• Nie Znaleziono Wyników

Proceedings of the International Conference WARSHIP’05: Naval Submarines 8, 22-23 June 2005, The Royal Institution of Naval Architects, RINA, London, UK, ISBN: 1-905040-14-8 (summary)

N/A
N/A
Protected

Academic year: 2021

Share "Proceedings of the International Conference WARSHIP’05: Naval Submarines 8, 22-23 June 2005, The Royal Institution of Naval Architects, RINA, London, UK, ISBN: 1-905040-14-8 (summary)"

Copied!
4
0
0

Pełen tekst

(1)

Delft University of Technology

Ship Hydromechanics Laboratory

Library

Mekelweg 2, 2628 CD Delft The Netherlands Phone: +31 15 2786873 - Fax: +31 15 2781836

P2005-5

INTERNATIONAL CONFERENCE

WARSHIP 2005:

NAVAL SUBMARINES 8

22 - 23 June 2005, London, U K

PAPERS

THE ROYAL I N S T I T U T I O N OF NAVAL ARCHITECTS

10 UPPER BEIXÏRAVE STREET, LONDON SWIX 8BQ Telephone: +44 (0)20 7235 4622

(2)

RINA

WARSHIP 2005:

NAVAL SUBMARINES 8

22 - 23 June 2005

© 2005: The Roj'al histitution of Naval Architects

The histitution is not, as a body, responsible for the opinions expressed by the mdividual authors or speakers

T H E R O Y A L INSTITUTION OF NAVAL ARCHITECTS

10 Upper Belgrave Street London SW1X8BQ

Telephone: 020 7235 4622 Fav: 020 7259 5912

(3)

Warship 2005: Naval Submarines 8, London, UK

CONTENTS

Marine Systems Development - A New Opportunity 1

Mark Tooth, Matt Bolton, and Graham Ford, Ministry of Defence, UK

Evolution from Periscopes to Optronic Mast Systems 9

Alan Stevenson, Thales Optronics Ltd, UK

Z E B R A Battery - The Solution to Submarine Energy Storage 15

Dave Williamson, Rolls-Royce pic, UK Neil Benstead, Ministry of Defence, UK

The United States Navy's Submarine Safety (SUBSAFE) Program 25

Stephen E Iwanowicz and Matthew S McBride, Naval Sea Systems Command, USA

Christopher A Lilly, Perot Systems Government Sennces, USA

Advances in Submarine Escape 37

Joseph TArcano, Michael Holmes, Russell Hrabe, John Leadmon, and Brandan Shea, Naval Sea Systems Command, USA

Risks and Hazards in Recovering the Nuclear Submarine Kursk 47

John Large, Large & Associates, Consulting Engineers, UK

NATO Submarine Rescue System - An Integrated Approach *

Neville Yard, Rolls-Royce pic, UK

Shock Qualification of Electron Beam Welded Submarine Hull Valves using 57 Numerical Methods

Phillip Thompson, Nicolas Misselbrook and Alan Fergusoit, Weidlinger Associates Ltd, UK

Greg Alexander, Sea Technology Group, MOD, UK

Collapse Pressure of Watertight Bulkheads 69

Jack Reijmers, Iv-Nevesbu, The Netherlands

The Development of an Onboard Submarine Stability Tool 75

Darren Haynes, Sea Technology Group, MoD, UK Ian Carter, Graphics Research Corporation Ltd, UK

Astute Class Submarine Movement Control - An Integrated Approach 87

Simon Purvis and Neil Philip, BAE SYSTEMS Submarines Ltd, UK

Industrial Challenges Within Royal Naval Submarine in Service Support 101

Mike Whalley, DML Group, UK

M A R P O L Compliant Solid Waste Management on Astute Class 111

Kevin Young, BAE Systems Submarines. UK

Classification of Submarines 215

Lorenz Petersen, Gennanischer Lloyd, Germany

(4)

Warship 2005: Naval Siihiiiariiies 8. London, UK

Astute Propulsor Technical Innovation Summary 119

Peter Vinton and Simon Banks, Rolls-Royce pic, UK Martin West, Frazer-Nash Consultancy, UK

Submarine Towing Trials 129

James Anderson and Sarah Watts, QinetiQ Haslar, UK

Nigel Hills and Emmanuel Ofosu-Apeasah, MoD S&MO IPT, UK

Submarine Trials and Experimentation - Dealing with Real-Life Data 139

Jon Bayliss, Nick Kitnber and Philip Marchant, QinetiQ Sea, UK Jason Bryars, Ministry of Defence, UK

An Evaluation of the Merits of Non-Body of Revolution Submarine 149 HuUforms

David Nogy, Naval Sea Systems Command, USA Jeffrey Pfister, Northrop Grumman Corporation, USA

Pressure System Life Prediction and Management 161

Hamish Fowler, Julian Austin, Mike Anderson and Alasdair Wylie, Frazer-Nash Consultancy Limited, UK

Development of a Portable Atmosphere Control Unit for Military 165 Applications by Integration of Submarine and Diving technology.

Mike Clarke and Amanda J Crudace, Molecular Products Ltd, UK

Authors' Contact Details

169 * Paper Unavailable at Time of Publishing

Cytaty

Powiązane dokumenty

Normal procedure in the Netherlands is that the wind speed at design conditions is taken, the corresponding wave height is computed with formula (2) en subsequently the

It is concluded that in the sewer condition assessment process using visual sewer inspection data two steps can be distinguished: first the initial assessment (defect recognition

Wielkość tego daru, jakim jest Eucharystia jako pokarm, który nie ginie i który jest na życie wieczne, ukazuje się w dobitny i wyraźny sposób ostatecznie na tle tego,

Do chwili obecnej (10 lutego 1995 r.) przyjęła 10 artykułów projektu, a do przedyskutowania i zaakceptowania ma jeszcze co najmniej siedem, w tym tak istotne jak dotyczące

pobytu by³ d³u¿szy ni¿ 3 miesi¹ce, to za konieczne uznano zalegalizowanie pobytu, a w przypadku cz³onka rodziny niebêd¹cego obywatelem Unii Europejskiej, Norwe- gii,

˙Zuk studied the evolution of Γ(n, d) with fixed d and n going to infinity, and showed that certain properties such as the property of being a free group or having Kazhdan’s

Torsten Moltrecht, Naval Architect, SNAME,Project Department, Voith Schiffstechnik GmbH