FUNCTION IN FIRE EXPERT JUDGEMENT REPORT WITH CLASSIFICATION FIRES-JR-022-14-NURE

Cable bearing system BAKS with cables business TECHNOKABEL S.A.

with fixing accessories of Hilti Poland Sp. z o.o.

This is an electronic version of a classification report which was made as a copy of classification report officially issued in a paper form. The electronic version of a classification report shall be used only for informative purpose. Any information listed in this classification report is the property of the sponsor and shall not be used or published without written permission. Contents of this file may only be modified by the editor i.e.

FIRES, s.r.o., Batizovce. Sponsor is allowed to publish this classification report in parts only with written permission of the editor.

FIRES 004/S2-20/12/2012-E-el

(2)

FUNCTION IN FIRE EXPERT JUDGEMENT REPORT WITH CLASSIFICATION IN ACCORDANCE WITH DIN 4102-12: 1998-11

FIRES-JR-022-14-NURE

FIRES 149/S-28/03/2014-E FIRES, s.r.o., Osloboditeľov 282, 059 35 Batizovce, Slovak Republic tel. 00421 52 775 22 98, fax. 00421 52 788 14 12, www.fires.sk Notified Body No. 1396, Approved Body No. SK01, Member of EGOLF

Name of the product: Cable bearing system BAKS with cables business TECHNOKABEL S.A.

with fixing accessories of Hilti Poland Sp. z o.o.

Sponsor: BAKS Kazimierz Sielski ul. Jagodne 5

05 - 480 Karczew Poland

Prepared by: FIRES, s.r.o.

Approved Body No. SK01 Osloboditeľov 282

059 35 Batizovce Slovak Republic

Task No.: PR-14-0108 Date of issue: 12. 05. 2014

Reports: 7

Copy No.: 2

Distribution list:

Copy No. 1 FIRES, s. r. o., Osloboditeľov 282, 059 35 Batizovce, Slovak Republic (electronic version)

Copy No. 2 BAKS Kazimierz Sielski, ul. Jagodne 5, 05 - 480 Karczew, Poland (electronic version)

Copy No. 3 TECHNOKABEL S.A., Nasielska 55, 04 – 343 Warszawa, Poland (electronic version)

Copy No. 4 Hilti Poland Sp. z o.o., ul.Pulawska 491, 02 – 844 Warszawa, Poland (electronic version)

Copy No. 5 BAKS Kazimierz Sielski, ul. Jagodne 5, 05-480 Karczew, Poland

Copy No. 6 TECHNOKABEL S.A., Nasielska 55, 04 – 343 Warszawa, Poland

Copy No. 7 Hilti Poland Sp. z o.o., ul.Pulawska 491, 02 – 844 Warszawa, Poland

(3)

1. INTRODUCTION

This expert judgement report with classification defines the function in fire classification assigned to element „ Cable bearing system BAKS with cables business TECHNOKABEL S.A. with fixing accessories of Hilti Poland Sp. z o.o.” in accordance with the classes given in DIN 4102-12: 1998-11.

This test was carried out according to standard STN 92 0205: 2012 and meets requirements of DIN 4102-12: 1998-11. Basic deviation in process and carrying out of test between these standards is in measuring and in control of temperature in the test furnace. According to STN 92 0205: 2012, plate thermometers according to EN 1363-1 are used. According to DIN 4102-12: 1998-11, common thermocouples of construction which was used for this measurement till issue of EN 1363-1 are used.

Measurement by plate thermometers acc. to EN 1363-1 can be considered as stricter method of temperature control in test furnace in compare with thermocouples used till issue of EN 1363-1. Therefore, it is possible to use results of test according to STN 92 025: 2012 for classification of tested cables according to DIN 4102-12: 1998-11, but not conversely.

This expert judgement report defines field of application which is outside the field of direct application according test standard or outside the field of extended application according to relevant extended application standard. This expert judgement expresses the opinion of the FIRES and is based on the experience or internal rules of FIRES.

2. DETAILS OF CLASSIFIED PRODUCT 2.1 GENERAL

The element, Cable bearing system BAKS with cables business TECHNOKABEL S.A. with fixing accessories of Hilti Poland Sp. z o.o., is defined as a cable bearing system for power and communication halogen free cables with circuit integrity maintenance.

2.2 PRODUCT DESCRIPTION

Product comprise of cable bearing system BAKS – cable trays, cable ladders, cable mesh trays, cable with accessories and power and communication halogen free cables of TECHNOKABEL S.A. company with fixing accessories (cable clips, anchors) of Hilti Poland Sp. z o.o..

Cable trays

Cable trays type KGJ/KGOJ…H60 are made from steel sheet thickness 0,9 mm.

Cable trays type KBJ…H60 (trays without perforation) are made from steel sheet thickness 0,9 mm.

Cable trays type KCJ/KCOJ…H60 are made from steel sheet thickness 0,9 mm.

Cable trays type KBL…H60 (trays without perforation) are made from steel sheet thickness 0,7 mm.

Cable trays type KCL/KCOL…H60 are made from steel sheet thickness 0,7 mm.

Trays are connected together and fixed by screws (SGK M6x12). Cable trays are used as a bearing system for the cables.

Cable mesh trays

Cable trays type KDS/KDSO…H60 are made from steel wire ∅ 4,5 mm. Mesh trays are jointed together by junctions (USSN/USSO). Mesh trays are used as bearing system for the cables.

Cable ladders

Cable ladders type DUP/DUOP…H60 are made from steel sheet thickness 1,5 mm and spacing of transoms is 300 mm.

Cable ladders type DUD/DUOD…H60 are made from steel sheet thickness 1,2 mm and spacing of transoms is 300 mm.

Ladders are jointed together by two junctions (LDC/LDOCH60 - steel sheet 1,5 mm thick) on sides and by

screws (SGK M8x14). Cable ladders are used as bearing system for the cables.

(4)

FIRES-JR-022-14-NURE

FIRES 149/S-28/03/2014-E Page: 3/10

Brackets

Brackets type WMC/WMCO… are made from steel sheet thickness 2,5 mm and 5 mm.

Brackets type WWS/WWSO… are made from steel sheet thickness 2,0 mm.

Brackets are used to gripping trays or ladders to ceiling or to wall.

Assembling profiles

Assembling profiles type CWP/CWOP40H40 and CWP40H22 are made from steel sheet thickness 1,5 mm. Assembling profiles are used to gripping trays or ladders.

Cable clips

Single cable clips X-FB MX and double cable clips X-DFB MX are made of steel sheet 1,0 mm thick. Clips are used for fixing pipes and cables to ceiling and wall. Clips are fixed by steel self-drilling screws or by powder actuated fastening tool DX 460 with nails (X – U, X – C) or by gas fastening tool GX 120-ME with nails (X – GHP, X – GN, X – EGN).

Fireboxes

Fireboxes PMO1 and PMO2 are made of steel sheets with thickness 1,0 mm and bottom part 1,25 mm.

Fireboxes can be used for cross connection of cable – number of cables and conductors according to type. It can be used inside the buildings on the ceiling or wall.

Used cables by test:

Power cables:

(N)HXH-J FE180 PH30/E30 4x1,5 RE (12x) (N)HXH-J FE180 PH30/E30 4x50 RM (12x) (N)HXH-J FE180 PH90/E90 4x1,5 RE (24x) (N)HXH-J FE180 PH90/E90 4x50 RM (24x) NHXH-J FE180 PH90/E90 4x1,5 RE (8x) NHXH-J FE180 PH90/E90 4x6 RE (1x) NHXH-J FE180 PH90/E90 4x10 RE (1x) NHXH-J FE180 PH90/E90 4x50 RM (6x) Communication cables:

HTKSH PH90 1x2x0,8 mm (14x)

HTKSHekw PH90 1x2x0,8 mm (10x)

HDGs FE180 PH90/E30-E90 2x1mm

2

(16x)

The length of cables was 5,5 m and 4,0 m from that was exposed to fire.

More detailed information about product construction is shown in the drawings which form an integral part

of test report [1]. Drawings were delivered by sponsor.

(5)

3. TEST REPORTS AND EXTENDED APPLICATION REPORTS IN SUPPORT OF CLASSIFICATION 3.1 TEST REPORTS AND EXTENDED APPLICATION REPORTS

No. Name of

laboratory Name of sponsor Test report No. Date of the

test Test method [1] FIRES, s.r.o.,

Batizovce, SR

BAKS Kazimierz Sielski, 05 - 480 Karczew, Poland

FIRES-FR- 049-14-AUNE

20. 03.

2014

STN 92 0205 ZP-27/2008 DIN 4102-12 3.2 TEST RESULTS

No./

Test method

Specimen

No. Cables Track

No.

Time to first failure / interruption of conductor

[1]

STN 92 0205 ZP-27/2008 DIN 4102-12

1 2 cables (N)HXH-J FE180 PH30/E30 4x1,5 RE

15 90 minutes no failure / interruption 2 2 cables (N)HXH-J FE180 PH30/E30 4x50 RM 29 minutes

3 2 cables (N)HXH-J FE180 PH90/E90 4x1,5 RE

14 42 minutes

4 2 cables (N)HXH-J FE180 PH90/E90 4x50 RM 90 minutes no failure / interruption 5 2 cables (N)HXH-J FE180 PH90/E90 4x1,5 RE

13

90 minutes no failure / interruption 6 2 cables (N)HXH-J FE180 PH90/E90 4x50 RM 90 minutes no failure / interruption 7 2 cables NHXH-J FE180 PH90/E90 4x50 RM 90 minutes no failure / interruption 8 2 cables NHXH-J FE180 PH90/E90 4x1,5 RE 90 minutes no failure / interruption 9 2 cables NHXH-J FE180 PH90/E90 4x1,5 RE

12 90 minutes no failure / interruption 10 2 cables NHXH-J FE180 PH90/E90 4x50 RM 90 minutes no failure / interruption 11 2 cables (N)HXH-J FE180 PH90/E90 4x1,5 RE

11 90 minutes no failure / interruption 12 2 cables (N)HXH-J FE180 PH90/E90 4x50 RM 90 minutes no failure / interruption 13 2 cables (N)HXH-J FE180 PH90/E90 4x1,5 RE

10 90 minutes no failure / interruption 14 2 cables (N)HXH-J FE180 PH90/E90 4x50 RM 90 minutes no failure / interruption 15 2 cables (N)HXH-J FE180 PH90/E90 4x1,5 RE

9 30 minutes

16 2 cables (N)HXH-J FE180 PH90/E90 4x50 RM 90 minutes no failure / interruption 17 2 cables NHXH-J FE180 PH90/E90 4x1,5 RE

8 90 minutes no failure / interruption 18 2 cables NHXH-J FE180 PH90/E90 4x50 RM 90 minutes no failure / interruption 19 2 cables (N)HXH-J FE180 PH90/E90 4x1,5 RE

7 58 minutes

20 2 cables (N)HXH-J FE180 PH90/E90 4x50 RM 90 minutes no failure / interruption 21 2 cables (N)HXH-J FE180 PH30/E30 4x1,5 RE

6

31 minutes

22 2 cables (N)HXH-J FE180 PH30/E30 4x50 RM 90 minutes no failure / interruption 23 2 cables (N)HXH-J FE180 PH90/E90 4x50 RM 36 minutes

24 2 cables (N)HXH-J FE180 PH90/E90 4x1,5 RE 31 minutes 25 2 cables (N)HXH-J FE180 PH30/E30 4x1,5 RE

5

90 minutes no failure / interruption 26 2 cables (N)HXH-J FE180 PH30/E30 4x50 RM 90 minutes no failure / interruption 27 2 cables (N)HXH-J FE180 PH90/E90 4x50 RM 90 minutes no failure / interruption 28 2 cables (N)HXH-J FE180 PH90/E90 4x1,5 RE 90 minutes no failure / interruption 29 2 cables (N)HXH-J FE180 PH30/E30 4x1,5 RE

4

90 minutes no failure / interruption 30 2 cables (N)HXH-J FE180 PH30/E30 4x50 RM 90 minutes no failure / interruption 31 2 cables (N)HXH-J FE180 PH90/E90 4x50 RM 90 minutes no failure / interruption 32 2 cables (N)HXH-J FE180 PH90/E90 4x1,5 RE 90 minutes no failure / interruption 33 2 cables (N)HXH-J FE180 PH90/E90 4x50 RM

3 90 minutes no failure / interruption 34 2 cables (N)HXH-J FE180 PH90/E90 4x1,5 RE 32 minutes

(6)

FIRES-JR-022-14-NURE

FIRES 149/S-28/03/2014-E Page: 5/10

No./

Test method

Specimen

No. Cables Trac

k No.

Time to first failure / interruption of conductor

[1]

STN 92 0205 ZP-27/2008 DIN 4102-12

35 2 cables (N)HXH-J FE180 PH30/E30 4x1,5 RE

2

43 minutes 36 2 cables (N)HXH-J FE180 PH30/E30 4x50 RM 77 minutes 37 2 cables (N)HXH-J FE180 PH90/E90 4x50 RM 43 minutes

38 2 cables (N)HXH-J FE180 PH90/E90 4x1,5 RE 90 minutes no failure / interruption 39 cable (N)HXH-J FE180 PH30/E30 4x1,5 RE

1

90 minutes no failure / interruption 40 cable (N)HXH-J FE180 PH30/E30 4x1,5 RE 90 minutes no failure / interruption 41 cable (N)HXH-J FE180 PH30/E30 4x50 RM 90 minutes no failure / interruption 42 cable (N)HXH-J FE180 PH30/E30 4x50 RM 90 minutes no failure / interruption 43 cable (N)HXH-J FE180 PH90/E90 4x50 RM 90 minutes no failure / interruption 44 cable (N)HXH-J FE180 PH90/E90 4x50 RM 90 minutes no failure / interruption 45 cable (N)HXH-J FE180 PH90/E90 4x1,5 RE 90 minutes no failure / interruption 46 cable (N)HXH-J FE180 PH90/E90 4x1,5 RE 90 minutes no failure / interruption 47 cable NHXH-J FE180 PH90/E90 4x10 RE + fireboxes PMO2

19

90 minutes no failure / interruption 48 cable NHXH-J FE180 PH90/E90 4x1,5 RE + fireboxes PMO2 90 minutes no failure / interruption 49 cable NHXH-J FE180 PH90/E90 4x6 RE + fireboxes PMO1

18 90 minutes no failure / interruption 50 cable NHXH-J FE180 PH90/E90 4x1,5 RE + fireboxes PMO1 90 minutes no failure / interruption 52 2 cables HDGs FE180 PH90/E30-E90 2x1 mm2

23

90 minutes no failure / interruption 53 2 cables HTKSHekw PH90 1x2x0,8 mm 90 minutes no failure / interruption 54 2 cables HTKSH PH90 1x2x0,8 mm 90 minutes no failure / interruption 55 2 cables HTKSH PH90 1x2x0,8 mm 90 minutes no failure / interruption 56 2 cables HDGs FE180 PH90/E30-E90 2x1 mm2

22 90 minutes no failure / interruption 57 2 cables HTKSH PH90 1x2x0,8 mm 90 minutes no failure / interruption 58 2 cables HDGs FE180 PH90/E30-E90 2x1 mm2

21

90 minutes no failure / interruption 59 2 cables HTKSHekw PH90 1x2x0,8 mm 90 minutes no failure / interruption 60 2 cables HTKSH PH90 1x2x0,8 mm 90 minutes no failure / interruption 61 2 cables HDGs FE180 PH90/E30-E90 2x1 mm2

20

84 minutes

62 2 cables HTKSHekw PH90 1x2x0,8 mm 90 minutes no failure / interruption 63 2 cables HTKSH PH90 1x2x0,8 mm 90 minutes no failure / interruption 64 2 cables HDGs FE180 PH90/E30-E90 2x1 mm2

16

90 minutes no failure / interruption 65 2 cables HTKSH PH90 1x2x0,8 mm 90 minutes no failure / interruption 66 2 cables HTKSHekw PH90 1x2x0,8 mm 90 minutes no failure / interruption 67 2 cables HDGs FE180 PH90/E30-E90 2x1 mm2 90 minutes no failure / interruption 68 2 cables HDGs FE180 PH90/E30-E90 2x1 mm2

17

90 minutes no failure / interruption 69 2 cables HTKSH PH90 1x2x0,8 mm 90 minutes no failure / interruption 70 2 cables HTKSHekw PH90 1x2x0,8 mm 90 minutes no failure / interruption 71 2 cables HDGs FE180 PH90/E30-E90 2x1 mm2 90 minutes no failure / interruption

[1] The test was discontinued in 93

rd

minute at the request of test sponsor.

Specimens S1 – S50 (apart from S22 – S27 and S35 – S38) were tested by three-phase voltage supply 3 x 230/400V with bulbs 240V / 60 W.

Specimens S22 – S27 and S35 – S38 were tested by three-phase voltage supply 1 x 230V with bulbs 240V / 60 W.

Specimens S52 – S71 were tested by one-phase voltage supply 1 x 110V with LED diodes 3V /0,03W.

Circuit breakers with rating 3 A were used.

(7)

4. CLASSIFICATION AND FIELD OF APPLICATION 4.1 REFERENCE OF CLASSIFICATION

This classification has been carried out in accordance with clause 3.2 of DIN 4102 – 12:1998-11.

4.2 CLASSIFICATION ACCORDING TO DIN 4102-12: 1998-11

Cable Type of tested cable, single cross-

sections and number of conductors Arrangement

Classification for type of tested cable

(by cross-sections and number of

conductors)

Classification for cable

(N)HXH FE180 PH90/E90

(N)HXH-J FE180 PH90/E90 4x1,5 RE Cable trays KGJ/KGOJ400H60.

Consoles combined of assembling profile CWP40H22/05 and threaded rods PG M8 fixed to

ceiling by anchors HKD M8x30 HILTI.

Loading 15kg.m-1. Consoles in spacing of 1500 mm.

Track No. 1.

E 90 n x ≥1,5 mm2 n ≥ 2 E 90

(N)HXH-J FE180 PH90/E90 4x50 RM E 90

(N)HXH FE180 PH30/E30

(N)HXH-J FE180 PH30/E30 4x1,5 RE E 90 n x ≥1,5 mm2

n ≥ 2 E 90

(N)HXH-J FE180 PH30/E30 4x50 RM E 90

(N)HXH FE180 PH90/E90

(N)HXH-J FE180 PH90/E90 4x1,5 RE Cable mesh trays KDS/KDSO400H60. Consoles combined of assembling profiles CWP40H22/05 and threaded rods

PG M10 fixed to ceiling by anchors HKD M10x30 HILTI.

Loading 15kg.m-1. Consoles in spacing of 1500 mm.

Track No. 2.

E 90 n x ≥1,5 mm2 n ≥ 2 E 30

(N)HXH-J FE180 PH90/E90 4x50 RM E 30

(N)HXH FE180 PH30/E30

(N)HXH-J FE180 PH30/E30 4x1,5 RE E 30 n x ≥1,5 mm2

n ≥ 2 E 30

(N)HXH-J FE180 PH30/E30 4x50 RM E 60

(N)HXH FE180 PH90/E90

(N)HXH-J FE180 PH90/E90 4x1,5 RE

Cable trays KBJ400H60 covered by PKJ400 with connectors ZPD H60. Consoles combined of

assembling profiles CWP40H22/05 and threaded rods

PG M10 fixed to ceiling by anchors HKD M10x30 HILTI.

Loading 15kg.m-1. Consoles in spacing of 1500 mm.

Track No. 3.

E 30

n x ≥1,5 mm2 n ≥ 2 E 30

(N)HXH-J FE180 PH90/E90 4x50 RM E 90

(N)HXH FE180 PH90/E90

(N)HXH-J FE180 PH90/E90 4x1,5 RE Cable trays KGJ/KGOJ400H60.

Consoles combined of assembling profile CWP/CWOP40H40/05 and

threaded rods PG M8 fixed to ceiling by anchors HKD M8x30 HILTI.

Loading 15kg.m-1. Consoles in spacing of 1500 mm.

Track No. 4.

E 90 n x ≥1,5 mm2 n ≥ 2 E 90

(N)HXH-J FE180 PH90/E90 4x50 RM E 90

(N)HXH FE180 PH30/E30

(N)HXH-J FE180 PH30/E30 4x1,5 RE E 90 n x ≥1,5 mm2

n ≥ 2 E 90

(N)HXH-J FE180 PH30/E30 4x50 RM E 90

(N)HXH FE180 PH90/E90

(N)HXH-J FE180 PH90/E90 4x1,5 RE Cable mesh trays KDS/KDSO400H60. Consoles combined of assembling profiles

CWP/CWOP40H40/05 and threaded rods PG M10 fixed to ceiling by anchors

HKD M10x30 HILTI.

Loading 15kg.m-1. Consoles in spacing of 1500 mm.

Track No. 5.

E 90 n x ≥1,5 mm2 n ≥ 2 E 90

(N)HXH-J FE180 PH90/E90 4x50 RM E 90

(N)HXH FE180 PH30/E30

(N)HXH-J FE180 PH30/E30 4x1,5 RE E 90 n x ≥1,5 mm2

n ≥ 2 E 90

(N)HXH-J FE180 PH30/E30 4x50 RM E 90

(N)HXH FE180 PH90/E90

(N)HXH-J FE180 PH90/E90 4x1,5 RE Cable trays KBJ400H60. Consoles combined of assembling profiles

CWP/CWOP40H40/05 and threaded rods PG M10 fixed to

ceiling by anchors HKD M10x30 HILTI.

Loading 15kg.m-1. Consoles in spacing of 1500 mm.

Track No. 6.

E 30 n x ≥1,5 mm2 n ≥ 2 E 30

(N)HXH-J FE180 PH90/E90 4x50 RM E 30

(N)HXH FE180 PH30/E30

(N)HXH-J FE180 PH30/E30 4x1,5 RE E 30 n x ≥1,5 mm2

n ≥ 2 E 30

(N)HXH-J FE180 PH30/E30 4x50 RM E 90

(8)

FIRES-JR-022-14-NURE

FIRES 149/S-28/03/2014-E Page: 7/10

Cable Type of tested cable, single cross-

sections and number of conductors Arrangement

Classification for type of tested cable

(by cross-sections and number of

conductors)

Classification for cable

(N)HXH FE180 PH90/E90

(N)HXH-J FE180 PH90/E90 4x1,5 RE

Cable trays KBJ400H60 covered by PKJ400 with connectors ZPD H60. Consoles combined of assembling profile CWP40H22/05 and threaded rods PG M8 fixed to

screw anchor HUS-I6 HILTI at ceiling.

Loading 20kg.m-1. Consoles in spacing of 1500 mm.

Track No. 7.

E 30

n x ≥1,5 mm2 n ≥ 2 E 30

(N)HXH-J FE180 PH90/E90 4x50 RM E 90

NHXH FE180 PH90/E90

NHXH-J FE180 PH90/E90 4x1,5 RE

Cable ladders DUP/DUOP400H60. Consoles combined of assembling profiles CWP40H22/05 and threaded rods

PG M10 fixed to screw anchor HUS-I6 HILTI at ceiling.

Loading 25kg.m-1. Consoles in spacing of 1500 mm.

Track No. 8.

E 90

n x ≥1,5 mm2 n ≥ 2 E 90

NHXH-J FE180 PH90/E90 4x50 RM E 90

(N)HXH FE180 PH90/E90

(N)HXH-J FE180 PH90/E90 4x1,5 RE

Cable trays KCJ/KCOJ400H60 covered by PKJ400 with connectors ZPD H60. Consoles combined of assembling profiles CWP40H22/05 and threaded rods

PG M10 fixed to screw anchor HUS-I6 HILTI at ceiling.

Loading 20kg.m-1. Consoles in spacing of 1500 mm.

Track No. 9.

E 30

n x ≥1,5 mm2 n ≥ 2 E 30

(N)HXH-J FE180 PH90/E90 4x50 RM E 90

(N)HXH FE180 PH90/E90

(N)HXH-J FE180 PH90/E90 4x1,5 RE

Cable trays KBL300H60 covered by PKJ300 with connectors ZPD H60. Consoles combined of assembling profile CWP40H22/04 and threaded rods PG M8 fixed to

screw anchor HUS-I6 HILTI at ceiling.

Loading 20kg.m-1. Consoles in spacing of 1500 mm.

Track No. 10.

E 90

n x ≥1,5 mm2 n ≥ 2 E 90

(N)HXH-J FE180 PH90/E90 4x50 RM E 90

(N)HXH FE180 PH90/E90

(N)HXH-J FE180 PH90/E90 4x1,5 RE

Cable trays KCL/KCOL300H60 covered by PKJ300 with connectors ZPD H60. Consoles combined of assembling profile CWP40H22/04 and threaded rods

PG M8 fixed to screw anchor HUS-I6 HILTI at ceiling.

Loading 20kg.m-1. Consoles in spacing of 1500 mm.

Track No. 11.

E 90

n x ≥1,5 mm2 n ≥ 2 E 90

(N)HXH-J FE180 PH90/E90 4x50 RM E 90

NHXH FE180 PH90/E90

NHXH-J FE180 PH90/E90 4x1,5 RE

Cable trays KGJ/KGOJ400H60.

Consoles combined of brackets WWS/WWSO400 fixed to supports CWP/CWOP40H40/1

and threaded rods PG M10.

Loading 20kg.m-1. Consoles fixed to wall in spacing

of 1500 mm.

Track No. 12.

E 90

n x ≥1,5 mm2 n ≥ 2 E 90

NHXH-J FE180 PH90/E90 4x50 RM E 90

NHXH FE180 PH90/E90

NHXH-J FE180 PH90/E90 4x1,5 RE Cable trays KCJ/KCOJ400H60.

Consoles combined of brackets WWS/WWSO400 fixed to supports CWP/CWOP40H40/1

and threaded rods PG M10.

Loading 20kg.m-1. Consoles fixed to wall in spacing

of 1500 mm.

Track No. 13.

E 90 n x ≥1,5 mm2 n ≥ 2 E 90

NHXH-J FE180 PH90/E90 4x50 RM E 90

(N)HXH FE180 PH90/E90

(N)HXH-J FE180 PH90/E90 4x1,5 RE E 90 n x ≥1,5 mm2

n ≥ 2 E 90

(N)HXH-J FE180 PH90/E90 4x50 RM E 90

(9)

Cable Type of tested cable, single cross-

sections and number of conductors Arrangement

Classification for type of tested cable

(by cross-sections and number of

conductors)

Classification for cable

(N)HXH FE180 PH90/E90

(N)HXH-J FE180 PH90/E90 4x1,5 RE

Cable ladders DUD/DUOD400H60. Consoles

combined of brackets WMC/WMCO400 fixed to supports

CWP/CWOP40H40/1 and threaded rods PG M10.

Loading 20kg.m-1. Consoles fixed to wall in spacing

of 1500 mm.

Track No. 14.

E 30

n x ≥1,5 mm2 n ≥ 2 E 30

(N)HXH-J FE180 PH90/E90 4x50 RM E 90

(N)HXH FE180 PH30/E30

(N)HXH-J FE180 PH30/E30 4x1,5 RE

Cable ladders DUD/DUOD400H60. Consoles

combined of brackets WWS/WWSO400 fixed to supports CWP/CWOP40H40/1

and threaded rods PG M10.

Loading 20kg.m-1. Consoles fixed to wall in spacing

of 1500 mm.

Track No. 15.

E 90

Without classification

(N)HXH-J FE180 PH30/E30 4x50 RM Without

classification

HDGs FE180 PH90/E30-E90

HDGs FE180 PH90/E30-E90 2x1 mm2

Track is made of double cable clips X-DFB fixed to steel sheet 1,0 mm thick on wall by steel self-drilling screws (S-MD 01Z) in

spacing of 600 mm.

Track No. 16.

E 90

n x ≥ 1,0 mm2 n ≥ 2 E 90

HTKSH

PH90 HTKSH PH90 1x2x0,8 mm

Track is made of single cable clips X-FB/FB fixed to steel sheet 1,0 mm thick on wall by steel self-drilling screws (S-MD 01Z) in

spacing of 600 mm.

Track No. 16.

E 90

n x 2 x ≥ 0,8 mm n ≥ 1 E 90 HTKSHekw

PH90 HTKSHekw PH90 1x2x0,8 mm E 90

n x 2 x ≥ 0,8 mm n ≥ 1 E 90 HDGs

FE180 PH90/E30-E90

HDGs FE180 PH90/E30-E90 2x1 mm2 E 90

n x ≥ 1,0 mm2 n ≥ 2 E 90

HDGs FE180 PH90/E30-E90

HDGs FE180 PH90/E30-E90 2x1 mm2

Track is made of double cable clips X-DFB fixed to steel sheet 1,5 mm thick on wall by steel self-drilling screws (S-MS 01Z) in

spacing of 600 mm.

Track No. 17.

E 90

n x ≥ 1,0 mm2 n ≥ 2 E 90

HTKSH

PH90 HTKSH PH90 1x2x0,8 mm

Track is made of single cable clips X-FB/FB fixed to steel sheet 1,5 mm thick on wall by steel self-drilling screws (S-MS 01Z) in

spacing of 600 mm.

Track No. 17.

E 90

n x 2 x ≥ 0,8 mm n ≥ 1 E 90 HTKSHekw

PH90 HTKSHekw PH90 1x2x0,8 mm E 90

n x 2 x ≥ 0,8 mm n ≥ 1 E 90 HDGs

FE180 PH90/E30-E90

HDGs FE180 PH90/E30-E90 2x1 mm2 E 90

n x ≥ 1,0 mm2 n ≥ 2 E 90

NHXH FE180 PH90/E90

NHXH-J FE180 PH90/E90 4x1,5 RE

Track is made of cable junction boxes PMO1 with plastic push-in cable glands with locknuts. Cables

are fixed to ceiling by single cable clips (UDF) by screw anchors (HUS-P) in spacing of 600 mm.

Track No. 18.

E 90

n x ≥1,5 – 10 mm2 n ≥ 2 E 90

NHXH-J FE180 PH90/E90 4x6 RE E 90

NHXH FE180 PH90/E90

NHXH-J FE180 PH90/E90 4x1,5 RE

Track is made of cable junction boxes PMO2 with plastic push-in cable glands with locknuts. Cables

are fixed to ceiling by single cable clips (UDF) by screw anchors (HUS-P) in spacing of 600 mm.

Track No. 19.

E 90

n x ≥1,5 – 6 mm2 n ≥ 2 E 90

NHXH-J FE180 PH90/E90 4x10 RE E 90

(10)

FIRES-JR-022-14-NURE

FIRES 149/S-28/03/2014-E Page: 9/10

Cable Type of tested cable, single cross-

sections and number of conductors Arrangement

Classification for type of tested cable

(by cross-sections and number of

conductors)

Classification for cable

HTKSH

PH90 HTKSH PH90 1x2x0,8 mm

Track is made of double cable clips (X-DFB MX) shot by powder actuated fastening tool DX 460 to ceiling by nails (X-U) in spacing of

600 mm.

Track No. 20.

E 90

n x 2 x ≥ 0,8 mm n ≥ 1 E 90 HTKSHekw

PH90 HTKSHekw PH90 1x2x0,8 mm E 90

n x 2 x ≥ 0,8 mm n ≥ 1 E 90 HDGs

FE180 PH90/E30-E90

HDGs FE180 PH90/E30-E90 2x1 mm2 E 60

n x ≥ 1,0 mm2 n ≥ 2 E 60 HTKSH

PH90 HTKSH PH90 1x2x0,8 mm Track is made of single cable clips (X-FB MX) shot by gas actuated

fastening tool GX 120-ME and nails (X-GHP) / by powder actuated fastening tool DX 460

and nails (X-U) to ceiling in spacing of 600 mm.

Track No. 21.

E 90

n x 2 x ≥ 0,8 mm n ≥ 1 E 90 HTKSHekw

PH90 HTKSHekw PH90 1x2x0,8 mm E 90

n x 2 x ≥ 0,8 mm n ≥ 1 E 90 HDGs

FE180 PH90/E30-E90

HDGs FE180 PH90/E30-E90 2x1 mm2 E 90

n x ≥ 1,0 mm2 n ≥ 2 E 90 HTKSH

PH90 HTKSH PH90 1x2x0,8 mm Track is made of double cable clips (X-DFB C27) fixed to ceiling

in spacing of 600 mm.

Track No. 22.

E 90

n x 2 x ≥ 0,8 mm n ≥ 1 E 90 HDGs

FE180 PH90/E30-E90

HDGs FE180 PH90/E30-E90 2x1 mm2 E 90

n x ≥ 1,0 mm2 n ≥ 2 E 90 HTKSH

PH90 HTKSH PH90 1x2x0,8 mm Track is made of double cable clips (X-DFB MX) shot by powder actuated fastening tool DX 460 to steel profile (IPE80) on ceiling by

nails (X – U) in spacing of 600 mm.

Track No. 23.

E 90

n x 2 x ≥ 0,8 mm n ≥ 1 E 90 HTKSHekw

PH90 HTKSHekw PH90 1x2x0,8 mm E 90

n x 2 x ≥ 0,8 mm n ≥ 1 E 90 HDGs

FE180 PH90/E30-E90

HDGs FE180 PH90/E30-E90 2x1 mm2 E 90

n x ≥ 1,0 mm2 n ≥ 2 E 90

HTKSH

PH90 HTKSH PH90 1x2x0,8 mm

Track is made of single cable clips (X-FB MX) shot by powder actuated fastening tool DX 460 to steel profile (IPE80) on ceiling by

nails (X – U) in spacing of 600 mm.

Track No. 23.

E 90

n x 2 x ≥ 0,8 mm n ≥ 1 E 90

(11)

4.3 FIELD OF APPLICATION

This classification is valid for the following end use applications:

§ throughout the period during which circuit integrity is to be maintained, neighbouring building components shall not have a negative effect on circuit integrity;

§ although testing is only carried out on cables arranged horizontally, test results also apply to cables arranged either diagonally or vertically (e.g. risers), as long as the cable system is supported in transitional areas (i.e. where it switches from a horizontal to a vertical arrangement) in such a manner that the cables will not slip or kink at corners;

§ test results of function in fire test of cables tested at standard supporting construction are also applicable for tested standard supporting construction of other producers;

§ test results of function in fire test of cables tested at standard supporting construction are also applicable for cables of other producers tested at standard supporting construction;

§ maximal length of increasing routing shall be 3500 mm with consistent horizontal placing of cable with minimal length of 300 mm (apart from cable bending) and with maximal spacing of clips of 300 mm, eventually the cables are stabilized by cable transmissions at floor or ceiling with particular fire resistance;

§ for vertical systems, the test results obtained for cables mounted singly on the ceiling using single clips apply. Brackets of proven suitability may also be used, as long as their spacing is equal to that of the single clips tested;

§ results of testing single cables on the ceiling apply also to cables mounted horizontally on walls;

§ results of testing bunched cables on a ladder or tray also apply to support construction attached to a wall. However, such constructions required proof of suitability by means of a test certificate or other document issued by an accredited testing laboratory.

5. LIMITATIONS

This classification document does not represent type approval or certification of the product.

The classification is valid until 12. 05. 2019 provided that the product, field of application and standards and regulations are not changed.

Approved: Signed:

Ing. Štefan Rástocký Bc. Dávid Šubert

leader of the testing laboratory technician of the testing laboratory

Cytaty

Powiązane dokumenty

Product comprise of cable bearing system BAKS – cable trays, cable mesh trays, cable clips KSA and UDF and fireboxes PMO 1 and PMO2 with accessories and

The element, Cable bearing system BAKS – cable trays, cable ladders, cable clips and clamps with accessories (consoles, brackets, supports, hangers, etc.) and

Product comprise of cable bearing system BAKS – cable trays, cable mesh trays, cable clips and clamps with accessories (consoles, brackets, assembling profiles, etc.) and

Product comprise of cable bearing system of company BAKS Kazimierz Sielski – cable trays, mesh trays, ladders, cable clamps with accessories (consoles, brackets, supports,

The element, Cable bearing system BAKS – cable trays, cable ladders, cable clips and clamps with accessories (consoles, brackets, supports, hangers, etc.) and

The element comprise of cable bearing system BAKS – cable trays KCOP, cable ladders DGOP, ceiling ledges SDOP with clips UKO1 and clips UDF with accessories (consoles, booms,

The element comprise of cable bearing system BAKS – cable trays KCOD and KCOJ, cable ladders DGOD, cable holders OZO, ceiling ledges SDOC with clips UKO1,

The element comprise of cable bearing system BAKS – cable trays KCOP, cable mesh trays KDSO, cable ladders DGOP, DUOP, cable clips UDF, UEF, 1015 and accessories (consoles