• Nie Znaleziono Wyników

Deployment UML diagram

N/A
N/A
Protected

Academic year: 2021

Share "Deployment UML diagram"

Copied!
1
0
0

Pełen tekst

(1)

Białystok Technical University Faculty of Computer Science Software Engineering

Deployment UML diagram

Exercise

In the system of settlement of water used by water supply company "Healthy Water" infrastructure is as follows. Workstations (in the number 15) are connected to the server (Xeon 3400, 8GB RAM) through a local area network (Ethernet), while the readings of counters are transferred from portable computers (50 units) using GSM modems. On the server the following components are resided:

BillingDB providing interfaces IReading and IPayment and module (library) ConsumptionSettlement using IPayment. On 5 workstations an application Settlements using both interfaces of BillingDB is installed, on the remaining workstations CostsSettlement using interface IPayment is installed. Installed on portable computers the program Readings uses interface IReading. Provide a deployment diagram implementing the above scheme.

Proposition of solution

Compiled by: Tomasz Łukaszuk

Cytaty

Powiązane dokumenty

Notice at this point that, by performing equivariant surgery, we can, without changing the signature, always get rid of two-dimensional compo- nents of the fixed point set,

Suppose we are interested in the best (under the above partial ordering) estimator in a class G of estimators under a fixed loss function L.. It appears that if G is too large, then

Assume that {X k } +∞ −∞ is a sequence of identically distributed random variables with finite second moment.. Since weak convergence in IR ∞ is equivalent to convergence

Stack-losses of ammonia Y were measured in course of 21 days of operation of a plant for the oxidation of ammonia (NH3) to nitric acid (HNO 3 )... Discuss the obtained

Przy wkroczeniu Niemców i ucieczce wojsk radzieckich zginęło w Archidiecezji około 30 kapłanów zamordowanych już to przez Niemców, już to przez cofające się oddziały

Further, the report of phase 1 analysed the current cadastral procedures, land model and database in Israel, made an initial comparison between the Israeli model and the ISO

One of the best architects of the 20th century modernism, Le Corbusier believed that architecture built on the basis of Fibonacci sequence would be prefect and aestheticaly

• trigger (a) is a triggering event; it may be an event of any kind, in particular, it may be a timed event (time-out), and if it is empty, it means that the transition