• Nie Znaleziono Wyników

Geaggregeerde capaciteitsplanning (summary)

N/A
N/A
Protected

Academic year: 2021

Share "Geaggregeerde capaciteitsplanning (summary)"

Copied!
1
0
0

Pełen tekst

(1)

Delft University of Technology

Faculty Mechanical, Maritime and Materials Engineering Transport Technology

D.M. Kann Geaggregeerde capaciteitsplanning

Literature survey, Report 92.3.LT.3071, Transport Engineering and Logistics.

Production planning can be defined as the process of determining the quantity of production, stocks and capacities which are needed to fulfill a certain market demand.

The planning can be divided in three levels: strategic planning, tactical planning and operational control.

At the tactical level planning and control of the production are established at an aggregate level. At this level a production process is divided in different production units. These are independent production departments with some production stages and resources. The activities of the production units are coordinated by the goods flow control, which considers the production units as black boxes with elementary production characteristics. These operational characteristics describe the behaviour of a production unit on the goods flow control level. Production orders for a specific production unit are released by goods flow control.

In order to design general methods of production planning and control it is recommendable to distinguish varous types of production processes. In this paper a division in three different production situations has been chosen: Make-to-Stock, Make-to-Order and Engineer-to-Order .

At goods flow control level the aggregate production planning can be controled on a capacity oriented manner. The remaining workload method can be used for the goods flow control. The hierarchical backlog control is a useful method of production planning in make-to-order production organizations, which is a mix between make-to-stock and engineer-to-order. In an engineer-to-order situation in which network structures are considered at an aggregate level, engineer work is difficult to plan. In this situation the planning can take place on a capacity oriented manner with work load norms. Reports on Transport Engineering and Logistics (in Dutch)

Cytaty

Powiązane dokumenty

The purpose of the course: an introduction to general principles of choice of law process, an overview of main European and international instruments (so called the Hague conventions,

В заключение можно сказать, что разработанная нами система ор­ ганизации обучения грамматике формирует интерес к ее изучению на основе обращения

Praca prezentuje propozycję analizy ryzyka środowiskowego, która może być wstępem do zarządzania ryzykiem podczas procesów poszukiwania i wydobycia gazu z łupków w

I. UZNANIE PRAWA WŁASNOŚCI DÓBR MATERIALNYCH W III wieku chrześcijaństwo wypracowało już trzy zróżnicowane opinie na temat prawa własności i prawa do użytkowania

Pierwsza sesja (7 V, czwartek, godz. 10.00) była poświęcona studiom porównawczym 

Wydaje się również, że we w nikliw ym i obszernym wstępie zabrakło miejsca dla dwóch kwestii: zasygnalizowano jedynie zmasowaną nagonkę na Kota jako historyka

The study was conducted for magnesium sulfate concentration in an interval of 0.2–2.0 mol/dm 3 and a sodium hydroxide interval of 0.4–0.5 mol/dm 3.. The precipitate was analyzed by

The process of optimising the parameters for the derived control rules of the nonlinear controllers given by (41) and (77) was performed using genetic algorithms, which have