• Nie Znaleziono Wyników

Status and Development Plan of the PowerPlane of Ampyx Power

N/A
N/A
Protected

Academic year: 2021

Share "Status and Development Plan of the PowerPlane of Ampyx Power"

Copied!
4
0
0

Pełen tekst

(1)

Launch of the Ampyx PowerPlane AP-1B1 (29 September 2012). 18

(2)

Ampyx PowerPlane AP-2A1 during flight (photo taken by its tail camera on 12 May 2015). 19

(3)

PowerPlanes AP-2A1 and AP-2A2 in the workshop of Ampyx Power (9 April 2014). 20

(4)

Michiel Kruijff

Head of Product Development Ampyx Power B.V. Lulofsstraat 55 – unit 13 2521 AL The Hague The Netherlands michiel@ampyxpower.com www.ampyxpower.com

Status and Development Plan of the PowerPlane of Ampyx Power

Michiel Kruijff, Richard Ruiterkamp

Ampyx Power B.V.

Ampyx Power develops the PowerPlane R, a novel wind

energy technology that will eventually allow sustainable production of power at lower costs than fossil-fueled al-ternatives. It thus has the potential to trigger a paradigm shift in the electricity sector and can accelerate the transi-tion to a renewable energy supply. The technology gener-ates energy by flying a tethered glider-plane attached to a ground-based generator following a cross-wind pattern as the tether unwinds under high tension (plane spirals away from the generator), and rewinds under near-zero tension (plane glides back to generator). Ampyx Power currently operates 2 prototype PowerPlanes (incl. AP-2A1 and AP-2A2, about 20 kW net power production demon-strated) in a test-field in The Netherlands, for which it has obtained type registration and an exemption (license to operate) from the national authorities based on a thor-ough safety analysis, implementation of a safety system, pilot training and operations manual. The 5.5 m proto-types serve to demonstrate the principle of a fully auto-matic operation (power generation, → land → launch → power generation), as well as to raise technology readi-ness level for the certifiable commercial system proto-type AP-3 (200 kW) and the to-be certified commercial version AP-4 (2 MW) concept. These systems shall be operational in the coming few years. The AP-3 is the pre-commercial system that is to demonstrate full auton-omy, performance and cost predictability, reliability and safety. It also serves as learning platform to meet the

challenges of site development, grid connection, main-tainability and 24/7 operations. AP-3 is currently un-der development following stringent aeronautical design processes, airworthiness and safety standards, which we consider a necessity not only from perspective of certifi-cation, but also for commercial viability. The AP-4 shall operate at a Levelised Cost of Energy (LCoE) well below that of conventional wind energy, as predicted by extrap-olation of flight data based on validated dynamic simu-lation over a range of wind speeds for typical sites, cou-pled to a structural mass model and cost model including capital and operational aspects. Performance efficiency and nominal operation at very high gee load is yet to be demonstrated. This is the topic of current work. Uptime and reliability can be analysed and improved by strict de-sign rigour but have eventually to be demonstrated in the field and will undoubtedly need to improve over time as flight hours and operational experience accumulates. System sizing is done based on end-to-end modelling of design, performance and LCoE. This approach leads not necessarily to a system of optimal power production, but one of lowest energy price. It guides us with trade-offs such as tether diameter selection (air drag losses vs. wear and maintenance cost), tether length (land lease cost vs. cycle efficiency), wing area (total power vs. relative ma-terial cost). The presentation will address the current sta-tus of Ampyx Power technology, the roadmap forward to a commercial implementation and its rationale.

Cytaty

Powiązane dokumenty

[r]

Na to miast przed mio tem le asin gu mo że być każ da rzecz lub pra wo ma jąt ko we, nie ma tu praw nych ogra ni czeń... 85% wszyst kich umów le asin

ostatniego czasopisma, które ukazywało się w latach 1945–1951, nie zachowały się żadne materiały archiwalne, brak też jakichkolwiek opracowań na jego temat, jedy- nie wspominano

Third insight: The apocalyptic vision combines, in careful theological work, the Bible, today’s experience, and Christ, thereby providing the readers with a hopeful knowledge of

?2 Por. Marschall, Kardmgo und Rom, dz. Hofmann, Der Mrc/tenbegn/f, dz.. BISKUP! AFRYKAŃSCY WOBEC HEREZJI PELAGIANIZMU 455 i Ceiestiusza, nie zlękli się tej postawy

wieża Babel (182), salomonowy wyrok (143), Sodoma i Gomora (112), plaga egipska (101), trąba jerychońska (57), łódź Piotrowa (33), judaszowy pocału- nek (30), tłuc się jak Marek

) In the case of long-term investments, a high discount rate results in low values of cash flows generated in the middle and final years of the project... The DCF analysis is based

Jest to zbiór dokumentów (ogółem 388) wytworzo­ nych przez terenowe organy administracyjne (władze prowincji, regencji i powiatów w Niemczech, województw i powiatów w