FUNCTION IN FIRE EXPERT JUDGEMENT REPORT WITH CLASSIFICATION FIRES-JR-032-13-NURE

Cable bearing system and fireboxes BAKS with cables business Zakłady Kablowe BITNER Celina Bitner

This is an electronic version of a classification report which was made as a copy of classification report officially issued in a paper form. The electronic version of a classification report shall be used only for informative purpose. Any information listed in this classification report is the property of the sponsor and shall not be used or published without written permission. Contents of this file may only be modified by the editor i.e.

FIRES, s.r.o., Batizovce. Sponsor is allowed to publish this classification report in parts only with written permission of the editor.

FIRES 004/S2-20/12/2012-E-el

(2)

FUNCTION IN FIRE EXPERT JUDGEMENT REPORT WITH CLASSIFICATION

FIRES-JR-032-13-NURE

FIRES 149/S-27/10/2009-E FIRES, s.r.o., Osloboditeľov 282, 059 35 Batizovce, Slovak Republic tel. 00421 52 775 22 98, fax. 00421 52 788 14 12, www.fires.sk

Name of the product: Cable bearing system and fireboxes BAKS with cables business Zakłady Kablowe BITNER Celina Bitner

Sponsor: BAKS Kazimierz Sielski, ul. Jagodne 5, 05 - 480 Karczew, Poland - producer of construction

Zakłady Kablowe BITNER Celina Bitner, ul. Friedleina 3/3, 30-009 Kraków, Poland – producer of cables

Prepared by: FIRES, s.r.o.

Approved Body No. SK01 Osloboditeľov 282

059 35 Batizovce Slovak Republic

Task No.: PR-13-0066 Date of issue: 28. 02. 2013

Reports: 5

Copy No.: 2

Distribution list:

Copy No. 1 FIRES, s. r. o., Osloboditeľov 282, 059 35 Batizovce, Slovak Republic (electronic version)

Copy No. 2 BAKS Kazimierz Sielski, ul. Jagodne 5, 05 - 480 Karczew, Poland (electronic version)

Copy No. 3 Zakłady Kablowe BITNER Celina Bitner, ul. Friedleina 3/3, 30-009 Kraków, Poland (electronic version)

Copy No. 4 BAKS Kazimierz Sielski, ul. Jagodne 5, 05-480 Karczew, Poland

Copy No. 5 Zakłady Kablowe BITNER Celina Bitner, ul. Friedleina 3/3, 30-009 Kraków, Poland

This expert judgement report consists of 9 pages and may only be used or reproduced in its entirety.

(3)

FIRES-JR-032-13-NURE

FIRES 149/S-27/10/2009-E Page: 2/9

1. INTRODUCTION

This expert judgement report with classification defines the function in fire classification assigned to element „ Cable bearing system and fireboxes BAKS with cables business Zakłady Kablowe BITNER Celina Bitner” in accordance with the classes given in STN 92 0205:2012.

This test was carried out according to standard STN 92 0205: 2012 and meets requirements of DIN 4102-12: 1998-11. Basic deviation in process and carrying out of test between these standards is in measuring and in control of temperature in the test furnace. According to STN 92 0205: 2012, plate thermometers according to EN 1363-1: 1999 are used. According to DIN 4102-12: 1998-11, common thermocouples of construction which was used for this measurement till issue of EN 1363-1:1999 are used. Measurement by plate thermometers acc. to EN 1363-1: 1999 can be considered as stricter method of temperature control in test furnace in compare with thermocouples used till issue of EN 1363-1: 1999.

Therefore, it is possible to use results of test according to STN 92 025: 2012 for classification of tested cables according to DIN 4102-12: 1998-11, but not conversely.

This expert judgement report defines field of application which is outside the field of direct application according test standard or outside the field of extended application according to relevant extended application standard. This expert judgement expresses the opinion of the FIRES and is based on the experience or internal rules of FIRES.

2. DETAILS OF CLASSIFIED PRODUCT 2.1 GENERAL

The product, Cable bearing system and fireboxes BAKS with cables business Zakłady Kablowe BITNER Celina Bitner, is defined as a cable bearing system for power and communication halogen free cables with circuit integrity maintenance.

2.2 PRODUCT DESCRIPTION

Product comprise of cable bearing system BAKS – cable trays, cable mesh trays, cable clips KSA and UDF and fireboxes PMO 1 and PMO2 with accessories and power and communication halogen free cables of Zakłady Kablowe BITNER Celina Bitner company.

Cable trays

Cable trays type KGJ/KGOJ H60 are made from steel sheet thickness 0,9 mm. Trays are jointed together by screws type SGN M6x12.

Cable trays type KGL/KGOL H60 are made from steel sheet thickness 0,7 mm. Trays are jointed together by screws type SGN M6x12.

Trays are used as bearing system for the cables.

Cable mesh trays

Cable trays type KDS/KDSO H60 are made from steel wire ∅ 4,5 mm. Mesh trays are jointed together by junctions type USS/USSO.

Mesh trays are used as bearing system for the cables.

Consoles

Consoles type WPC/WPCO are made from steel sheet thickness 2 mm and 6 mm.

Consoles are used to gripping brackets WMC/WMCO.

Brackets

Brackets type WMC/WMCO are made from steel sheet thickness 2,5 mm and 5 mm.

Brackets are used to gripping trays or ladders to ceiling or to wall.

Supports

Supports type CWP/CWOP are made from steel sheet thickness 1,5 mm.

Supports are used to gripping trays or ladders to the ceiling with threaded bar.

(4)

Holders

Holders type UPW/UPWO are made from steel sheet thickness 2 mm. Holders are used to gripping threaded rod to brackets WMC/WMCO. Holders USV/USOV are made from steel sheet thickness 5 mm.

Holders are used to gripping threaded rod to the ceiling.

Cable clips

Clips KSA are made from steel sheet thickness 1,2 mm.

Clips UDF are made from steel sheet thickness from 1,2 to 2,0 mm.

Clips are used to gripping cables to ceiling or to wall.

Trapezoidal hangers

Trapezoidal hangers WT/WTO120 are made from steel sheet thickness 2,0 mm.

Hangers are used to fixing cable tracks to trapezoidal steel sheets.

Fireboxes

Fireboxes PMO1 and PMO2 are made of steel sheets with thickness 1,0 mm and bottom part 1,25 mm.

Fireboxes can be used for cross connection of cable – number of cables and conductors according to type. It can be used inside the buildings on the ceiling or wall.

Cables

Used cables by test: NHXH 4x1,5RE FE180/E90 0,6/1kV (6x) NHXCH 4x1,5RE/1,5 FE180/E90 0,6/1kV (4x)

NHXH 4x50RM FE180/E90 0,6/1kV (6x)

NHXCH 4x50RM/25 FE180/E90 0,6/1kV (4x) (N)HXH 4x1,5RE FE180/E90 0,6/1kV (14x) (N)HXCH 4x1,5RE/1,5 FE180/E90 0,6/1kV (10x) (N)HXH 4x50RM FE180/E90 0,6/1kV (10x) (N)HXCH 4x50RM/25 FE180/E90 0,6/1kV (6x)

(N)HXH 4x6RE FE180/E90 0,6/1kV (2x)

HTKSH 1x2x0,8 FE180/PH90/E90 225V (14x) HTKSHekw 1x2x0,8 FE180/PH90/E90 225V (8x) HDGs 2x1,0 FE180/PH90/E90 300/500V (12x) HDGsekwf 2x1,0 FE180/PH90/E90 300/500V (10x) BiTflame AS 1x2x0,8 FE180/PH90/E90 225V (2x) BiTflame AS(St) 1x2x0,8 FE180/PH90/E90 225V (2x) BiTflame S 2x1,0 FE180/PH90/E90 300/500V (2x) BiTflame S(St) 2x1,0 FE180/PH90/E90 300/500V (2x)

JE-H(St)H 2x2x0,8 FE180/E90 (2x)

The length of cables was 4,5 m and 3 m from that was exposed to fire.

Power and communication halogen free cables were fixed in the ladders and mesh trays by steel clips in the points of allowed bending radius.

Power and communication halogen free cables were not fixed in the trays in the points of allowed bending radius.

More detailed information about construction of specimen is shown in the drawings which form an integral part of test report. Drawings were delivered by sponsor.

3. TEST REPORTS AND EXTENDED APPLICATION REPORTS IN SUPPORT OF CLASSIFICATION 3.1 TEST REPORTS AND EXTENDED APPLICATION REPORTS

No. Name of laboratory Name of sponsor Test report No. Date of the test Test method [1] FIRES, s.r.o.,

Batizovce, SR

BAKS Kazimierz Sielski Karczew,Poland

FIRES-FR-

030-13-AUNE 25. 02. 2013

STN 92 0205 ZP-27/2008 DIN 4102-12

(5)

FIRES-JR-032-13-NURE

FIRES 149/S-27/10/2009-E Page: 4/9

3.2 TEST RESULTS Specimen

No. Cables Track

No.

Time to first failure / interruption of conductor

1 cable (N)HXH 4x50RM FE180/E90 0,6/1kV

11

53 minutes

2 cable (N)HXH 4x50RM FE180/E90 0,6/1kV 90 minutes no failure / interruption 3 cable (N)HXCH 4x1,5RE/1,5 FE180/E90 0,6/1kV 90 minutes no failure / interruption 4 cable (N)HXCH 4x1,5RE/1,5 FE180/E90 0,6/1kV 84 minutes

5 cable (N)HXH 4x1,5RE FE180/E90 0,6/1kV 90 minutes no failure / interruption 6 cable (N)HXH 4x1,5RE FE180/E90 0,6/1kV 90 minutes no failure / interruption 7 cable (N)HXCH 4x50RM/25 FE180/E90 0,6/1kV

10

90 minutes no failure / interruption 8 cable (N)HXCH 4x50RM/25 FE180/E90 0,6/1kV 90 minutes no failure / interruption 9 cable (N)HXCH 4x1,5RE/1,5 FE180/E90 0,6/1kV 61 minutes

10 cable (N)HXCH 4x1,5RE/1,5 FE180/E90 0,6/1kV 60 minutes 11 cable (N)HXH 4x1,5RE FE180/E90 0,6/1kV

9

90 minutes no failure / interruption 12 cable (N)HXH 4x1,5RE FE180/E90 0,6/1kV 90 minutes no failure / interruption 13 cable (N)HXH 4x50RM FE180/E90 0,6/1kV 90 minutes no failure / interruption 14 cable (N)HXH 4x50RM FE180/E90 0,6/1kV 90 minutes no failure / interruption 15 cable (N)HXH 4x1,5RE FE180/E90 0,6/1kV + fireboxes PMO2 13 90 minutes no failure / interruption 16 cable NHXCH 4x50RM/25 FE180/E90 0,6/1kV

8

90 minutes no failure / interruption 17 cable NHXCH 4x50RM/25 FE180/E90 0,6/1kV 90 minutes no failure / interruption 18 cable NHXCH 4x1,5RE/1,5 FE180/E90 0,6/1kV 90 minutes no failure / interruption 19 cable NHXCH 4x1,5RE/1,5 FE180/E90 0,6/1kV 90 minutes no failure / interruption 20 cable NHXH 4x50RM FE180/E90 0,6/1kV

7

90 minutes no failure / interruption 21 cable NHXH 4x50RM FE180/E90 0,6/1kV 90 minutes no failure / interruption 22 cable NHXH 4x1,5RE FE180/E90 0,6/1kV 90 minutes no failure / interruption 23 cable NHXH 4x1,5RE FE180/E90 0,6/1kV 90 minutes no failure / interruption 24 cable NHXH 4x50RM FE180/E90 0,6/1kV

6

90 minutes no failure / interruption 25 cable NHXH 4x50RM FE180/E90 0,6/1kV 90 minutes no failure / interruption

26 cable NHXH 4x1,5RE FE180/E90 0,6/1kV 88 minutes

27 cable NHXH 4x1,5RE FE180/E90 0,6/1kV 90 minutes no failure / interruption 28 cable (N)HXH 4x50RM FE180/E90 0,6/1kV

5

31 minutes

29 cable (N)HXH 4x50RM FE180/E90 0,6/1kV 90 minutes no failure / interruption 30 cable (N)HXH 4x1,5RE FE180/E90 0,6/1kV 84 minutes

31 cable (N)HXH 4x1,5RE FE180/E90 0,6/1kV 89 minutes 32 cable (N)HXH 4x1,5RE FE180/E90 0,6/1kV

14

90 minutes no failure / interruption 33 cable (N)HXH 4x1,5RE FE180/E90 0,6/1kV 90 minutes no failure / interruption 34 cable (N)HXCH 4x1,5RE/1,5 FE180/E90 0,6/1kV 50 minutes

35 cable (N)HXCH 4x1,5RE/1,5 FE180/E90 0,6/1kV 69 minutes

36 cable (N)HXH 4x6RE FE180/E90 0,6/1kV + fireboxes PMO2 13 90 minutes no failure / interruption 37 cable (N)HXH 4x6RE FE180/E90 0,6/1kV + fireboxes PMO1

12 90 minutes no failure / interruption 38 cable (N)HXH 4x1,5RE FE180/E90 0,6/1kV+ fireboxes PMO1 90 minutes no failure / interruption 39 2 cables NHXCH 4x50RM/25 FE180/E90 0,6/1kV

4 90 minutes no failure / interruption 40 2 cables NHXCH 4x1,5RE/1,5 FE180/E90 0,6/1kV 90 minutes no failure / interruption 41 2 cables NHXH 4x50RM FE180/E90 0,6/1kV

3 90 minutes no failure / interruption 42 2 cables NHXH 4x1,5RE FE180/E90 0,6/1kV 90 minutes no failure / interruption 43 2 cables (N)HXCH 4x50RM/25 FE180/E90 0,6/1kV

2 90 minutes no failure / interruption 44 2 cables (N)HXCH 4x1,5RE/1,5 FE180/E90 0,6/1kV 67 minutes

(6)

Specimen

No. Cables Track

No.

Time to first failure / interruption of conductor

45 2 cables (N)HXH 4x50RM FE180/E90 0,6/1kV

1 90 minutes no failure / interruption 46 2 cables (N)HXH 4x1,5RE FE180/E90 0,6/1kV 90 minutes no failure / interruption 47 2 cables (N)HXCH 4x50RM/25 FE180/E90 0,6/1kV

15

85 minutes 48 2 cables (N)HXH 4x50RM FE180/E90 0,6/1kV 63 minutes 49 2 cables (N)HXCH 4x1,5RE/1,5 FE180/E90 0,6/1kV 68 minutes

50 2 cables (N)HXH 4x1,5RE FE180/E90 0,6/1kV 90 minutes no failure / interruption 52A 2 cables HTKSHekw 1x2x0,8 FE180/PH90/E90 225V

11 73 minutes

52B 2 cables HDGsekwf 2x1,0 FE180/PH90/E90 300/500V 90 minutes no failure / interruption 53A 2 cables BiTflame S(St) 2x1,0 FE180/PH90/E90 300/500V

10 90 minutes no failure / interruption 53B 2 cables HDGsekwf 2x1,0 FE180/PH90/E90 300/500V 90 minutes no failure / interruption 54A 2 cables BiTflame S 2x1,0 FE180/PH90/E90 300/500V

9 90 minutes no failure / interruption 54B 2 cables HDGs 2x1,0 FE180/PH90/E90 300/500V 90 minutes no failure / interruption

55 cable JE-H(St)H 2x2x0,8 FE180/E90 225V + fireboxes PMO2

13 90 minutes no failure / interruption 56 cable HTKSH 1x2x0,8 FE180/E90 225V + fireboxes PMO2 90 minutes no failure / interruption 57 2 cables HTKSHekw 1x2x0,8 FE180/PH90/E90 225V 8 77 minutes

58 2 cables HTKSH 1x2x0,8 FE180/PH90/E90 225V 7 51 minutes 59A 2 cables HDGs 2x1,0 FE180/PH90/E90 300/500V - test

16 90 minutes no failure / interruption 59B 2 cables HTKSH 1x2x0,8 FE180/PH90/E90 225V - test 6 minutes

60A 2 cables HTKSHekw 1x2x0,8 FE180/PH90/E90 225V

6 90 minutes no failure / interruption 60B 2 cables HTKSH 1x2x0,8 FE180/PH90/E90 225V 90 minutes no failure / interruption 61A 2 cables HDGsekwf 2x1,0 FE180/PH90/E90 300/500V

5 90 minutes no failure / interruption 61B 2 cables HDGs 2x1,0 FE180/PH90/E90 300/500V 57 minutes

62 2 cables HDGsekwf 2x1,0 FE180/PH90/E90 300/500V

14

36 minutes

63 2 cables HTKSH 1x2x0,8 FE180/PH90/E90 225V 90 minutes no failure / interruption 64 2 cables HDGs 2x1,0 FE180/PH90/E90 300/500V 90 minutes no failure / interruption 65 2 cables BiTflame AS(St) 1x2x0,8 FE180/PH90/E90 225V

4 73 minutes 66 2 cables HTKSHekw 1x2x0,8 FE180/PH90/E90 225V 88 minutes 67 2 cables BiTflame AS 1x2x0,8 FE180/PH90/E90 225V

3 90 minutes no failure / interruption 68 2 cables HTKSH 1x2x0,8 FE180/PH90/E90 225V 41 minutes

69 2 cables HDGsekwf 2x1,0 FE180/PH90/E90 300/500V 2 68 minutes

70 2 cables HDGs 2x1,0 FE180/PH90/E90 300/500V 1 90 minutes no failure / interruption 71 cable JE-H(St)H 2x2x0,8 FE180/E90 225V + fireboxes PMO1

12 90 minutes no failure / interruption 72 cable HTKSH 1x2x0,8 FE180/E90 225V + fireboxes PMO1 90 minutes no failure / interruption 73 2 cables HDGs 2x1,0 FE180/PH90/E90 300/500V

15 90 minutes no failure / interruption 74 2 cables HTKSH 1x2x0,8 FE180/PH90/E90 225V 90 minutes no failure / interruption

The fire test was discontinued in 94th minute at the request of test sponsor.

Specimens S1 – S50 were tested by three-phase voltage supply 3 x 230/400V with bulbs 240V / 60 W.

Specimens S52 – S74 were tested by one-phase voltage supply 1 x 110V with LED diodes 3V /0,03W.

Circuit breakers with rating 3 A were used.

(7)

FIRES-JR-032-13-NURE

FIRES 149/S-27/10/2009-E Page: 6/9

4. CLASSIFICATION AND FIELD OF APPLICATION 4.1 REFERENCE OF CLASSIFICATION

This classification has been carried out in accordance with clause 3.2 of DIN 4102 – 12:1998-11.

4.2 CLASSIFICATION ACCORDING TO DIN 4102-12

The product, Cable bearing system and fireboxes BAKS with cables business Zakłady Kablowe BITNER Celina Bitner is classified according to the following combinations of performance parameters and classes as appropriate.

Cable Type of tested cable, single cross-

sections and number of conductors Arrangement

Classification for type of tested cable

(by cross-sections and number of

conductors)

Classification for cable

(N)HXH FE180/E90

0,6/1kV

(N)HXH 4x1,5RE FE180/E90 0,6/1kV

Cable trays KGL/KGOL 300H60/B-300.

Consoles WPC/WPCO1000 and brackets WMC/WMCO400 with threaded rods PG M10 to holder

USV/USOV.

Loading 20 kg.m-1. Consoles in spacing of 1500 mm.

Track No. 1.

E 90 n x ≥1,5 mm2 n ≥ 2 E 90

(N)HXH 4x50RM FE180/E90 0,6/1kV E 90

HDGs FE180 PH90/E90

HDGs 2x1,0 FE180/PH90/E90 300/500V E 90

n x ≥ 1,0 mm n ≥ 2 E 90

(N)HXCH FE180/E90

0,6/1kV

(N)HXCH 4x1,5RE/1,5 FE180/E90 0,6/1kV

Cable trays KGL/KGOL 300H60/B-300.

Consoles WPC/WPCO1000 and brackets WMC/WMCO400 with threaded rods PG M10 to holder

USV/USOV.

Loading 20 kg.m-1. Consoles in spacing of 1500 mm.

Track No. 2.

E 60 n x ≥1,5 mm2 n ≥ 2 E 60

(N)HXCH 4x50RM/25 FE180/E90 0,6/1kV E 90

HDGsekwf FE180 PH90/E90

HDGsekwf 2x1,0 FE180/PH90/E90

300/500V E 60

n x ≥ 1,0 mm n ≥ 2 E 60

NHXH FE180/E90

0,6/1kV

NHXH 4x1,5RE FE180/E90 0,6/1kV

Cable trays KGJ/KGOJ 400H60/B-400.

Consoles WPC/WPCO1000 and brackets WMC/WMCO400 with threaded rods PG M10 to holder

USV/USOV.

Loading 20 kg.m-1. Consoles in spacing of 1500 mm.

Track No. 3.

E 90 n x ≥1,5 mm2 n ≥ 2 E 90

NHXH 4x50RM FE180/E90 0,6/1kV E 90

HTKSH FE180 PH90/E90

HTKSH 1x2x0,8 FE180/PH90/E90 225V E 30

n x 2 x ≥ 0,8 mm n ≥ 1 E 30 BiTflame AS

FE180 PH90/E90

BiTflame AS 1x2x0,8

FE180/PH90/E90 225V E 90

n x 2 x ≥ 0,8 mm n ≥ 1 E 90

NHXCH FE180/E90

NHXCH 4x1,5RE/1,5 FE180/E90 0,6/1kV

Cable trays KGJ/KGOJ 400H60/B-400.

Consoles WPC/WPCO1000 and brackets WMC/WMCO400 with threaded rods PG M10 to holder

USV/USOV.

Loading 20 kg.m-1. Consoles in spacing of 1500 mm.

Track No. 4.

E 90 n x ≥1,5 mm2 n ≥ 2 E 90

NHXCH 4x50RM/25 FE180/E90 0,6/1kV E 90

HTKSHekw FE180 PH90/E90

HTKSHekw 1x2x0,8

FE180/PH90/E90 225V E 60

n x 2 x ≥ 0,8 mm n ≥ 1 E 60 BiTflame

AS(St) FE180 PH90/E90

BiTflame AS(St) 1x2x0,8

FE180/PH90/E90 225V E 60

n x 2 x ≥ 0,8 mm n ≥ 1 E 60

(N)HXH FE180/E90

0,6/1kV

(N)HXH 4x1,5RE FE180/E90 0,6/1kV Cable trays KDS/KDSO 400H60/B-400.

Consoles combined of two horizontal supports CWP/CWOP40H40/05 and two

threaded rods PG M10 fixed to trapezoidal steel sheet on ceiling

by hangers WT/WTO120.

Loading 20 kg.m-1. Consoles in spacing of 1500 mm.

Track No. 5.

E 60 n x ≥1,5 mm2 n ≥ 2 E 30

(N)HXH 4x50RM FE180/E90 0,6/1kV E 30

HDGsekwf FE180 PH90/E90

HDGsekwf 2x1,0 FE180/PH90/E90

300/500V E 90

n x ≥ 1,0 mm n ≥ 2 E 90 HDGs

FE180 PH90/E90

HDGs 2x1,0 FE180/PH90/E90 300/500V E 30

n x ≥ 1,0 mm n ≥ 2 E 30

(8)

Cable Type of tested cable, single cross-

sections and number of conductors Arrangement

Classification for type of tested cable

(by cross-sections and number of

conductors)

Classification for cable

NHXH FE180/E90

0,6/1kV

NHXH 4x1,5RE FE180/E90 0,6/1kV Cable trays KDS/KDSO 400H60/B-400.

Consoles combined of two horizontal supports CWP/CWOP40H40/05 and two

threaded rods PG M10 fixed to trapezoidal steel sheet on ceiling

by hangers WT/WTO120.

Loading 20 kg.m-1. Consoles in spacing of 1500 mm.

Track No. 6.

E 60 n x ≥1,5 mm2 n ≥ 2 E 60

NHXH 4x50RM FE180/E90 0,6/1kV E 90

HTKSH FE180 PH90/E90

HTKSH 1x2x0,8 FE180/PH90/E90 225V E 90

n x 2 x ≥ 0,8 mm n ≥ 1 E 90 HTKSHekw

FE180 PH90/E90

HTKSHekw 1x2x0,8

FE180/PH90/E90 225V E 90

n x 2 x ≥ 0,8 mm n ≥ 1 E 90

NHXH FE180/E90

0,6/1kV

NHXH 4x1,5RE FE180/E90 0,6/1kV

Cable trays KGL/KGOL 300H60/B-300.

Consoles combined of two horizontal supports CWP/CWOP40H40/05 and two

threaded rods PG M10 fixed to ceiling.

Loading 20 kg.m-1. Consoles in spacing of 1500 mm.

Track No. 7.

E 90 n x ≥1,5 mm2 n ≥ 2 E 90

NHXH 4x50RM FE180/E90 0,6/1kV E 90

HTKSH FE180 PH90/E90

HTKSH 1x2x0,8 FE180/PH90/E90 225V E 30

n x 2 x ≥ 0,8 mm n ≥ 1 E 30

NHXCH FE180/E90

NHXCH 4x1,5RE/1,5 FE180/E90 0,6/1kV

Cable trays KGL/KGOL 300H60/B-300.

Consoles combined of two horizontal supports CWP/CWOP40H40/05 and two

threaded rods PG M10 fixed to ceiling.

Loading 20 kg.m-1. Consoles in spacing of 1500 mm.

Track No. 8.

E 90 n x ≥1,5 mm2 n ≥ 2 E 90

NHXCH 4x50RM/25 FE180/E90 0,6/1kV E 90

HTKSHekw FE180 PH90/E90

HTKSHekw 1x2x0,8

FE180/PH90/E90 225V E 60

n x 2 x ≥ 0,8 mm n ≥ 1 E 60

(N)HXH FE180/E90

0,6/1kV

(N)HXH 4x1,5RE FE180/E90 0,6/1kV Cable trays KGJ/KGOJ 400H60/B-400.

Consoles combined of two horizontal supports CWP/CWOP40H40/05 and two

threaded rods PG M10 fixed to ceiling.

Loading 20 kg.m-1. Consoles in spacing of 1500 mm.

Track No. 9.

E 90 n x ≥1,5 mm2 n ≥ 2 E 90

(N)HXH 4x50RM FE180/E90 0,6/1kV E 90

HDGs FE180 PH90/E90

HDGs 2x1,0 FE180/PH90/E90 300/500V E 90

n x ≥ 1,0 mm n ≥ 2 E 90 BiTflame S

FE180 PH90/E90

BiTflame S 2x1,0 FE180/PH90/E90

300/500V E 90

n x ≥ 1,0 mm n ≥ 2 E 90 (N)HXCH

FE180/E90 0,6/1kV

(N)HXCH 4x1,5RE/1,5 FE180/E90 0,6/1kV

Cable trays KGJ/KGOJ 400H60/B-400.

Consoles combined of two horizontal supports CWP/CWOP40H40/05 and two

threaded rods PG M10 fixed to ceiling.

Loading 20 kg.m-1. Consoles in spacing of 1500 mm.

Track No. 10.

E 60 n x ≥1,5 mm2 n ≥ 2 E 60

(N)HXCH 4x50RM/25 FE180/E90 0,6/1kV E 90

HDGsekwf FE180 PH90/E90

HDGsekwf 2x1,0 FE180/PH90/E90

300/500V E 90

n x ≥ 1,0 mm n ≥ 2 E 90 BiTflame

S(St) FE180 PH90/E90

BiTflame S(St) 2x1,0 FE180/PH90/E90

300/500V E 90

n x ≥ 1,0 mm n ≥ 2 E 90

(N)HXH FE180/E90

0,6/1kV

(N)HXH 4x1,5RE FE180/E90 0,6/1kV

Cable clips UDF fixed to gypsum boards on side wall by dowels HM 5x37S in spacing of 600 mm.

Track No. 11.

E 90 n x ≥1,5 mm2 n ≥ 2 E 30

(N)HXH 4x50RM FE180/E90 0,6/1kV E 30

(N)HXCH FE180/E90

0,6/1kV

(N)HXCH 4x1,5RE/1,5 FE180/E90 0,6/1kV E 60 Without

classification HTKSHekw

FE180 PH90/E90

HTKSHekw 1x2x0,8

FE180/PH90/E90 225V E 60

n x 2 x ≥ 0,8 mm n ≥ 1 E 60 HDGsekwf

FE180 PH90/E90

HDGsekwf 2x1,0 FE180/PH90/E90

300/500V E 90

n x ≥ 1,0 mm n ≥ 2 E 90

(9)

FIRES-JR-032-13-NURE

FIRES 149/S-27/10/2009-E Page: 8/9

Cable Type of tested cable, single cross-

sections and number of conductors Arrangement

Classification for type of tested cable

(by cross-sections and number of

conductors)

Classification for cable

(N)HXH FE180/E90

0,6/1kV

(N)HXH 4x1,5RE FE180/E90 0,6/1kV

Cable clips KSA fixed to ceiling in spacing of 300 mm with

fireboxes PMO1.

Track No. 12.

E 90 n x 1,5 - 6 mm2 n ≥ 2 E 90

(N)HXH 4x6RE FE180/E90 0,6/1kV E 90

HTKSH FE180 PH90/E90

HTKSH 1x2x0,8 FE180/PH90/E90 225V E 90

n x 2 x ≥ 0,8 mm n ≥ 1 E 90 JE-H(St)H

FE180/E90 JE-H(St)H 2x2x0,8 FE180/E90 225V E 90

n x 2 x ≥ 0,8 mm n ≥ 2 E 90

(N)HXH FE180/E90

0,6/1kV

(N)HXH 4x1,5RE FE180/E90 0,6/1kV

Cable clips KSA fixed to ceiling in spacing of 300 mm with

fireboxes PMO2.

Track No. 13.

E 90 n x 1,5 - 6 mm2 n ≥ 2 E 90

(N)HXH 4x6RE FE180/E90 0,6/1kV E 90

HTKSH FE180 PH90/E90

HTKSH 1x2x0,8 FE180/PH90/E90 225V E 90

n x 2 x ≥ 0,8 mm n ≥ 1 E 90 JE-H(St)H

FE180/E90 JE-H(St)H 2x2x0,8 FE180/E90 225V E 90

n x 2 x ≥ 0,8 mm n ≥ 2 E 90 (N)HXCH

FE180/E90 0,6/1kV

(N)HXCH 4x1,5RE/1,5 FE180/E90 0,6/1kV

Cable trays

KDS/KDSO 60H60/B-60 fixed to threaded rods PG M6 by hangers

WKS/WKSO60. Threaded rods fixed to trapezoidal steel sheet on ceiling by hangers WT/WTO120 in

spacing of 1500 mm.

Loading 2 kg.m-1. Track No. 14.

E 30 Without

classification (N)HXH

FE180/E90 0,6/1kV

(N)HXH 4x1,5RE FE180/E90 0,6/1kV E 90 Without

classification HDGs

FE180 PH90/E90

HDGs 2x1,0 FE180/PH90/E90 300/500V E 90

n x ≥ 1,0 mm n ≥ 2 E 90 HTKSH

FE180 PH90/E90

HTKSH 1x2x0,8 FE180/PH90/E90 225V E 90

n x 2 x ≥ 0,8 mm n ≥ 1 E 90 HDGsekwf

FE180 PH90/E90

HDGsekwf 2x1,0 FE180/PH90/E90

300/500V E 30

n x ≥ 1,0 mm n ≥ 2 E 30 (N)HXH

FE180/E90 0,6/1kV

(N)HXH 4x1,5RE FE180/E90 0,6/1kV

Cable clips UDF fixed to side wall by dowels FMD 6x32 and 6x40 in

spacing of 600 mm.

Track No. 15.

E 90 n x ≥1,5 mm2 n ≥ 2 E 60

(N)HXH 4x50RM FE180/E90 0,6/1kV E 60

(N)HXCH FE180/E90

0,6/1kV

(N)HXCH 4x1,5RE/1,5 FE180/E90 0,6/1kV E 60 n x ≥1,5 mm2

n ≥ 2 E 60

(N)HXCH 4x50RM/25 FE180/E90 0,6/1kV E 60

HDGs FE180 PH90/E90

HDGs 2x1,0 FE180/PH90/E90 300/500V E 90

n x ≥ 1,0 mm n ≥ 2 E 90 HTKSH

FE180 PH90/E90

HTKSH 1x2x0,8 FE180/PH90/E90 225V E 90

n x 2 x ≥ 0,8 mm n ≥ 1 E 90 HDGs

FE180 PH90/E90

HDGs 2x1,0 FE180/PH90/E90 300/500V

Cable clips UDF fixed to ceiling in spacing of 600 mm.

Track No. 16.

E 90

n x ≥ 1,0 mm n ≥ 2 E 90 HTKSH

FE180 PH90/E90

HTKSH 1x2x0,8 FE180/PH90/E90 225V Without

classification

Without classification

(10)

4.3 FIELD OF APPLICATION

This classification is valid for the following end use applications:

§ throughout the period during which circuit integrity is to be maintained, neighbouring building components shall not have a negative effect on circuit integrity;

§ although testing is only carried out on cables arranged horizontally, test results also apply to cables arranged either diagonally or vertically (e.g. risers), as long as the cable system is supported in transitional areas (i.e. where it switches from a horizontal to a vertical arrangement) in such a manner that the cables will not slip or kink at corners;

§ if the standard support construction specified here is used for testing, test results also apply to other types of tested support construction;

§ maximal length of increasing routing shall be 3500 mm with consistent horizontal placing of cable with minimal length of 300 mm (apart from cable bending) and with maximal spacing of clips of 300 mm, eventually the cables are stabilized by cable transmissions at floor or ceiling with particular fire resistance;

§ for vertical systems, the test results obtained for cables mounted singly on the ceiling using single clips apply. Brackets of proven suitability may also be used, as long as their spacing is equal to that of the single clips tested;

§ results of testing single cables on the ceiling apply also to cables mounted horizontally on walls;

§ results of testing bunched cables on a ladder or tray also apply to support construction attached to a wall. However, such constructions required proof of suitability by means of a test certificate or other document issued by an accredited testing laboratory.

5. LIMITATIONS

Load-bearing construction elements for fixing of cable systems must be proved for at least the same fire resistance compare to classified function in fire of cable system.

This classification document does not represent type approval or certification of the product.

The classification is valid until 28. 02. 2018 provided that the product, field of application and standards and regulations are not changed.

Approved: Signed:

Ing. Štefan Rástocký Bc. Dávid Šubert

leader of the testing laboratory technician of the testing laboratory

Cytaty

Powiązane dokumenty

The element, Cable bearing system BAKS – cable trays, cable ladders, cable mesh trays, cable clips and hangers with accessories (consoles, brackets, supports, etc.) and power

Consoles combined of assembling profile CWP40H22/05 and threaded rods PG M8 fixed to.. ceiling by anchors HKD

Product comprise of cable bearing system BAKS – cable trays, cable ladders, cable mesh trays, cable clips and hangers with accessories (consoles, brackets,

Product comprise of cable bearing system BAKS – cable trays, cable ladders, cable clips with accessories (consoles, brackets, cable clamps, etc.) and power and communication

The element, Cable bearing system BAKS – cable trays, cable ladders, cable clips and clamps with accessories (consoles, brackets, supports, hangers, etc.) and

Product comprise of cable bearing system of company BAKS Kazimierz Sielski – cable trays, mesh trays, ladders, cable clamps with accessories (consoles, brackets, supports,

The element, Cable bearing system BAKS – cable trays, cable ladders, cable clips and clamps with accessories (consoles, brackets, supports, hangers, etc.) and

The element comprise of cable bearing system BAKS – cable trays KCOP, cable ladders DGOP, ceiling ledges SDOP with clips UKO1 and clips UDF with accessories (consoles, booms,