling instrument.
This kind of works covered several flood Plain C1 and C2 stations such as:
Village Name
Approx. Lat
Approx. Long Max. Flood (m)
No 1
C1-H1
535397
1242912
10.0
No 2
C1-H2
538812
1240428
5.00
No 3
C1-H3
531094
1251321
3.00
No 4
C1-H4
532055
1250666
3.00
No 5
C1-H5
541773
1257805
4.00
No 6
C1-H7
541220
1250476
3.00
No 7
C1-H8
531175
1247603
5.00
No 8
C1-H9
533995
1253707
4.00
No 9
C1-H10
533841
1244162
4.00
No 10
C2-H1
495606
1312424
8.00
No 11
C2-H2
496343
1310392
7.00
No 12
C2-H3
493865
1319268
7.00
No 13
C2-H4
510836
1310211
3.00
No 14
C2-H7
500654
1311503
2.00
No 15
C2-H8
497737
1306000
2.00
The result of the flood survey during 24-Sep to 05 Oct 2007 is as follows:
- 70 discharge measurements were made for C1
- 61 discharge measurements were made for C2
The result of the post flood survey 24 Oct to 03 Nov 200 is as follows:
- 70 discharge measurements were made for C1
- 61 discharge measurements were made for C2
Sites C1-H1
Sites C1-H2
Sites C1-H7
Sites C1-H8
Sites C2-H1
Sites C2-H2
Sites C2-H3
Sites C2-H4
Sites C2-H7
Sites C2-H8
B-1. Road Damage data at Site C1 during flood survey
- Road damage by wave and wind from the lake near Khsach Sar bridge.
- Location of road damage 05411403 and 1250526
48 P UTM Zone.
1- Depth
= 1.50 m
2- Width
= 1.00 m
3- Length
= 200 m
Road surface erosion
Direction slope 1 Direction slope 2
slope erosion 2?
Toe erosion 1? D2 = 1.5 m
- Road damage and concrete pipe across the road at the Phum kam Pang Khum Teay
Baphnom District . Location of road damage 05433730 and 1254937
48 P UTM Zone.
1- Depth
= 1.20 m
2- Width
= 6.00 m
3- Length
= 1.00 m
Road surface erosion
Direction slope 1 Direction slope 2
slope erosion 1?
Toe erosion 1?
slope erosion 2?
D1-2 = 1.00 m
- National Road # 1 damage by run-of rainfall far from Stung slot bridge about 700m
direct to Svay Rieng. Location of road damage 0535878 and 1242634
48 P UTM Zone.
1- Depth
= 1.20 m
2- Width
= 5.00 m
3- Length
= 0.50 m
W1-2=5 m Road surface erosionDirection slope 1 Direction slope 2
slope erosion 1?
Toe erosion 1?
slope erosion 2?
- Road erosion at Kampong Soeing far from bridge about 15 m.
- Location of road damage 0538777 and 1240494
48 P UTM Zone.
1- Depth
1-2
= 0.60 m
2- Width
1-2
= 1.00 m
3- Length
1-2
= 2.00 m
Road surface erosion
Direction slope 1 Direction slope 2
- Road erosion at Baphnom before this site used concrete pipe now not used the structure
used big rock and the location of road damage 0541123 and 1243577
48 P UTM Zone.
1- Depth
1-2
= 2.00 m
2- Width
1-2
= 8.00 m
3- Length
1-2
= 1.00 m
D-2=2 m Road surface erosionDirection slope 1 Direction slope 2
- Road erosion at baphnom district damage by big car. This road destroy by flood year
2002 and 2003. location of road damage 050029 and 1242486 48 P UTM Zone.
1- Depth
1-2
= 0.50 m
2- Width
1-2
= 20.00 m
3- Length
1-2
= 8.00 m
Road surface erosion
Direction slope 1 Direction slope 2
- Bank erosion by flow every year location of bank erosion old bridge and downstream of
new bridge .
1- Depth
1-2
= 3.00 m
2- Width
1-2
= 5.00 m
3- Length
1-2
= 150 m
Road surface erosion
Direction slope 1 Direction slope 2
B-2: Road Damage data at Site C1 in post flood survey
- Road damage by Run-off Rain fall at Babong Flood way. location of road damage 0537134
and 12594556 48 P UTM Zone.
1- Depth
= 0.50 m
2- Width
= 0.60 m
3- Length
= 25 m
Road surface erosion
Direction slope 1 Direction slope 2
- Road damage by Run-off Rain fall at Babong Flood way.
- Location of road damage 053715 and 12594572 48 P UTM Zone.
1- Depth
= 0.7 m
2- Width
= 0.2 m
3- Length
= 25 m
Road surface erosion
Direction slope 1 Direction slope 2
- Road damage by run-of rainfall& wave from lake at khsach sar . location of road damage
X 0541398 Y 1250526 and X 541058 Y 1250459
48 P UTM Zone.
1- Depth
= 2.00 m
2- Width
= 1.50 m
3- Length
= 340 m
Road surface erosion
Direction slope 1 Direction slope 2
C-1. Road Damage data at Site C2 during flood survey
ANLONG KOKY (C2-H7 )
Pilot Area
Monitoring location
X=500609
Y=1311429
Road surface erosion
Direction slope1:S
Direction slope2 :N
5m
Slope erosion1
Slope erosion2
D2=2m
Toe erosion2
Toe erosion1
W2=3m
PREK KOY ( C2-H7 )
Pilot Area
Monitoring location
X=500582
Y=1311037
Road surface erosion
Direction slope1:W
Direction slope2 :E
5.60m
Slope erosion1
Slope erosion2
PHUM REAYPAY (C2-H5 )
Pilot Area
Monitoring location
X=507706
Y=1318099
Road surface erosion
Direction slope1:S
Direction slope2 :N
4.00m
Slope erosion1
Slope erosion2
PHUM REAYPAY (C2-H5 )
Pilot Area
Monitoring location
X=507795
Y=1318038
Road surface erosion
Direction slope1:S
Direction slope2 :N
4.00m
Slope erosion1
Slope erosion2
D2=4.50m
Toe erosion2
Toe erosion1
W2=3m
PHUM PREKPANAK (C2-H5 )
Pilot Area
Monitoring location
X=506604
Y=1317130
Road surface erosion
Direction slope1:W
Direction slope2 :E
4.00m
Slope erosion1
Slope erosion2
C-2. Road Damage data at Site C2 in post flood survey
Phum Samrong, Khum Prey Koky, Srok Kang Measa, Kompong Cham Province
Pilot Area
Monitoring location
ANLONG KOKY (C2-H7)
X=499281
Y=1313431
Road surface erosion
Direction slope1:W
Direction slope2 :E
4m
Slope erosion1
Slope erosion2
D2=0.80m
Toe erosion2
Toe erosion1
W2=2.50m
Phum Samrong, Khum Prey Koky, Srok Kang Measa, Kompong Cham Province
Pilot Area
Monitoring location
ANLONG KOKY (C2-H7)
X=499218
Y=1313217
Road surface erosion
Direction slope1:W
Direction slope2 :E
4m
Slope erosion1
Slope erosion2
D2=0.75m
Toe erosion2
Toe erosion1
W2=1.50m
Phum Reay Pay 2, Khum Reay Pay Srok Kang Meas, Kompong Cham Province
Pilot Area
Monitoring location
REAYPAY ( C2 - H5 )
X=507631
Y=1318248
Road surface erosion
Direction slope1:S
Direction slope2 :N
4.00m
Slope erosion1
Slope erosion2
Phum Prek Panak, Khum Reay Pay, Srok Kang Meas, Kompong Cham Province
Pilot Area
Monitoring location
RAEYPAY ( C2-H5 )
X=506552
Y=1317060
Road surface erosion
Direction slope1:W
Direction slope2 :E
4.00m
Slope erosion1
Slope erosion2
5. Conclusion
The main work for installation is to transfer the Ha Tien elevation from National datum
benchmark to 15 locations. The average transferring distance from the benchmark to each pilot
site is 20 km. Adding in-site distance, the total transferring for, 1 site is 95 km. The installation
works has been done during 6 days working days
During the flow measurement of the sites C1 and C2 there are no flow at H7, H8,
C1-H9, C2-H4 and C2-H6.
There are 15 locations scattered in two pilot sites (9 in C 1 and 6 in C2). As required, there are
15 (Water level and Velocity) measurements in 10 hours of one day (1 hour interval). The break
time between two measurements of 50 minute The total survey -time for one campaign for C I is
12 days (10 days measurement and road damage survey) and C2 is 10 days (8 days measurement
road damage survey). In 1 day, in addition to 10 hours measurement, 3 more hours are required
for mobilization and demobilization. So 13 working hours is calculated for 1 location
measurement in 1 campaign. Two technical and 3 local staffs are standard team for this scale of
measurement.
Damage survey not seriously effect in case of the low flood in year 2007.
DISCHARGE MEASUREMENT
Ministry of Water Resource and Meteororogy
Vessel : . . . .Depatment of Hydrology and River Works
Date : 25/09/2007Hydrlogy Works Office
Operator : Mr. Horn SovannaWeather :
LOG SHEET Location 0535344 48P 1243037 UTM
Table 1 : ADP Discharge measurement at C1-H1
No Date Time Time Direction ADCP Conlig.File Data File Max Total Q H (m) Comments
Start Line End Line L.R/R.L Draft (m) wrc NYYMMDDhhmn W.D (m) (m³/sec)
Ministry of Water Resource and Meteororogy
Depatment of Hydrology and River Works
Vessel : . . . .Hydrlogy Works Office
Date : 26/09/2007Operator : . . Mr. Horn Sovanna . . . . LOG SHEET Weather : . . . .
Table 2 : ADP Discharge measurement at C1-H2
Location 0538815 48P 12400417 UTMNo Time Time Direction ADCP Conlig.File Data File Max Total Q H (m) Comments
Start Line End Line L.R/R.L Draft (m) wrc NYYMMDDhhmn W.D (m) (m³/sec)
Ministry of Water Resource and Meteororogy
Depatment of Hydrology and River Works
Vessel : . . . .Hydrlogy Works Office
Date : 27/09/2007 Operator : . Mr. Horn SovannaLOG SHEET Weather : . . . .
Table 3 : ADP Discharge measurement at C1-H3
Location 0531050 48P 1251354 UTM Time Time Direction ADCP Conlig.File Data File Max Total Q H (m) Comments Start Line End Line L.R/R.L Draft (m) wrc NYYMMDDhhmn W.D (m) (m³/sec)Ministry of Water Resource and Meteororogy
Depatment of Hydrology and River Works
Vessel : . . . .Hydrlogy Works Office
Date : 27/09/2007Operator : . Mr. Horn Sovanna
LOG SHEET Weather : . . . .
Table 4 : ADP Discharge measurement at C1-H4
Location 0532070 48P 1250680 UTM Time Time Direction ADCP Conlig.File Data File Max Total Q H (m) Comments Start Line End Line L.R/R.L Draft (m) wrc NYYMMDDhhmn W.D (m) (m³/sec)Ministry of Water Resource and Meteororogy
Depatment of Hydrology and River Works
Hydrlogy Works Office
Table 5 : Discharge measurement by Current Meter at C1-H5
Mean Velocity Guage Height Dicharge G.H Time
m/sec in m m3/sec Change hrs
1 30-09-2007
104.30
15.06
0.203
0.16
2.898
9
0.00
0.29
Current meter
2
-
104.30
15.18
0.209
0.16
2.967
9
0.00
0.27
-3
-
104.30
15.08
0.203
0.16
2.911
9
0.00
0.24
-4
-
104.30
14.40
0.206
0.15
2.783
9
0.00
0.26
-5
-
104.30
14.18
0.204
0.15
2.723
9
0.00
0.25
-6
-
104.30
14.36
0.211
0.15
2.826
9
0.00
0.27
-7
-
104.30
15.08
0.211
0.16
2.926
9
-0.01
0.25
-8
-
104.30
15.48
0.213
0.16
3.039
9
0.00
0.24
-9
-
104.30
15.50
0.209
0.16
3.015
9
0.00
0.28
-10
-
104.30
15.16
0.209
0.16
2.914
9
0.00
0.27
-Meas / secs Remarks
Ministry of Water Resource and Meteororogy
Depatment of Hydrology and River Works
Vessel : . . .Hydrlogy Works Office
Date : 03/10/2007Operator : . Mr. Horn Sovanna
LOG SHEET Weather : . . .
Table 6 : ADP Discharge measurement at C1-H6
Location 0532646 48P 1262418 UTMTime Time Direction ADCP Conlig.File Data File Max Total Q H (m) Comments
Start Line End Line L.R/R.L Draft (m) wrc NYYMMDDhhmn W.D (m) (m³/sec)
Ministry of Water Resource and Meteororogy
Depatment of Hydrology and River Works
Vessel : . . .Hydrlogy Works Office
Date : 02/10/2007Operator : . Mr. Horn Sovanna
LOG SHEET Weather : . . . .
Table 7 : ADP Discharge measurement at C1-H10
Location 0533819 48P 1244174 UTMTime Time Direction ADCP Conlig.File Data File Max Total Q H (m) Comments
Start Line End Line L.R/R.L Draft (m) wrc NYYMMDDhhmn W.D (m) (m³/sec)
Ministry of Water Resource and Meteororogy
Vessel : . . .Depatment of Hydrology and River Works
Date : 27/09/2007Hydrlogy Works Office
Operator : Mr. Khun ThoeunWeather : . . . .
LOG SHEET
Table 8 : ADP Discharge measurement at C2-H1
No Date Time Time Direction ADCP Data File Max Area Width Total Q H (m) Comments
Start Line End Line L.R/R.L Draft (m) NDDMMYYmmmr.sss depth, m m2 m (m³/sec)
Ministry of Water Resource and Meteororogy
Depatment of Hydrology and River Works
Vessel : . . . .Hydrlogy Works Office
Date : 26/09/2007 Operator : Mr. Khun ThoeunLOG SHEET Weather : . . . .
Table 9 : ADP Discharge measurement at C2-H2
No Time Time Direction ADCP Data File Max Area Width Total Q H (m) Comments
Start Line End Line L.R/R.L Draft (m) NDDMMYYmmmr.sss depth, m m2 m (m³/sec)
Ministry of Water Resource and Meteororogy
Depatment of Hydrology and River Works
Vessel : . . . .Hydrlogy Works Office
Date : 28/09/2007 Operator : Mr. Khun ThoeunLOG SHEET Weather : . . . .
Table 10 : ADCP Discharge measurement at C2-H3
Time Time Direction ADCP Data File Max Area Width Total Q H (m) Comments
Start Line End Line L.R/R.L Draft (m) NDDMMYYmmmr.sss depth, m m2 m (m³/sec)
Ministry of Water Resource and Meteororogy
Depatment of Hydrology and River Works
Hydrlogy Works Office
Table 11 : Discharge measurement by Current Meter at C2-H5
Mean Velocity
Guage Height
Dicharge
G.H
Time
m/sec
in m
m3/sec
Change
min
1 30-09-2007
2.50
2.88
0.163
3.04
0.163
0.00
20
Current meter
2
-
"
2.88
0.063
3.04
0.181
0.00
20
-3
-
"
2.88
0.064
3.04
0.184
0.00
15
-4
-
"
2.88
0.058
3.04
0.168
0.00
20
-5
-
"
2.88
0.063
3.04
0.183
0.00
15
-6
-
"
2.88
0.059
3.04
0.17
0.00
20
-7
-
"
2.88
0.064
3.04
0.185
-0.01
20
-8
-
"
2.88
0.064
3.04
0.183
0.00
15
-9
-
"
2.88
0.059
3.04
0.169
0.00
15
-10
-
"
2.88
0.065
3.04
1.186
0.00
15
-Note:
C2-H5 : Reay Pay
Remarks
No
Date
Width in m
Area m²
Ministry of Water Resource and Meteororogy
Depatment of Hydrology and River Works
Vessel : . . . .Hydrlogy Works Office
Date : 29/09/2007 Operator : Khun ThoeunLOG SHEET
Table 12 : ADCP Discharge measurement at C2-H6
Weather : . . . .Time Time Direction ADCP Data File Max Area Width Total Q H (m) Comments
Start Line End Line L.R/R.L Draft (m) NDDMMYYmmmr.sss depth, m m2 m (m³/sec)
1 29/09/2007 9:44 9:45 L-R 0.25 P1_290907000r.000 7.66 182.03 34.42 0.93 8.18 L 4 m - R 4 m - 9:46 9:47 R-L - P1_290907001r.000 7.68 177.53 35.46 -0.4 - R 4 m - L 4 m
2 29/09/2007 NO FLOW
Ministry of Water Resource and Meteororogy
Depatment of Hydrology and River Works
Hydrlogy Works Office
Table 13 : Discharge measurement by Current Meter at C2-H7
Mean Velocity
Guage Height
Dicharge
Gauge Height
Time
m/sec
in m
m3/sec
Change
min
1 24/09/2007
43.80
177.68
0.182
7.54
32.372
0.00
25
By Current meter
2
-
"
177.68
0.184
7.54
32.609
0.00
20
Inflow to Boeung Takrong
3
-
"
177.68
0.178
7.54
31.659
0.00
20
-4
-
"
177.68
0.177
7.54
31.425
0.00
20
-5
-
"
177.68
0.179
7.54
31.802
0.00
15
-6
-
"
177.68
0.175
7.54
31.019
0.00
20
-7
-
"
177.68
0.177
7.54
31.435
0.00
15
-8
-
"
177.68
0.177
7.54
31.422
0.00
20
-9
-
"
177.68
0.178
7.54
31.637
0.00
20
-10
-
"
175.51
0.172
7.52
30.249
0.00
20
-Note:
C2-H7 : Anlong Koki Bridge
Ministry of Water Resource and Meteororogy
Depatment of Hydrology and River Works
Vessel : . . . .Hydrlogy Works Office
Date : 25/09/2007Operator : Mr. Khun Thoeun
LOG SHEET Weather : . . . .
Table 14 : ADCP Discharge measurement at C2-H8
Time Time Direction ADCP Data File Max Area Width Total Q H (m) Comments
Start Line End Line L.R/R.L Draft (m) NDDMMYYmmmr.sss depth, m m2 m (m³/sec)
DISCHARGE MEASUREMENT
Ministry of Water Resource and Meteororogy
Vessel : . . . .Depatment of Hydrology and River Works
Date : 24/10/2007Hydrlogy Works Office
Operator : . . Mr. Horn Sovanna . . . . Weather : . . . .LOG SHEET Location 0535344 48P 1243037 UTM
Table 15 : ADP Discharge measurement at C1-H1
Time Time Direction ADCP Conlig.File Data File Max Total Q H (m) Comments
Start Line End Line L.R/R.L Draft (m) wrc NDDMMYYmmmr.sss W.D (m) (m³/sec)
Ministry of Water Resource and Meteororogy
Depatment of Hydrology and River Works
Vessel : . . . .Hydrlogy Works Office
Date : 25/10/2007Operator : . . Mr. Horn Sovanna . . . . LOG SHEET Weather : . . . .
Table 16 : ADP Discharge measurement at C1-H2
Location 0538815 48P 12400417 UTMNo Time Time Direction ADCP Conlig.File Data File Max Total Q H (m) Comments
Start Line End Line L.R/R.L Draft (m) wrc NDDMMYYmmmr.sss W.D (m) (m³/sec)
Ministry of Water Resource and Meteororogy
Depatment of Hydrology and River Works
Vessel : . . . .Hydrlogy Works Office
Date : 26/10/2007Operator : . Mr. Horn Sovanna
LOG SHEET Weather : . . . .
Table 17 : ADCP Discharge measurement at C1-H3
Location 0531050 48P 1251354 UTMTime Time Direction ADCP Conlig.File Data File Max Total Q H (m) Comments
Start Line End Line L.R/R.L Draft (m) wrc NDDMMYYmmmr.sss W.D (m) (m³/sec)
Ministry of Water Resource and Meteororogy
Depatment of Hydrology and River Works
Vessel : . . . .Hydrlogy Works Office
Date : 26/10/2007Operator : . . Mr. Horn Sovanna . . . . LOG SHEET Weather : . . . .
Table 18 : ADCP Discharge measurement at C1-H4
Location 0532070 48P 1250680 UTMTime Time Direction ADCP Conlig.File Data File Max Total Q H (m) Comments
Start Line End Line L.R/R.L Draft (m) wrc NDDMMYYmmmr.sss W.D (m) (m³/sec)
Ministry of Water Resource and Meteororogy
Depatment of Hydrology and River Works
Hydrlogy Works Office
Table 19 : Discharge measurement by Current Meter at C1-H5
Mean Velocity Guage Height Dicharge G.H Time
m/sec in m m3/sec Change hrs
1 27-10-2007
104.30
47.21
1.018
0.51
47.62
9
0.00
0.27
Current meter
2
-
104.30
47.21
1.019
0.51
47.49
9
0.00
0.18
-3
-
104.30
47.21
1.013
0.51
47.21
9
0.00
0.15
-4
-
104.30
46.29
1.004
0.50
46.15
9
0.00
0.22
-5
-
104.30
46.29
1.012
0.50
46.29
9
0.00
0.21
-6
-
104.30
46.29
1.009
0.50
46.24
9
0.00
0.20
-7
-
104.30
45.47
1.003
0.49
45.14
9
0.00
0.21
-8
-
104.30
45.47
0.997
0.49
44.88
9
0.00
0.23
-9
-
104.30
45.47
0.993
0.49
44.67
9
0.00
0.20
-10
-
104.30
45.47
0.991
0.49
44.62
9
0.00
0.20
-Meas / secs Remarks
Ministry of Water Resource and Meteororogy
Vessel : . . . .Depatment of Hydrology and River Works
Date : 30/10/2007Hydrlogy Works Office
Operator : . . Mr. Horn Sovanna . . . .Weather : . . . .
LOG SHEET
Table 20 : ADCP Discharge measurement at C1-H6
Location 0532646 48P 1262418 UTMTime Time Direction ADCP Conlig.File Data File Max Total Q H (m) Comments
Start Line End Line L.R/R.L Draft (m) wrc NDDMMYYmmmr.sss W.D (m) (m³/sec)
Ministry of Water Resource and Meteororogy
Depatment of Hydrology and River Works
Vessel : . . . .Hydrlogy Works Office
Date : 31/10/2007Operator : . . Mr. Horn Sovanna . . . . LOG SHEET Weather : . . . .
Table 21 : ADCP Discharge measurement at C1-H10
Location 0533819 48P 1244174 UTMTime Time Direction ADCP Conlig.File Data File Max Total Q H (m) Comments
Start Line End Line L.R/R.L Draft (m) wrc NDDMMYYmmmr.sss W.D (m) (m³/sec)
Ministry of Water Resource and Meteororogy
Depatment of Hydrology and River Works
Vessel : . . . .Hydrlogy Works Office
Date : 28/10/2007Operator : Mr. Khun Thoeun
LOG SHEET Weather : . . . .
Table 22 : ADP Discharge measurement at C2-H1
No Time Time Direction ADCP Data File Max Area Width Total Q H (m) Comments
Start Line End Line L.R/R.L Draft (m) NDDMMYYmmmr.sss depth, m m2 m (m³/sec)
Ministry of Water Resource and Meteororogy
Depatment of Hydrology and River Works
Vessel : . . . .Hydrlogy Works Office
Date : 27/10/2007 Operator : Mr. Khun ThoeunLOG SHEET Weather : . . . .
Table 23 : ADP Discharge measurement at C2-H2
No Time Time Direction ADCP Data File Max Area Width Total Q H (m) Comments
Start Line End Line L.R/R.L Draft (m) NDDMMYYmmmr.sss depth, m m2 m (m³/sec)
Ministry of Water Resource and Meteororogy
Depatment of Hydrology and River Works
Vessel : . . . .Hydrlogy Works Office
Date : 29/10/2007 Operator : Mr. Khun ThoeunLOG SHEET Weather : . . . .
Table 24 : ADCP Discharge measurement at C2-H3
Location 0531050 48P 1251354 UTMTime Time Direction ADCP Data File Max Area Width Total Q H (m) Comments
Start Line End Line L.R/R.L Draft (m) NDDMMYYmmmr.sss depth, m m2 m (m³/sec)
Ministry of Water Resource and Meteororogy
Depatment of Hydrology and River Works
Hydrlogy Works Office
Table 25 : Discharge measurement by Current Meter at C2-H5
Mean Velocity Guage Height Dicharge G.H Time
m/sec in m m3/sec Change min
1 31/10/2007
2.50 2.82 0.20 2.94 0.5630.00
15
Current meter
2
-
" 2.82 0.20 2.94 0.550.00
15
Water gate
3
-
" 2.82 0.20 " 0.5630.00
10
-4
-
" 2.82 0.20 " 0.560.00
10
-5
-
" 2.82 0.20 " 0.5550.00
15
-6
-
" 2.82 0.20 " 0.5660.00
13
-7
-
" 2.82 0.20 " 0.5550.00
10
-8
-
" 2.78 0.19 2.93 0.5160.00
15
-9
-
" 2.78 0.18 2.92 0.4930.00
15
-10
-
" 2.70 0.17 2.9 0.4580.00
15
-Note:
C2-H5 : Reay Pay
Meas / secs Remarks
Ministry of Water Resource and Meteororogy
Depatment of Hydrology and River Works
Vessel : . . . .Hydrlogy Works Office
Date : 30/10/2007Operator : . . . . LOG SHEET
Table 26 : ADCP Discharge measurement at C2-H6
Weather : . . . .Location 0532646 48P 1262418 UTM
Time Time Direction ADCP Data File Max Area Width Total Q H (m) Comments
Start Line End Line L.R/R.L Draft (m) NDDMMYYmmmr.sss depth, m m2 m (m³/sec)
1 30/10/2007 9:26 9:28 R-L 0.25 P1_301007000r.000 7.60 189.49 35.27 -4.78 8.23 L 4 m - R 4 m - 9:28 9:29 L-R - P1_301007001r.000 7.61 184.96 35.03 -0.11 - R 4 m - L 4 m
2 30/10/2007 no flow
-
-Note: C2-H6 : Anlong Chrey No Date
Ministry of Water Resource and Meteororogy
Depatment of Hydrology and River Works
Hydrlogy Works Office
Table 27 : Discharge measurement by Current Meter at C2-H7
Mean Velocity
Guage Height
Dicharge
G.H
Time
m/sec
in m
m3/sec
Change
min
1 25/10/2007
43.80
180.52
0.241
7.64
43.468
0.00
20
By Current Meter
2
-
"
"
0.243
"
43.930
0.00
20
Inflow to Beong Takrong
3
-
"
"
0.277
"
50.042
-0.01
20
-4
-
"
180.00
0.287
7.62
51.592
0.00
25
-5
-
"
"
0.275
"
49.424
0.00
20
-Meas / secs
Remarks
Ministry of Water Resource and Meteororogy
Vessel : . . . .Depatment of Hydrology and River Works
Date : 26/10/2007Hydrlogy Works Office
Operator : Mr. Khun ThoeunWeather : . . . . LOG SHEET
Table 28 : ADP Discharge measurement at C2-H8
No Date Time Time Direction ADCP Data File Max Area Width Total Q H (m) Comments
Start Line End Line L.R/R.L Draft (m) NDDMMYYmmmr.sss depth, m m2 m (m³/sec)