• Nie Znaleziono Wyników

Het hijsen van een last van eem supplyboat. Een simulatie in TUTSIM en Lotus 123 (summary)

N/A
N/A
Protected

Academic year: 2021

Share "Het hijsen van een last van eem supplyboat. Een simulatie in TUTSIM en Lotus 123 (summary)"

Copied!
1
0
0

Pełen tekst

(1)

Delft University of Technology

Faculty Mechanical, Maritime and Materials Engineering Transport Technology

W. Bloem Het hijsen van een last van eem supplyboat. Een simulatie in TUTSIM en Lotus 123. Computer program, Report 87.3.OS.2295, Transport Engineering / Offshore Engineering.

In this report a description is presented of the simulation study that has been executed to study the process of hoisting a load from a moving supply-boat. The hoisting is supposed to be executed by a crane that is mounted on a fixed offshore structure.

The project has been divided into two parts, with respect to the wave motion and the motion of the supply-boat.

In the first part, the TUTSIM simulation program is used to establish the dynamic effects of the hoisting process. At this stage, the motion of the supply-boat is considered to follow a regular (sinusoidal) wave.

In the second part, the effects of an approximation of an irregular wave motion have been analysed. This analysis has been done with the program Lotus 123 and has been focusses mainly on the reliability of hoisting a load with different hoisting speeds.

Finally, the results for both the regular and irregular wave motion are compared to the recommendations of Lloyd's Register of Shipping, considering hoisting offshore loads.

Reports on Transport Engineering and Logistics (in Dutch)

Cytaty

Powiązane dokumenty

Therefore a proposition is presented to set up a study and perform measurements of movements (and the loads related to them) of a pontoon wich is moored in a port.. The proposed

Analysis of the load distribution on idler rolls using EDEM® and ANSYS® is presented as follows. Possibilities and drawbacks will also

This report desribes an exploratory study concerning a new container terminal concept to handle large container vessels with a capacity of 8000 containers within 24 hours.. This

The second objective is the design of a planningtool for the support of the cargoselection and routeplanning of a roll-on roll-off inlandvessel..

This report is the result of a feasibilty study of a high capacity infeed for feeding parcels to fixed window sorters.. The requirements have been set up, which have to be met by

De experimenten voor het bepalen van de bottlenecks van het productieproces, welke op basis van de afname van eindproducten zijn uitgevoerd, zullen daarom in april 2006 herhaald