FUNCTION IN FIRE EXPERT JUDGEMENT REPORT WITH CLASSIFICATION FIRES-JR-068-13-NURE

N/A
N/A
Protected

Academic year: 2021

Share "FUNCTION IN FIRE EXPERT JUDGEMENT REPORT WITH CLASSIFICATION FIRES-JR-068-13-NURE"

Copied!
11
0
0

Pełen tekst

(1)

FUNCTION IN FIRE EXPERT JUDGEMENT REPORT WITH CLASSIFICATION FIRES-JR-068-13-NURE

Cable bearing system and fireboxes BAKS with cables business TECHNOKABEL S.A.

This is an electronic version of a classification report which was made as a copy of classification report officially issued in a paper form. The electronic version of a classification report shall be used only for informative purpose. Any information listed in this classification report is the property of the sponsor and shall not be used or published without written permission. Contents of this file may only be modified by the editor i.e.

FIRES, s.r.o., Batizovce. Sponsor is allowed to publish this classification report in parts only with written permission of the editor.

(2)

FUNCTION IN FIRE EXPERT JUDGEMENT REPORT WITH CLASSIFICATION IN ACCORDANCE WITH DIN 4102-12: 1998-11

FIRES-JR-068-13-NURE

FIRES 149/S-27/10/2009-E FIRES, s.r.o., Osloboditeľov 282, 059 35 Batizovce, Slovak Republic tel. 00421 52 775 22 98, fax. 00421 52 788 14 12, www.fires.sk Notified Body No. 1396, Approved Body No. SK01, Member of EGOLF

Name of the product: Cable bearing system and fireboxes BAKS with cables business TECHNOKABEL S.A.

Sponsor: BAKS Kazimierz Sielski, ul. Jagodne 5, 05 - 480 Karczew, Poland - producer of cable bearing system

TECHNOKABEL S.A., Nasielska 55, 04 - 343 Warszawa, Poland – producer of cables

Prepared by: FIRES, s.r.o.

Approved Body No. SK01 Osloboditeľov 282

059 35 Batizovce Slovak Republic

Task No.: PR-13-0229 Date of issue: 07. 06. 2013

Reports: 5

Copy No.: 2

Distribution list:

Copy No. 1 FIRES, s. r. o., Osloboditeľov 282, 059 35 Batizovce, Slovak Republic (electronic version)

Copy No. 2 BAKS Kazimierz Sielski, ul. Jagodne 5, 05 - 480 Karczew, Poland (electronic version)

Copy No. 3 TECHNOKABEL S.A., Nasielska 55, 04 - 343 Warszawa, Poland (electronic version)

Copy No. 4 BAKS Kazimierz Sielski, ul. Jagodne 5, 05-480 Karczew, Poland Copy No. 5 TECHNOKABEL S.A., Nasielska 55, 04 - 343 Warszawa, Poland

This expert judgement report consists of 10 pages and may only be used or reproduced in its entirety.

(3)

1. INTRODUCTION

This expert judgement report with classification defines the function in fire classification assigned to element „Cable bearing system and fireboxes BAKS with cables business TECHNOKABEL S.A.” in accordance with the classes given in DIN 4102-12: 1998-11.

This test was carried out according to standard STN 92 0205: 2012 and meets requirements of DIN 4102-12: 1998-11. Basic deviation in process and carrying out of test between these standards is in measuring and in control of temperature in the test furnace. According to STN 92 0205: 2012, plate thermometers according to EN 1363-1 are used. According to DIN 4102-12: 1998-11, common thermocouples of construction which was used for this measurement till issue of EN 1363-1 are used.

Measurement by plate thermometers acc. to EN 1363-1 can be considered as stricter method of temperature control in test furnace in compare with thermocouples used till issue of EN 1363-1. Therefore, it is possible to use results of test according to STN 92 025: 2012 for classification of tested cables according to DIN 4102-12: 1998-11, but not conversely.

This expert judgement report defines field of application which is outside the field of direct application according test standard or outside the field of extended application according to relevant extended application standard. This expert judgement expresses the opinion of the FIRES and is based on the experience or internal rules of FIRES.

2. DETAILS OF CLASSIFIED PRODUCT 2.1 GENERAL

The product, Cable bearing system and fireboxes BAKS with cables business TECHNOKABEL S.A., is defined as a cable bearing system for power and communication halogen free cables with circuit integrity maintenance.

2.2 PRODUCT DESCRIPTION

Product comprise of cable bearing system BAKS – cable trays, cable mesh trays, cable clips UDF and fireboxes PMO 1 and PMO2 with accessories and power and communication halogen free cables of TECHNOKABEL S.A. company.

Cable trays

Cable trays type KGJ/KGOJ … H60 are made from steel sheet thickness 0,9 mm.

Cable trays type KGL/KGOL … H60 are made from steel sheet thickness 0,7 mm.

Cable trays type KBJ … H60 are made from steel sheet thickness 0,9 mm.

Trays are jointed together by screws type SGN M6x12.

Trays are used as bearing system for the cables.

Cable mesh trays

Cable mesh trays type KDS/KDSO … H60 are made from steel wire ∅ 4,5 mm.

Cable mesh trays type KGS … H60 are made from steel wire ∅ 4,0 mm.

Mesh trays are jointed together by junctions type USS/USSO.

Mesh trays are used as bearing system for the cables.

Cable ladders

Cable ladders type DUP/DUOP…H60/B400 are made from steel sheet thickness 1,5 mm and spacing of transoms is 300 mm. Cable ladders are jointed together by two junctions (LDCH60N) on both sides an screws (SGN M8x14).

Cable ladders type DSH400H80/B-400 are made from steel profiles I80 and spacing of transoms is 500 mm. Ladders are fixed together by two steel sheets (PLH) with screws (M12x30) and fixed to ceiling by clamps (NKH).

Cable ladders are used as bearing system for the cables.

(4)

FIRES-JR-068-13-NURE

FIRES 149/S-27/10/2009-E Page: 3/10

Wall channels

Wall channels type KS…H68/2 are made from steel sheet thickness 1,0 mm. Channels are jointed together by junctions (LKSH68) and (SU). Wall channel is covered by steel sheet (PKS).

Wall channels are used as bearing system for the cables.

Consoles

Consoles type WWCT… are made of steel sheet thickness 3,0 mm.

Consoles type WPC/WPCO are made from steel sheet thickness 2 mm and 6 mm.

Consoles are used to gripping brackets.

Brackets

Brackets type WPCW/WWPCO are made from steel sheet thickness 2,0 mm.

Brackets type WMC/WMCO are made from steel sheet thickness 2,5 mm and 5 mm.

Brackets are used to gripping trays or ladders to ceiling or to wall.

Supports

Supports type CWP/CWOP are made from steel sheet thickness 1,5 mm.

Supports are used to gripping trays or ladders to the ceiling with threaded bar.

Holders

Holders type UPWK/UPWKO are made from steel sheet thickness … mm. Holders are used to gripping threaded rod to brackets WW. Holders are used to gripping threaded rod to the ceiling or wall.

Cable clips

Clips UDF are made from steel sheet thickness from 1,2 to 2,0 mm.

Clips are used to gripping cables to ceiling or to wall.

Fireboxes

Fireboxes PMO1 and PMO2 are made of steel sheets with thickness 1,0 mm and bottom part 1,25 mm.

Fireboxes can be used for cross connection of cable – number of cables and conductors according to type. It can be used inside the buildings on the ceiling or wall.

Cables Power cables:

(N)HXH-J FE180 PH30/E30 4x1,5 RE (4x) (N)HXH-J FE180 PH30/E30 4x50 RM (4x) (N)HXH-J FE180 PH90/E90 4x1,5 RE (21x) (N)HXH-J FE180 PH90/E90 5x4 RE (1x) (N)HXH-J FE180 PH90/E90 4x50 RM (20x) NHXH-J FE180 PH90/E90 4x1,5 RE (13x) NHXH-J FE180 PH90/E90 4x1,5 RE (1) (2x) NHXH-J FE180 PH90/E90 5x10 RM (1x) NHXH-J FE180 PH90/E90 4x16 RM (2x) NHXH-J FE180 PH90/E90 4x50 RM (14x) NHXH-J FE180 PH90/E90 4x50 RM (1) (13x) NHXHRHX-J FE180 PH90/E90 4x1,5 RE (4x) NHXHRHX-J FE180 PH90/E90 4x50 RM (4x) Communication cables:

HTKSH PH90 1x2x0,8 mm (20x)

HTKSHekw PH90 1x2x0,8 mm (6x)

HDGs fe180 PH90/E30-E90 2x1 mm2 (20x) HDGs fe180 PH90/E30-E90 3x1 mm2 (2x) Optical fiber cable:

24 SM FOC 9/125 LT SWA LSZH FR (1x)

The length of cables was 5,5 m and 4,0 m from that was exposed to fire.

The length of optic fiber cable was 29 m and 8,0 m from that was exposed to fire.

Power and communication halogen free cables were fixed in the trays, ladders and mesh trays by steel clips in the points of allowed bending radius.

Cables at trays were fixed only by plastic stripes.

More detailed information about construction of specimen is shown in the drawings which form an integral part of test report. Drawings were delivered by sponsor.

(5)

3. TEST REPORTS AND EXTENDED APPLICATION REPORTS IN SUPPORT OF CLASSIFICATION 3.1 TEST REPORTS AND EXTENDED APPLICATION REPORTS

No. Name of laboratory Name of sponsors Test report No. Date of the test Test method [1] FIRES, s.r.o.,

Batizovce, SR

BAKS Kazimierz Sielski Karczew,Poland

FIRES-FR-

079-13-AUNE 06. 06. 2013

STN 92 0205 ZP-27/2008 DIN 4102-12 3.2 TEST RESULTS

Specimen

No. Cables Track

No.

Time to first failure / interruption of conductor

1 2 cables NHXH-J FE180 PH90/E90 4x50 RM

15 90 minutes no failure / interruption 2 2 cables NHXH-J FE180 PH90/E90 4x1,5 RE 90 minutes no failure / interruption 3 2 cables NHXH-J FE180 PH90/E90 4x1,0 RE

10

57 minutes

4 2 cables NHXH-J FE180 PH90/E90 4x50 RM 90 minutes no failure / interruption 5 2 cables (N)HXH-J FE180 PH90/E90 4x50 RM 90 minutes no failure / interruption

6 2 cables (N)HXH-J FE180 PH90/E90 4x1,5 RE 38 minutes

7 2 cables (N)HXH-J FE180 PH90/E90 4x50 RM

9 90 minutes no failure / interruption 8 2 cables (N)HXH-J FE180 PH90/E90 4x1,5 RE 90 minutes no failure / interruption 9 2 cables (N)HXH-J FE180 PH90/E90 4x1,5 RE

8

35 minutes

10 2 cables (N)HXH-J FE180 PH90/E90 4x50 RM 90 minutes no failure / interruption

11 2 cables (N)HXH-J FE180 PH30/E30 4x50 RM 70 minutes

12 2 cables (N)HXH-J FE180 PH30/E30 4x1,5 RE 44 minutes 13 2 cables NHXHRHX-J FE180 PH90/E90 4x1,5 RE

6a 90 minutes no failure / interruption 14 2 cables NHXHRHX-J FE180 PH90/E90 4x50 RM 90 minutes no failure / interruption 15 2 cables NHXH-J FE180 PH90/E90 4x50 RM

6 90 minutes no failure / interruption 16 2 cables NHXH-J FE180 PH90/E90 4x1,5 RE 90 minutes no failure / interruption 17 2 cables (N)HXH-J FE180 PH90/E90 4x1,5 RE

14 90 minutes no failure / interruption

18 2 cables (N)HXH-J FE180 PH90/E90 4x50 RM 52 minutes

19 2 cables NHXH-J FE180 PH90/E90 4x16 RM

13 90 minutes no failure / interruption 20 2 cables NHXH-J FE180 PH90/E90 4x1,0 RE 90 minutes no failure / interruption 21 cable NHXH-J FE180 PH90/E90 4x10 RE + fireboxes PMO2

12a 90 minutes no failure / interruption 22 cable NHXH-J FE180 PH90/E90 4x1,5 RE + fireboxes PMO2 90 minutes no failure / interruption 23 2 cables (N)HXH-J FE180 PH90/E90 4x1,5 RE

7

85 minutes

24 2 cables (N)HXH-J FE180 PH90/E90 4x50 RM 76 minutes

25 2 cables NHXH-J FE180 PH90/E90 4x50 RM 90 minutes no failure / interruption 26 2 cables NHXH-J FE180 PH90/E90 4x1,5 RE 90 minutes no failure / interruption 27 2 cables (N)HXH-J FE180 PH90/E90 4x50 RM

5 73 minutes 28 2 cables (N)HXH-J FE180 PH90/E90 4x1,5 RE 74 minutes 29 cable (N)HXH-J FE180 PH90/E90 5x4 RE + fireboxes PMO1

12 90 minutes no failure / interruption 30 cable (N)HXH-J FE180 PH90/E90 4x1,5 RE + fireboxes PMO1 90 minutes no failure / interruption 31 2 cables (N)HXH-J FE180 PH90/E90 4x1,5 RE

4

90 minutes no failure / interruption 32 2 cables (N)HXH-J FE180 PH30/E30 4x1,5 RE 90 minutes no failure / interruption

33 2 cables (N)HXH-J FE180 PH30/E30 4x50 RM 62 minutes

34 2 cables (N)HXH-J FE180 PH90/E90 4x50 RM 90 minutes no failure / interruption 35 2 cables NHXH-J FE180 PH90/E90 4x1,5 RE

2 90 minutes no failure / interruption 36 2 cables NHXH-J FE180 PH90/E90 4x50 RM 90 minutes no failure / interruption

(6)

FIRES-JR-068-13-NURE

FIRES 149/S-27/10/2009-E Page: 5/10

Specimen

No. Cables Track

No.

Time to first failure / interruption of conductor

37 2 cables NHXHRHX-J FE180 PH90/E90 4x50 RM

11

90 minutes no failure / interruption 38 2 cables (N)HXH-J FE180 PH90/E90 4x50 RM 90 minutes no failure / interruption 39 2 cables NHXH-J FE180 PH90/E90 4x50 RM 90 minutes no failure / interruption 40 2 cables (N)HXH-J FE180 PH90/E90 4x50 RM

3

42 minutes

41 2 cables NHXH-J FE180 PH90/E90 4x50 RM 90 minutes no failure / interruption 42 2 cables (N)HXH-J FE180 PH90/E90 4x1,5 RE 90 minutes no failure / interruption 43 2 cables NHXH-J FE180 PH90/E90 4x1,5 RE 90 minutes no failure / interruption 44 2 cables (N)HXH-J FE180 PH90/E90 4x50 RM

1

90 minutes no failure / interruption 45 2 cables NHXH-J FE180 PH90/E90 4x50 RM (1) 90 minutes no failure / interruption 46 2 cables (N)HXH-J FE180 PH90/E90 4x1,5 RE 90 minutes no failure / interruption 47 2 cables NHXH-J FE180 PH90/E90 4x1,5 RE (1) 90 minutes no failure / interruption 48 2 cables NHXHRHX-J FE180 PH90/E90 4x1,5 RE

11

90 minutes no failure / interruption 49 2 cables (N)HXH-J FE180 PH90/E90 4x1,5 RE 90 minutes no failure / interruption 50 2 cables NHXH-J FE180 PH90/E90 4x1,5 RE 90 minutes no failure / interruption 52 2 cables HDGs FE180 PH90/E30-E90 2x1 mm2

15

90 minutes no failure / interruption 53 2 cables HTKSHekw PH90 1x2x0,8 mm 90 minutes no failure / interruption 54 2 cables HTKSH PH90 1x2x0,8 mm 90 minutes no failure / interruption 55 2 cables HDGs FE180 PH90/E30-E90 2x1 mm2

9 90 minutes no failure / interruption

56 2 cables HTKSH PH90 1x2x0,8 mm 55 minutes

57 2 cables HTKSH PH90 1x2x0,8 mm

8 29 minutes

58 2 cables HDGs FE180 PH90/E30-E90 2x1 mm2 32 minutes

59 2 cables HDGs FE180 PH90/E30-E90 2x1 mm2

6a 90 minutes no failure / interruption

60 2 cables HTKSH PH90 1x2x0,8 mm 87 minutes

61 2 cables HTKSHekw PH90 1x2x0,8 mm

14a

90 minutes no failure / interruption 62 2 cables HDGs FE180 PH90/E30-E90 2x1 mm2 90 minutes no failure / interruption 63 2 cables HTKSH PH90 1x2x0,8 mm 90 minutes no failure / interruption 64 2 cables HTKSHekw PH90 1x2x0,8 mm

14

90 minutes no failure / interruption 65 2 cables HTKSH PH90 1x2x0,8 mm 90 minutes no failure / interruption 66 2 cables HDGs FE180 PH90/E30-E90 2x1 mm2 90 minutes no failure / interruption 67 2 cables HDGs FE180 PH90/E30-E90 2x1 mm2

13a 90 minutes no failure / interruption 68 2 cables HTKSH PH90 1x2x0,8 mm 90 minutes no failure / interruption 69 2 cables HDGs FE180 PH90/E30-E90 2x1 mm2

13 90 minutes no failure / interruption

70 2 cables HTKSH PH90 1x2x0,8 mm 89 minutes

71A cables HDGs FE180 PH90/E30-E90 2x1 mm2 + fireboxes PMO2 12a 90 minutes no failure / interruption 71B cables HDGs FE180 PH90/E30-E90 2x1 mm2 + fireboxes PMO1 12 90 minutes no failure / interruption

72 2 cables HDGs FE180 PH90/E30-E90 2x1 mm2 5 77 minutes 73 2 cables HDGs FE180 PH90/E30-E90 3x1 mm2

2 90 minutes no failure / interruption

74 2 cables HTKSH PH90 1x2x0,8 mm 73 minutes

75 2 cables HTKSH PH90 1x2x0,8 mm 3 90 minutes no failure / interruption O1 cable 24 SM FOC 9/125 LT SWA LSZH FR 11 90 minutes no failure / interruption *

The fire test was discontinued in 94th minute at the request of test sponsor.

Specimens S1 – S50 were tested by three-phase voltage supply 3 x 230/400V with bulbs 240V / 60 W.

Specimens S52 – S75 were tested by one-phase voltage supply 1 x 110V with LED diodes 3V /0,03W.

Circuit breakers with rating 3 A were used.

Note: * - result is valid only according to standard ZP-27/2008 PAVUS

(7)

4. CLASSIFICATION AND FIELD OF APPLICATION 4.1 REFERENCE OF CLASSIFICATION

This classification has been carried out in accordance with clause 4.2 of STN 92 0205:2012.

4.2 CLASSIFICATION ACCORDING TO STN 92 0205:2012

The product, Cable bearing system and fireboxes BAKS with cables business TECHNOKABEL S.A. is classified according to the following combinations of performance parameters and classes as appropriate.

Cable Type of tested cable, single cross-

sections and number of conductors Arrangement

Classification for type of tested cable

(by cross-sections and number of

conductors)

Classification for cable

NHXH-J FE180 PH90/E90

(1)

NHXH-J FE180 PH90/E90 4x1,5 RE (1) Cable ladders DUP/DUOP 400H60/B-400.

Consoles WPCE800, brackets WWCT400.

Ceiling installation.

Loading 20 kg.m-1. Consoles in spacing of 1500 mm.

Track No. 1.

E 90 n x ≥1,5 mm2 n ≥ 2 E 90

NHXH-J FE180 PH90/E90 4x50 RM (1) E 90

(N)HXH-J FE180 PH90/E90

(N)HXH-J FE180 PH90/E90 4x1,5 RE E 90 n x ≥1,5 mm2

n ≥ 2 E 90

(N)HXH-J FE180 PH90/E90 4x50 RM E 90

NHXH-J FE180 PH90/E90

NHXH-J FE180 PH90/E90 4x1,5 RE

Cable trays KGJ/KGOJ 400H60/B-400.

Consoles WPCE800, brackets WWCT400.

Ceiling installation.

Loading 20 kg.m-1. Consoles in spacing of 1500 mm.

Track No. 2.

E 90 n x ≥1,5 mm2 n ≥ 2 E 90

NHXH-J FE180 PH90/E90 4x50 RM E 90

HTKSH

PH90 HTKSH PH90 1x2x0,8 mm E 60

n x 2 x ≥ 0,8 mm n ≥ 1 E 60 HDGs

FE180 PH90/E30-E90

HDGs FE180 PH90/E30-E90 3x1 mm2 E 90

n x ≥ 1,0 mm2 n ≥ 3 E 90 NHXH-J

FE180 PH90/E90

NHXH-J FE180 PH90/E90 4x1,5 RE

Cable mesh trays KDS/KDSO 400H60/B-400.

Consoles WPCE800, brackets WWCT400.

Ceiling installation.

Loading 20 kg.m-1. Consoles in spacing of 1500 mm.

Track No. 3.

E 90 n x ≥1,5 mm2 n ≥ 2 E 90

NHXH-J FE180 PH90/E90 4x50 RM E 90

(N)HXH-J FE180 PH90/E90

(N)HXH-J FE180 PH90/E90 4x1,5 RE E 90 n x ≥1,5 mm2

n ≥ 2 E 30

(N)HXH-J FE180 PH90/E90 4x50 RM E 30

HTKSH

PH90 HTKSH PH90 1x2x0,8 mm E 90

n x 2 x ≥ 0,8 mm n ≥ 1 E 90 (N)HXH-J

FE180 PH90/E90

(N)HXH-J FE180 PH90/E90 4x1,5 RE Cable trays KGJ/KGOJ 400H60/B-400.

Consoles WPCE800, brackets WWCT400.

Ceiling installation.

Loading 20 kg.m-1. Consoles in spacing of 1500 mm.

Track No. 4.

E 90 n x ≥1,5 mm2 n ≥ 2 E 90

(N)HXH-J FE180 PH90/E90 4x50 RM E 90

(N)HXH-J FE180 PH30/E30

(N)HXH-J FE180 PH30/E30 4x1,5 RE E 90 n x ≥1,5 mm2

n ≥ 2 E 60

(N)HXH-J FE180 PH30/E30 4x50 RM E 60

(N)HXH-J FE180 PH90/E90

(N)HXH-J FE180 PH90/E90 4x1,5 RE Cable ladders DSH 400H80/B-400 fixed to ceiling reversely by clamps NKH

on both sides.

Ceiling installation, Loading 20 kg.m-1. Clamps in spacing of 1500 mm.

Track No. 5.

E 60 n x ≥1,5 mm2 n ≥ 2 E 60

(N)HXH-J FE180 PH90/E90 4x50 RM E 60

HDGs FE180 PH90/E30-E90

HDGs FE180 PH90/E30-E90 2x1 mm2 E 60

n x ≥ 1,0 mm2 n ≥ 2 E 60

(8)

FIRES-JR-068-13-NURE

FIRES 149/S-27/10/2009-E Page: 7/10

Cable Type of tested cable, single cross-

sections and number of conductors Arrangement

Classification for type of tested cable

(by cross-sections and number of

conductors)

Classification for cable

NHXH-J FE180 PH90/E90

NHXH-J FE180 PH90/E90 4x1,5 RE

Cable trays KGJ/KGOJ 400H60/B-400.

Consoles combined of horizontal support CWP/CWOP40H40/05 and threaded rods PG M10. Two tracks are connected together by horizontal tee TKJ400H60 and

horizontal bend KKJ400H60.

Ceiling installation.

Loading 20 kg.m-1. Consoles in spacing of 1500 mm.

Tracks No. 6 and 6a.

E 90 n x ≥1,5 mm2 n ≥ 2 E 90

NHXH-J FE180 PH90/E90 4x50 RM E 90

NHXHRHX-J FE180 PH90/E90

NHXHRHX-J FE180 PH90/E90 4x1.5 RE E 90 n x ≥1,5 mm2

n ≥ 2 E 90

NHXHRHX-J FE180 PH90/E90 4x50 RM E 90

HTKSH

PH90 HTKSH PH90 1x2x0,8 mm E 60

n x 2 x ≥ 0,8 mm n ≥ 1 E 60 HDGs

FE180 PH90/E30-E90

HDGs FE180 PH90/E30-E90 2x1 mm2 E 90

n x ≥ 1,0 mm2 n ≥ 2 E 90 NHXH-J

FE180 PH90/E90

NHXH-J FE180 PH90/E90 4x1,5 RE Cable ladders DUP/DUOP 400H60/B-400

with cover PDDP400 and clips ZAP2.

Consoles combined of horizontal support CMP40H22/05 and

threaded rods PG M8.

Ceiling installation.

Loading 20 kg.m-1. Consoles in spacing of 1500 mm.

Track No. 7.

E 90 n x ≥1,5 mm2 n ≥ 2 E 90

NHXH-J FE180 PH90/E90 4x50 RM E 90

(N)HXH-J FE180 PH90/E90

(N)HXH-J FE180 PH90/E90 4x1,5 RE E 60

n x ≥1,5 mm2 n ≥ 2 E 60

(N)HXH-J FE180 PH90/E90 4x50 RM E 60

(N)HXH-J FE180 PH30/E30

(N)HXH-J FE180 PH30/E30 4x1,5 RE

Cable trays KBJ 400H60/B-400 with cover PKL 400 and clips ZPD H60.

Consoles combined of horizontal support CWP/CWOP40H40/05

and threaded rods PG M10.

Ceiling installation.

Loading 20 kg.m-1. Consoles in spacing of 1500 mm.

Track No. 8.

E 30 n x ≥1,5 mm2 n ≥ 2 E 30

(N)HXH-J FE180 PH30/E30 4x50 RM E 60

(N)HXH-J FE180 PH90/E90

(N)HXH-J FE180 PH90/E90 4x1,5 RE E 30 n x ≥1,5 mm2

n ≥ 2 E 30

(N)HXH-J FE180 PH90/E90 4x50 RM E 90

HTKSH

PH90 HTKSH PH90 1x2x0,8 mm Without

classification

Without classification HDGs

FE180 PH90/E30-E90

HDGs FE180 PH90/E30-E90 2x1 mm2 E 30

n x ≥ 1,0 mm2 n ≥ 2 E 30 (N)HXH-J

FE180 PH90/E90

(N)HXH-J FE180 PH90/E90 4x1,5 RE Cable trays KGL/KGOL 300H60/B-300

with cover PKL 300 and clips ZPD H60.

Consoles WPCW/WPCO800 and brackets WMC/WMCO400 with

threaded rods PG M10 to holder USV/USOV.

Loading 20 kg.m-1.

Consoles in spacing of 1500 mm.

Track No. 9.

E 90 n x ≥1,5 mm2 n ≥ 2 E 90

(N)HXH-J FE180 PH90/E90 4x50 RM E 90

HTKSH

PH90 HTKSH PH90 1x2x0,8 mm E 30

n x 2 x ≥ 0,8 mm n ≥ 1 E 30 HDGs

FE180 PH90/E30-E90

HDGs FE180 PH90/E30-E90 2x1 mm2 E 90

n x ≥ 1,0 mm2 n ≥ 2 E 90 (N)HXH-J

FE180 PH90/E90

(N)HXH-J FE180 PH90/E90 4x1,5 RE Cable trays KGJ/KGOJ 400H60/B-400.

Consoles WPCW/WPCO800 and brackets WMC/WMCO400 with

threaded rods PG M10 to holder USV/USOV.

Loading 20 kg.m-1.

Consoles in spacing of 1500 mm.

Track No. 10.

E 30 n x ≥1,5 mm2 n ≥ 2 E 30

(N)HXH-J FE180 PH90/E90 4x50 RM E 90

NHXH-J FE180 PH90/E90

NHXH-J FE180 PH90/E90 4x1,0 RE E 30 n x ≥1,0 mm2

n ≥ 2 E 30

NHXH-J FE180 PH90/E90 4x50 RM E 90

(9)

Cable Type of tested cable, single cross-

sections and number of conductors Arrangement

Classification for type of tested cable

(by cross-sections and number of

conductors)

Classification for cable

NHXH-J FE180 PH90/E90

NHXH-J FE180 PH90/E90 4x1,5 RE

Cable clips UDF fixed to ceiling by anchors MKR6 (FMD 6 FISCHER)

in spacing of 600 mm.

Track No. 11.

E 90 n x ≥1,5 mm2 n ≥ 2 E 90

NHXH-J FE180 PH90/E90 4x50 RM E 90

(N)HXH-J FE180 PH90/E90

(N)HXH-J FE180 PH90/E90 4x1,5 RE E 90 n x ≥1,5 mm2

n ≥ 2 E 90

(N)HXH-J FE180 PH90/E90 4x50 RM E 90

NHXHRHX-J FE180 PH90/E90

NHXHRHX-J FE180 PH90/E90 4x1.5 RE E 90 n x ≥1,5 mm2

n ≥ 2 E 90

NHXHRHX-J FE180 PH90/E90 4x50 RM E 90

(N)HXH-J FE180 PH90/E90

(N)HXH-J FE180 PH90/E90 4x1,5 RE + fireboxes PMO1

Cable clips UDF fixed to ceiling by anchors MKR6 (FMD 6 FISCHER)

in spacing of 300 mm.

Track No. 12 and 12a.

E 90 n x ≥1,5 – 4 mm2 n ≥ 2 E 90 (N)HXH-J FE180 PH90/E90 5x4 RE +

fireboxes PMO1 E 90

NHXH-J FE180 PH90/E90

NHXH-J FE180 PH90/E90 4x1,5 RE +

fireboxes PMO2 E 90 n x ≥1,5 – 10 mm2

n ≥ 2 E 90 NHXH-J FE180 PH90/E90 4x10 RE +

fireboxes PMO2 E 90

HDGs FE180 PH90/E30-E90

HDGs FE180 PH90/E30-E90 2x1 mm2 +

fireboxes PMO1 E 90

n x ≥ 1,0 mm2 n ≥ 2 E 90 HDGs FE180 PH90/E30-E90 2x1 mm2 +

fireboxes PMO2 E 90

n x ≥ 1,0 mm2 n ≥ 2 E 90 NHXH-J

FE180 PH90/E90

NHXH-J FE180 PH90/E90 4x1,0 RE Cable mesh trays KGS 60H60/B-60 fixed to ceiling by joint connectors USSPW and

by anchors MKR 6 (FMD 6 FISCHER).

Loading 5 kg.m-1. Connectors in spacing

of 1500 mm.

Track No. 13.

E 90 n x ≥1,0 – 16 mm2 n ≥ 2 E 90

NHXH-J FE180 PH90/E90 4x16 RM E 90

HTKSH

PH90 HTKSH PH90 1x2x0,8 mm E 60

n x 2 x ≥ 0,8 mm n ≥ 1 E 60 HDGs

FE180 PH90/E30-E90

HDGs FE180 PH90/E30-E90 2x1 mm2 E 90

n x ≥ 1,0 mm2 n ≥ 2 E 90 HTKSH

PH90 HTKSH PH90 1x2x0,8 mm

Cable mesh trays KGS 60H60/B-60 fixed to ceiling by joint connectors USSPW and

threaded rods PG M6.

Loading 5 kg.m-1. Fixing in spacing of 1500 mm.

Track No. 13a.

E 90

n x 2 x ≥ 0,8 mm n ≥ 1 E 90 HDGs

FE180 PH90/E30-E90

HDGs FE180 PH90/E30-E90 2x1 mm2 E 90

n x ≥ 1,0 mm2 n ≥ 2 E 90

(N)HXH-J FE180 PH90/E90

(N)HXH-J FE180 PH90/E90 4x1,5 RE

Cable mesh trays KGS 100H60/B-100 fixed to

ceiling by joint connectors USSPW and by anchors MKR 6

(FMD 6 FISCHER).

Loading 5 kg.m-1. Connectors in spacing

of 1500 mm.

Track No. 14.

E 90 n x ≥1,5 mm2 n ≥ 2 E 30

(N)HXH-J FE180 PH90/E90 4x50 RM E 30

HDGs FE180 PH90/E30-E90

HDGs FE180 PH90/E30-E90 2x1 mm2 E 90

n x ≥ 1,0 mm2 n ≥ 2 E 90 HTKSH

PH90 HTKSH PH90 1x2x0,8 mm E 90

n x 2 x ≥ 0,8 mm n ≥ 1 E 90 HTKSHekw

PH90 HTKSHekw PH90 1x2x0,8 mm E 90

n x 2 x ≥ 0,8 mm n ≥ 1 E 90

(10)

FIRES-JR-068-13-NURE

FIRES 149/S-27/10/2009-E Page: 9/10

Cable Type of tested cable, single cross-

sections and number of conductors Arrangement

Classification for type of tested cable

(by cross-sections and number of

conductors)

Classification for cable

HTKSH

PH90 HTKSH PH90 1x2x0,8 mm Cable mesh trays

KGS 100H60/B-100 fixed to ceiling by joint connectors

USSPW and threaded rods PG M6.

Loading 5 kg.m-1. Fixing in spacing of 1500 mm.

Track No. 14a.

E 90

n x 2 x ≥ 0,8 mm n ≥ 1 E 90 HDGs

FE180 PH90/E30-E90

HDGs FE180 PH90/E30-E90 2x1 mm2 E 90

n x ≥ 1,0 mm2 n ≥ 2 E 90 HTKSHekw

PH90 HTKSHekw PH90 1x2x0,8 mm E 90

n x 2 x ≥ 0,8 mm n ≥ 1 E 90 NHXH-J

FE180 PH90/E90

NHXH-J FE180 PH90/E90 4x1,5 RE

Wall channels KS 115H68/2 fixed to side wall by dowels MKR 6 in

spacing of 800 mm.

Track No. 15.

E 90 n x ≥1,5 mm2 n ≥ 2 E 90

NHXH-J FE180 PH90/E90 4x50 RM E 90

HTKSH

PH90 HTKSH PH90 1x2x0,8 mm E 90

n x 2 x ≥ 0,8 mm n ≥ 1 E 90 HTKSHekw

PH90 HTKSHekw PH90 1x2x0,8 mm E 90

n x 2 x ≥ 0,8 mm n ≥ 1 E 90 HDGs

FE180 PH90/E30-E90

HDGs FE180 PH90/E30-E90 2x1 mm2 E 90

n x ≥ 1,0 mm2 n ≥ 2 E 90

4.3 FIELD OF APPLICATION

This classification is valid for the following end use applications:

§ throughout the period during which circuit integrity is to be maintained, neighbouring building components shall not have a negative effect on circuit integrity;

§ although testing is only carried out on cables arranged horizontally, test results also apply to cables arranged either diagonally or vertically (e.g. risers), as long as the cable system is supported in transitional areas (i.e. where it switches from a horizontal to a vertical arrangement) in such a manner that the cables will not slip or kink at corners;

§ test results of function in fire test of cables tested at standard supporting construction are also applicable for tested standard supporting construction of other producers;

§ test results of function in fire test of cables tested at standard supporting construction are also applicable for cables of other producers tested at standard supporting construction;

§ maximal length of increasing routing shall be 3500 mm with consistent horizontal placing of cable with minimal length of 300 mm (apart from cable bending) and with maximal spacing of clips of 300 mm, eventually the cables are stabilized by cable transmissions at floor or ceiling with particular fire resistance;

§ for vertical systems, the test results obtained for cables mounted singly on the ceiling using single clips apply. Brackets of proven suitability may also be used, as long as their spacing is equal to that of the single clips tested;

§ results of testing single cables on the ceiling apply also to cables mounted horizontally on walls;

§ results of testing bunched cables on a ladder or tray also apply to support construction attached to a wall. However, such constructions required proof of suitability by means of a test certificate or other document issued by an accredited testing laboratory.

§ test results of cables tested at fireboxes PMO1 and PMO2 on the ceiling are applicable also for cables mounted horizontally on walls, but not conversely;

§ test results of cables connected to fireboxes type PMO1, PMO2 and fixed to ceiling by cable clips type UDF in spacing of 300 mm are also applicable for cables of other producers with same classification function in fire;

(11)

5. LIMITATIONS

Load-bearing construction elements for fixing of cable systems must be proved for at least the same fire resistance compare to classified function in fire of cable system.

This classification document does not represent type approval or certification of the product.

The classification is valid until 07. 06. 2018 provided that the product, field of application and standards and regulations are not changed.

Approved: Signed:

Ing. Štefan Rástocký Bc. Dávid Šubert

leader of the testing laboratory technician of the testing laboratory

Cytaty

Powiązane dokumenty

1-L1 no failure / interruption 2-L2 no failure / interruption 3-L3 no failure / interruption 4-PEN no failure / interruption 5-L1 no failure / interruption 6-L2 no failure

§ test results of cables bunched on the ladder or in the tray are also applicable to supporting constructions fixed in the wall, while this construction was tested at the

The element, Power and communications cables TECHNOKABEL, type – NHXH, NHXCH, HTKSHekw and JE-H(St)H at cable bearing system BAKS - cable trays KCOP, cable

The element, Communications cables TECHNOKABEL, type – HTKSH and HTKSHekw at cable bearing system BAKS - cable trays KCOP, cable ladders DGOP, ceiling ledges SDOC with clips

The element comprise of cable bearing system BAKS – cable trays KBL, KBJ, KBP, KCL, KCP, KFL, KFJ, KGL cable mesh trays KDS, KDSZ, cable ladders DFP, DUD, clips UDFB,

Supports type CWP/CWOP are made from steel sheet thickness 1,5 mm. Supports are used to gripping trays or ladders to the ceiling with threaded bar. Fireboxes can be used for

Product comprise of cable bearing system BAKS – cable trays, cable ladders, cable mesh trays, cable single clips KSA and fireboxes PMO3B with accessories, power

Product comprise of fireboxes of company W2 with accessories and cable bearing system BAKS Kazimierz Sielski company – cable trays, ladders, mesh trays with