FUNCTION IN FIRE EXPERT JUDGEMENT REPORT WITH CLASSIFICATION FIRES-JR-033-15-NURE

Cable bearing system BAKS with cables business Fabryka Kabli ELPAR

This is an electronic version of a classification report which was made as a copy of classification report officially issued in a paper form. The electronic version of a classification report shall be used only for informative purpose. Any information listed in this classification report is the property of the sponsor and shall not be used or published without written permission. Contents of this file may only be modified by the editor i.e.

FIRES, s.r.o., Batizovce. Sponsor is allowed to publish this classification report in parts only with written permission of the editor.

FIRES 004/S2-20/12/2012-E-el

(2)

FUNCTION IN FIRE EXPERT JUDGEMENT REPORT WITH CLASSIFICATION IN ACCORDANCE WITH DIN 4102-12:1998-11

FIRES-JR-033-15-NURE

FIRES 149/S-28/03/2014-E FIRES, s.r.o., Osloboditeľov 282, 059 35 Batizovce, Slovak Republic tel. 00421 52 775 22 98, fax. 00421 52 788 14 12, www.fires.sk

Name of the product: Cable bearing system BAKS with cables business Fabryka Kabli ELPAR Sponsor: BAKS Kazimierz Sielski

ul. Jagodne 5 05 - 480 Karczew Poland

Prepared by: FIRES, s.r.o.

Approved Body No. SK01 Osloboditeľov 282

059 35 Batizovce Slovak Republic

Task No.: PR-15-0063 Date of issue: 16. 04. 2015

Reports: 5

Copy No.: 2

Distribution list:

Copy No. 1 FIRES, s. r. o., Osloboditeľov 282, 059 35 Batizovce, Slovak Republic (electronic version)

Copy No. 2 BAKS Kazimierz Sielski, ul. Jagodne 5, 05 - 480 Karczew, Poland (electronic version)

Copy No. 3 Fabryka Kabli ELPAR Sp. z o.o., Ul. Laskowska 1, Parczew 21-200, Poland (electronic version)

Copy No. 4 BAKS Kazimierz Sielski, ul. Jagodne 5, 05-480 Karczew, Poland

Copy No. 5 Fabryka Kabli ELPAR Sp. z o.o., Ul. Laskowska 1, Parczew 21-200, Poland

(3)

1. INTRODUCTION

This expert judgement report with classification defines the function in fire classification assigned to element „Cable bearing system BAKS with cables business Fabryka Kabli ELPAR” in accordance with the classes given in DIN 4102-12:1998-11.

This test was carried out according to standard STN 92 0205 and meets requirements of DIN 4102-12: 1998-11. Basic deviation in process and carrying out of test between these standards is in measuring and in control of temperature in the test furnace. According to STN 92 0205, plate thermometers according to EN 1363-1 are used. According to DIN 4102-12: 1998-11, common thermocouples of construction which was used for this measurement till issue of EN 1363-1 are used.

Measurement by plate thermometers acc. to EN 1363-1 can be considered as stricter method of temperature control in test furnace in compare with thermocouples used till issue of EN 1363-1. Therefore, it is possible to use results of test according to STN 92 025 for classification of tested cables according to DIN 4102-12: 1998-11, but not conversely.

This expert judgement report defines field of application which is outside the field of direct application according test standard or outside the field of extended application according to relevant extended application standard. This expert judgement expresses the opinion of the FIRES and is based on the experience or internal rules of FIRES.

2. DETAILS OF CLASSIFIED PRODUCT 2.1 GENERAL

The element, Cable bearing system BAKS – cable trays, cable ladders, cable mesh trays, cable clips and hangers with accessories (consoles, brackets, supports, hangers, etc.) and power and communication halogen free cables of company Fabryka Kabli ELPAR with circuit integrity maintenance classes.

2.2 PRODUCT DESCRIPTION

Product comprise of cable bearing system BAKS – cable trays, cable ladders, cable mesh trays, cable clips and hangers with accessories (consoles, brackets, supports, hangers, etc.) and power and communication halogen free cables of company Fabryka Kabli ELPAR with circuit integrity maintenance classes.

Cable trays KCP/KCOP

Cable trays are made of steel sheet thickness 1,5 mm. Height of side wall is 60 mm and maximum tested width of cable tray is 300 mm. Trays are fixed together by junctions (LPP/LPOPH60, 2 pcs) with screws (SGK M6x12) on sides and by junction (BL/BLO300, 1 pc) with screws (SGK M6x12) on the bottom.

Maximum tested loading is 10kg.m

-1

. Tested tray is KCP/KCOP300H60.

Cable trays KGJ/KGOJ

Cable trays are made of steel sheet thickness 0,9 mm. Height of side wall is 60 mm and maximum tested width of cable tray is 400 mm. Trays are fixed together by nut bolts SGK M6x12. Maximum tested loading is 20kg.m

-1

. Tested tray is KGJ/KGOJ400H60.

Cable trays KGL/KGOL

Cable trays are made of steel sheet thickness 0,7 mm. Height of side wall is 60 mm and maximum tested width of cable tray is 300 mm. Trays are fixed together by nut bolts SGK M6x12. Maximum tested loading is 10kg.m

-1

. Tested tray is KGL/KGOL300H60.

Cable ladders DGOP

Cable ladders are made of steel sheet thickness 1,5 mm and spacing of transoms is 150 mm. Height of

side wall is 60 mm and maximum tested width of cable ladder is 400 mm. Cable ladders are fixed together

by junctions (LDC/LDOCH60, 2 pcs) and nut bolts (SGK M8x14) on sides. Maximum tested loading is

20kg.m

-1

. Tested ladder is DGOP400H60.

(4)

Cable ladders DUD

Cable ladders are made of steel sheet thickness 1,2 mm and spacing of transoms is 300 mm. Height of side wall is 60 mm and maximum tested width of cable ladder is 400 mm. Cable ladders are fixed together by junctions (LDC/LDOCH60, 2 pcs) and nut bolts (SGK M8x14) on sides. Maximum tested loading is 20kg.m

-1

. Tested ladder is DUD400H60.

Cable ladders DUP/DUOP

Cable ladders are made of steel sheet thickness 1,5 mm and spacing of transoms is 300 mm. Height of side wall is 60 mm and maximum tested width of cable ladder is 400 mm. Cable ladders are fixed together by junctions (LDC/LDOCH60, 2 pcs) and nut bolts (SGK M8x14) on sides. Maximum tested loading is 20kg.m

-1

. Tested ladder is DUP/DUOP400H60.

Cable mesh trays KDS/KDSO

Cable mesh trays are made of steel wire ∅ 4,0 mm and ∅ 4,5 mm. Height of side wall is 60 mm and maximum tested width of cable mesh tray is 400 mm. Mesh trays are fixed together by junctions (USS/USSO). Maximum tested loading is 20kg.m

-1

. Tested mesh trays is KDS/KDSO400H60.

Consoles WPCB

Consoles consist of base plate with dimensions (130 x 45 x 5) mm and support with dimensions (50 x 35 x 2) mm. Consoles are used for gripping of brackets to ceiling.

Brackets WWS/WWSO

Brackets are made from steel sheet thickness 2,0 mm. Tested brackets are WWS/WWSO300 and WWS/WWSO400. Brackets are used to gripping trays or ladders to ceiling or to wall.

Supports

Supports CWP40H22 with dimensions (40 x 22) mm are made of steel sheet thickness 1,5 mm.

Supports CWP/CWOP40H40 with dimensions (40 x 40) mm are made of steel sheet thickness 1,5 mm.

Supports are used for installation of cable trays or ladders Cable clips UDF

Cable clips are made of steel sheet thickness 1,2 mm or 2,0 mm. Clips are used for fixing of cables directly to wall or ceiling.

Assembling profiles SDOP

Profiles with dimensions (35 x 18) mm are made of steel sheet thickness 1,5 mm. Profiles are used for fixing of cables to wall or ceiling together with cable clamps UK1/UKO1.

Cables

Safety power cables are used in all locations where a special protection fire and fire damage in necessary from human life and equipment and where strict safety regulations have to meet and large emergency running time is necessary. They may be used indoor and outdoor, but not directly in earth and water. They are considered as protectively insulated.

Fire resistant communication cables are used in places where it is necessary that devices should operate during a fire. Special materials and the way of cables installation ensure the supply of electrical power for at least 90 minutes. Cables insulation resistance is 180 minutes at temperatures of 750 ̊C. Cables are used in emergency lighting installations, smoke extractors, alarm systems, signaling DSO systems, fire alarms and fire automation.

Used cables by test [1] / [2] / [3]:

Power cables:

(N)HXH 0,6/1kV 4x1,5RE mm

2

E90 (12x / 4x /14x)

(N)HXH 0,6/1kV 4x50RM mm

2

E90 (8x / 2x / 14x)

(N)HXCH 0,6/1kV 4x1,5/1,5RE mm

2

E90 (10x / 2x / 14x)

(N)HXCH 0,6/1kV 4x50/25RM mm

2

E90 (16x / 12x / 14x)

NHXH 0,6/1kV 4x1,5RE mm

2

E90 (12x / 14x)

NHXH 0,6/1kV 4x50RM mm

2

E90 (10x / 14x)

NHXCH 0,6/1kV 4x1,5/1,5RE mm

2

E90 (16x / 14x)

NHXCH 0,6/1kV 4x50/25RM mm

2

E90 (12x / 14x)

(5)

Communication cables:

HDGs 300/500V 2x1 mm

2

E90 PH90 (18x / 12x / 14x) HTKSH FE180/PH90 240V 1x2x0,8 mm (20x / 14x)

The length of cables was 5,2 m and 4,0 m from that was exposed to fire.

More detailed information about product construction is shown in the drawings which form an integral part of test report [1]. Drawings were delivered by sponsor.

3. TEST REPORTS AND EXTENDED APPLICATION REPORTS IN SUPPORT OF CLASSIFICATION 3.1 TEST REPORTS AND EXTENDED APPLICATION REPORTS

No. Name of

laboratory Name of sponsor Test report No. Date of the

test Test method [1]

FIRES, s.r.o., Batizovce, SR

BAKS Kazimierz Sielski, 05 - 480 Karczew, Poland

FIRES-FR-

035-15-AUNE 26. 02. 2015

STN 92 0205

[2] FIRES-FR-

156-14-AUNE 21. 08. 2014

[3] FIRES-FR-

143-14-AUNE 31. 07. 2014 3.2 TEST RESULTS

No./

Test method

Specimen

No. Cables Track

No.

Time to first failure / interruption of conductor

[1]

STN 92 0205

1 2 cables NHXCH 0,6/1kV 4x1,5/1,5RE mm2 E90

11

90 minutes no failure / interruption 2 2 cables NHXH 0,6/1kV 4x1,5RE mm2 E90 39 minutes

3 2 cables NHXCH 0,6/1kV 4x50/25RM mm2 E90 90 minutes no failure / interruption 4 2 cables NHXH 0,6/1kV 4x50RM mm2 E90 90 minutes no failure / interruption 5 2 cables (N)HXCH 0,6/1kV 4x1,5/1,5RE mm2 E90

10

90 minutes no failure / interruption 6 2 cables (N)HXH 0,6/1kV 4x1,5RE mm2 E90 90 minutes no failure / interruption 7 2 cables (N)HXCH 0,6/1kV 4x50/25RM mm2 E90 90 minutes no failure / interruption 8 2 cables (N)HXH 0,6/1kV 4x50RM mm2 E90 90 minutes no failure / interruption 9 2 cables (N)HXCH 0,6/1kV 4x50/25RM mm2 E90 17 90 minutes no failure / interruption 10 2 cables NHXCH 0,6/1kV 4x50/25RM mm2 E90 16 90 minutes no failure / interruption 11 2 cables (N)HXCH 0,6/1kV 4x1,5/1,5RE mm2 E90

9

90 minutes no failure / interruption 12 2 cables (N)HXCH 0,6/1kV 4x50/25RM mm2 E90 55 minutes

13 2 cables (N)HXH 0,6/1kV 4x1,5RE mm2 E90

8

71 minutes

14 2 cables (N)HXH 0,6/1kV 4x50RM mm2 E90 90 minutes no failure / interruption 15 2 cables (N)HXCH 0,6/1kV 4x50/25RM mm2 E90

16

90 minutes no failure / interruption 16 2 cables (N)HXH 0,6/1kV 4x50RM mm2 E90 90 minutes no failure / interruption

17 2 cables NHXH 0,6/1kV 4x50RM mm2 E90 69 minutes

18 2 cables NHXCH 0,6/1kV 4x1,5/1,5RE mm2 E90

15

90 minutes no failure / interruption 19 2 cables (N)HXCH 0,6/1kV 4x1,5/1,5RE mm2 E90 90 minutes no failure / interruption 20 2 cables NHXH 0,6/1kV 4x1,5RE mm2 E90 90 minutes no failure / interruption 21 2 cables (N)HXH 0,6/1kV 4x1,5RE mm2 E90 90 minutes no failure / interruption 22 2 cables NHXCH 0,6/1kV 4x1,5/1,5RE mm2 E90

7

90 minutes no failure / interruption 23 2 cables NHXCH 0,6/1kV 4x50/25RM mm2 E90 90 minutes no failure / interruption 24 2 cables NHXH 0,6/1kV 4x50RM mm2 E90 90 minutes no failure / interruption 25 2 cables (N)HXCH 0,6/1kV 4x50/25RM mm2 E90

6 90 minutes no failure / interruption 26 2 cables (N)HXH 0,6/1kV 4x1,5RE mm2 E90 40 minutes

(6)

No./

Test method

Specimen

No. Cables Track

No.

Time to first failure / interruption of conductor

[1]

STN 92 0205

27 2 cables (N)HXCH 0,6/1kV 4x50/25RM mm2 E90

5

90 minutes no failure / interruption 28 2 cables NHXH 0,6/1kV 4x50RM mm2 E90 90 minutes no failure / interruption 29 2 cables NHXCH 0,6/1kV 4x1,5/1,5RE mm2 E90 90 minutes no failure / interruption 30 2 cables NHXCH 0,6/1kV 4x50/25RM mm2 E90

14

90 minutes no failure / interruption 31 2 cables (N)HXCH 0,6/1kV 4x50/25RM mm2 E90 55 minutes

32 2 cables NHXH 0,6/1kV 4x50RM mm2 E90 90 minutes no failure / interruption 33 2 cables (N)HXH 0,6/1kV 4x50RM mm2 E90 71 minutes

34 2 cables NHXCH 0,6/1kV 4x1,5/1,5RE mm2 E90

4

37 minutes

35 2 cables NHXCH 0,6/1kV 4x50/25RM mm2 E90 90 minutes no failure / interruption 36 2 cables NHXH 0,6/1kV 4x1,5RE mm2 E90 40 minutes

37 2 cables (N)HXCH 0,6/1kV 4x50/25RM mm2 E90

3

90 minutes no failure / interruption 38 2 cables (N)HXH 0,6/1kV 4x1,5RE mm2 E90 90 minutes no failure / interruption 39 2 cables NHXCH 0,6/1kV 4x1,5/1,5RE mm2 E90

13

90 minutes no failure / interruption 40 2 cables NHXH 0,6/1kV 4x1,5RE mm2 E90 90 minutes no failure / interruption 41 2 cables (N)HXCH 0,6/1kV 4x1,5/1,5RE mm2 E90 90 minutes no failure / interruption 42 2 cables (N)HXH 0,6/1kV 4x1,5RE mm2 E90 90 minutes no failure / interruption 43 2 cables NHXCH 0,6/1kV 4x50/25RM mm2 E90

2 90 minutes no failure / interruption 44 2 cables NHXH 0,6/1kV 4x1,5RE mm2 E90 41 minutes

45 2 cables NHXCH 0,6/1kV 4x1,5/1,5RE mm2 E90

1 90 minutes no failure / interruption 46 2 cables (N)HXCH 0,6/1kV 4x1,5/1,5RE mm2 E90 65 minutes

47 2 cables NHXCH 0,6/1kV 4x1,5/1,5RE mm2 E90

12 90 minutes no failure / interruption 48 2 cables NHXH 0,6/1kV 4x1,5RE mm2 E90 90 minutes no failure / interruption 52 2 cables HDGs 300/500V 2x1 mm2 E90 PH90 11 33 minutes

53 2 cables HTKSH FE180/PH90 240V 1x2x0,8 mm 10 53 minutes 54 2 cables HDGs 300/500V 2x1 mm2 E90 PH90 9 36 minutes 55 2 cables HTKSH FE180/PH90 240V 1x2x0,8 mm 8 39 minutes 56 2 cables HTKSH FE180/PH90 240V 1x2x0,8 mm

15

88 minutes

57 2 cables HDGs 300/500V 2x1 mm2 E90 PH90 90 minutes no failure / interruption 58 2 cables HTKSH FE180/PH90 240V 1x2x0,8 mm

6 32 minutes

59 2 cables HDGs 300/500V 2x1 mm2 E90 PH90 90 minutes no failure / interruption 60 2 cables HTKSH FE180/PH90 240V 1x2x0,8 mm

5 43 minutes 61 2 cables HDGs 300/500V 2x1 mm2 E90 PH90 51 minutes 62 2 cables HTKSH FE180/PH90 240V 1x2x0,8 mm 4 32 minutes 63 2 cables HDGs 300/500V 2x1 mm2 E90 PH90 3 54 minutes 64 2 cables HTKSH FE180/PH90 240V 1x2x0,8 mm

13 90 minutes no failure / interruption 65 2 cables HDGs 300/500V 2x1 mm2 E90 PH90 76 minutes

66 2 cables HTKSH FE180/PH90 240V 1x2x0,8 mm 2 34 minutes 67 2 cables HTKSH FE180/PH90 240V 1x2x0,8 mm

1 90 minutes no failure / interruption 68 2 cables HDGs 300/500V 2x1 mm2 E90 PH90 90 minutes no failure / interruption 69 2 cables HTKSH FE180/PH90 240V 1x2x0,8 mm

12 90 minutes no failure / interruption 70 2 cables HDGs 300/500V 2x1 mm2 E90 PH90 90 minutes no failure / interruption

[1] The fire test was discontinued in 94

th

minute at the request of test sponsor.

Specimens S1 – S48 were tested by three-phase voltage supply 3 x 230/400V with bulbs 240V / 60 W.

Specimens S52 – S70 were tested by one-phase voltage supply 1 x 110V with LED diodes 3V /0,03W.

Circuit breakers with rating 3 A were used.

(7)

No./

Test method

Specimen

No. Cables Track

No.

Time to first failure / interruption of conductor

[2]

STN 92 0205

1 2 cables NHXCH 0,6/1kV 4x50/25RM mm2 E90

11

79 minutes 2 2 cables (N)HXCH 0,6/1kV 4x50/25RM mm2 E90 42 minutes 3 2 cables NHXCH 0,6/1kV 4x1,5/1,5RE mm2 E90 65 minutes 4 2 cables (N)HXCH 0,6/1kV 4x50/25RM mm2 E90

10

71 minutes

5 2 cables NHXCH 0,6/1kV 4x50/25RM mm2 E90 90 minutes no failure / interruption 6 2 cables NHXCH 0,6/1kV 4x1,5/1,5RE mm2 E90 87 minutes

7 2 cables NHXCH 0,6/1kV 4x1,5/1,5RE mm2 E90

13 90 minutes no failure / interruption 8 2 cables NHXH 0,6/1kV 4x1,5RE mm2 E90 90 minutes no failure / interruption 9 2 cables (N)HXH 0,6/1kV 4x1,5RE mm2 E90

9

86 minutes

10 2 cables NHXH 0,6/1kV 4x50RM mm2 E90 43 minutes

11 2 cables NHXH 0,6/1kV 4x1,5RE mm2 E90 90 minutes no failure / interruption 12 2 cables NHXH 0,6/1kV 4x50RM mm2 E90

8

36 minutes

13 2 cables NHXH 0,6/1kV 4x1,5RE mm2 E90 90 minutes no failure / interruption 14 2 cables (N)HXCH 0,6/1kV 4x50/25RM mm2 E90

13

56 minutes

15 2 cables NHXCH 0,6/1kV 4x50/25RM mm2 E90 90 minutes no failure / interruption 16 2 cables NHXH 0,6/1kV 4x50RM mm2 E90 90 minutes no failure / interruption 17 2 cables (N)HXCH 0,6/1kV 4x50/25RM mm2 E90

7

44 minutes 18 2 cables NHXCH 0,6/1kV 4x50/25RM mm2 E90 83 minutes 19 2 cables NHXCH 0,6/1kV 4x1,5/1,5RE mm2 E90 73 minutes 20 2 cables (N)HXH 0,6/1kV 4x1,5RE mm2 E90

6

82 minutes

21 2 cables NHXH 0,6/1kV 4x50RM mm2 E90 90 minutes no failure / interruption 22 2 cables NHXH 0,6/1kV 4x1,5RE mm2 E90 51 minutes

23 2 cables NHXCH 0,6/1kV 4x50/25RM mm2 E90

5

85 minutes

24 2 cables NHXCH 0,6/1kV 4x1,5/1,5RE mm2 E90 90 minutes no failure / interruption 25 2 cables NHXCH 0,6/1kV 4x50/25RM mm2 E90

4

90 minutes no failure / interruption 26 cable NHXCH 0,6/1kV 4x1,5/1,5RE mm2 E90 79 minutes

27 cable NHXCH 0,6/1kV 4x1,5/1,5RE mm2 E90 75 minutes 28 cable (N)HXCH 0,6/1kV 4x50/25RM mm2 E90

3

90 minutes no failure / interruption 29 cable (N)HXCH 0,6/1kV 4x50/25RM mm2 E90 90 minutes no failure / interruption 30 cable (N)HXCH 0,6/1kV 4x1,5/1,5RE mm2 E90 89 minutes

31 cable (N)HXCH 0,6/1kV 4x1,5/1,5RE mm2 E90 90 minutes no failure / interruption 32 cable NHXCH 0,6/1kV 4x1,5/1,5RE mm2 E90

12

87 minutes 33 cable NHXCH 0,6/1kV 4x1,5/1,5RE mm2 E90 86 minutes

34 cable NHXH 0,6/1kV 4x1,5RE mm2 E90 87 minutes

35 cable NHXH 0,6/1kV 4x1,5RE mm2 E90 85 minutes

36 cable (N)HXH 0,6/1kV 4x50RM mm2 E90

2

90 minutes no failure / interruption 37 cable (N)HXH 0,6/1kV 4x50RM mm2 E90 90 minutes no failure / interruption 38 cable NHXH 0,6/1kV 4x50RM mm2 E90 90 minutes no failure / interruption 39 cable NHXH 0,6/1kV 4x50RM mm2 E90 90 minutes no failure / interruption

40 cable NHXH 0,6/1kV 4x1,5RE mm2 E90 52 minutes

41 cable NHXH 0,6/1kV 4x1,5RE mm2 E90 90 minutes no failure / interruption 42 cable NHXH 0,6/1kV 4x50RM mm2 E90

1

90 minutes no failure / interruption 43 cable NHXH 0,6/1kV 4x50RM mm2 E90 90 minutes no failure / interruption 44 cable NHXH 0,6/1kV 4x1,5RE mm2 E90 90 minutes no failure / interruption 45 cable NHXH 0,6/1kV 4x1,5RE mm2 E90 90 minutes no failure / interruption

(8)

No./

Test method

Specimen

No. Cables Track

No.

Time to first failure / interruption of conductor

[2]

STN 92 0205

46 cable (N)HXCH 0,6/1kV 4x50/25RM mm2 E90

12

90 minutes no failure / interruption 47 cable (N)HXCH 0,6/1kV 4x50/25RM mm2 E90 90 minutes no failure / interruption 48 cable NHXCH 0,6/1kV 4x50/25RM mm2 E90 90 minutes no failure / interruption 49 cable NHXCH 0,6/1kV 4x50/25RM mm2 E90 90 minutes no failure / interruption 50 cable NHXH 0,6/1kV 4x50RM mm2 E90 90 minutes no failure / interruption 51 cable NHXH 0,6/1kV 4x50RM mm2 E90 90 minutes no failure / interruption 52 2 cables HTKSH FE180/PH90 240V 1x2x0,8mm 13 90 minutes no failure / interruption 53 2 cables HTKSH FE180/PH90 240V 1x2x0,8mm 9 26 minutes

54 2 cables HTKSH FE180/PH90 240V 1x2x0,8mm

8

40 minutes 55 2 cables HDGs 300/500V 2x1 mm2 E90 PH90 42 minutes 56 2 cables HDGs 300/500V 2x1 mm2 E90 PH90 7 9 minutes 57 2 cables HTKSH FE180/PH90 240V 1x2x0,8mm 6 40 minutes 58 2 cables HDGs 300/500V 2x1 mm2 E90 PH90 5 29 minutes 59 2 cables HDGs 300/500V 2x1 mm2 E90 PH90 3 43 minutes 60 2 cables HDGs 300/500V 2x1 mm2 E90 PH90

12 85 minutes 61 2 cables HTKSH FE180/PH90 240V 1x2x0,8mm 84 minutes 62 2 cables HTKSH FE180/PH90 240V 1x2x0,8mm 2 29 minutes 63 2 cables HTKSH FE180/PH90 240V 1x2x0,8mm 1 41 minutes 64 2 cables HDGs 300/500V 2x1 mm2 E90 PH90 9 35 minutes

[2] The fire test was discontinued in 94

th

minute at the request of test sponsor.

Specimens S1 – S51 were tested by three-phase voltage supply 3 x 230/400V with bulbs 240V / 60 W.

Specimens S52 – S64 were tested by one-phase voltage supply 1 x 110V with LED diodes 3V /0,03W.

Circuit breakers with rating 3 A were used.

No./

Test method

Specimen

No. Cables Track

No.

Time to first failure / interruption of conductor

[3]

STN 92 0205

1 2 cables (N)HXCH 0,6/1kV 4x50/25RM mm2 E90

10

41 minutes

2 2 cables (N)HXCH 0,6/1kV 4x1,5/1,5RE mm2 E90 90 minutes no failure / interruption 3 2 cables (N)HXCH 0,6/1kV 4x50/25RM mm2 E90

8 46 minutes

4 2 cables (N)HXCH 0,6/1kV 4x1,5/1,5RE mm2 E90 90 minutes no failure / interruption 5 2 cables (N)HXCH 0,6/1kV 4x1,5/1,5RE mm2 E90

12

90 minutes no failure / interruption 6 cable (N)HXH 0,6/1kV 4x1,5RE mm2 E90 90 minutes no failure / interruption 7 cable (N)HXH 0,6/1kV 4x1,5RE mm2 E90 90 minutes no failure / interruption 8 cable (N)HXH 0,6/1kV 4x50RM mm2 E90

9

90 minutes no failure / interruption 9 cable (N)HXH 0,6/1kV 4x50RM mm2 E90 90 minutes no failure / interruption

10 cable (N)HXH 0,6/1kV 4x1,5RE mm2 E90 83 minutes

11 cable (N)HXH 0,6/1kV 4x1,5RE mm2 E90 90 minutes no failure / interruption 12 cable (N)HXH 0,6/1kV 4x50RM mm2 E90

7

90 minutes no failure / interruption 13 cable (N)HXH 0,6/1kV 4x50RM mm2 E90 90 minutes no failure / interruption 14 cable (N)HXH 0,6/1kV 4x1,5RE mm2 E90 90 minutes no failure / interruption 15 cable (N)HXH 0,6/1kV 4x1,5RE mm2 E90 90 minutes no failure / interruption 16 cable (N)HXCH 0,6/1kV 4x50/25RM mm2 E90

12

55 minutes 17 cable (N)HXCH 0,6/1kV 4x50/25RM mm2 E90 56 minutes

18 cable (N)HXH 0,6/1kV 4x50RM mm2 E90 90 minutes no failure / interruption 19 cable (N)HXH 0,6/1kV 4x50RM mm2 E90 90 minutes no failure / interruption

(9)

No./

Test method

Specimen

No. Cables Track

No.

Time to first failure / interruption of conductor

[3]

STN 92 0205

20 cable (N)HXCH 0,6/1kV 4x50/25RM mm2 E90

6

39 minutes 21 cable (N)HXCH 0,6/1kV 4x50/25RM mm2 E90 38 minutes

22 cable (N)HXCH 0,6/1kV 4x1,5/1,5RE mm2 E90 90 minutes no failure / interruption 23 cable (N)HXCH 0,6/1kV 4x1,5/1,5RE mm2 E90 90 minutes no failure / interruption 24 cable (N)HXH 0,6/1kV 4x50RM mm2 E90

5

90 minutes no failure / interruption 25 cable (N)HXH 0,6/1kV 4x50RM mm2 E90 90 minutes no failure / interruption

26 cable (N)HXH 0,6/1kV 4x1,5RE mm2 E90 80 minutes

27 cable (N)HXH 0,6/1kV 4x1,5RE mm2 E90 90 minutes no failure / interruption 28 cable (N)HXCH 0,6/1kV 4x50/25RM mm2 E90

4

90 minutes no failure / interruption 29 cable (N)HXCH 0,6/1kV 4x50/25RM mm2 E90 90 minutes no failure / interruption 30 cable (N)HXCH 0,6/1kV 4x1,5/1,5RE mm2 E90 90 minutes no failure / interruption 31 cable (N)HXCH 0,6/1kV 4x1,5/1,5RE mm2 E90 90 minutes no failure / interruption 32 cable (N)HXCH 0,6/1kV 4x50/25RM mm2 E90

2

90 minutes no failure / interruption 33 cable (N)HXCH 0,6/1kV 4x50/25RM mm2 E90 44 minutes

34 cable (N)HXCH 0,6/1kV 4x1,5/1,5RE mm2 E90 78 minutes 35 cable (N)HXCH 0,6/1kV 4x1,5/1,5RE mm2 E90 83 minutes 36 cable (N)HXCH 0,6/1kV 4x1,5/1,5RE mm2 E90

11

90 minutes no failure / interruption 37 cable (N)HXCH 0,6/1kV 4x1,5/1,5RE mm2 E90 90 minutes no failure / interruption 38 cable (N)HXH 0,6/1kV 4x1,5RE mm2 E90 90 minutes no failure / interruption 39 cable (N)HXH 0,6/1kV 4x1,5RE mm2 E90 90 minutes no failure / interruption 40 cable (N)HXH 0,6/1kV 4x50RM mm2 E90

3

90 minutes no failure / interruption

41 cable (N)HXH 0,6/1kV 4x50RM mm2 E90 74 minutes

42 cable (N)HXH 0,6/1kV 4x1,5RE mm2 E90 90 minutes no failure / interruption 43 cable (N)HXH 0,6/1kV 4x1,5RE mm2 E90 90 minutes no failure / interruption 44 cable (N)HXH 0,6/1kV 4x50RM mm2 E90

1

90 minutes no failure / interruption 45 cable (N)HXH 0,6/1kV 4x50RM mm2 E90 90 minutes no failure / interruption 46 cable (N)HXH 0,6/1kV 4x1,5RE mm2 E90 90 minutes no failure / interruption 47 cable (N)HXH 0,6/1kV 4x1,5RE mm2 E90 90 minutes no failure / interruption 48 cable (N)HXCH 0,6/1kV 4x50/25RM mm2 E90

11

52 minutes

49 cable (N)HXCH 0,6/1kV 4x50/25RM mm2 E90 90 minutes no failure / interruption 50 cable (N)HXH 0,6/1kV 4x50RM mm2 E90 90 minutes no failure / interruption 51 cable (N)HXH 0,6/1kV 4x50RM mm2 E90 90 minutes no failure / interruption 52 2 cables HDGs 300/500V 2x1 mm2 E90 PH90 12 90 minutes no failure / interruption 53 2 cables HDGs 300/500V 2x1 mm2 E90 PH90 9 47 minutes

54 2 cables HDGs 300/500V 2x1 mm2 E90 PH90 7 28 minutes 55 2 cables HDGs 300/500V 2x1 mm2 E90 PH90 5 17 minutes 56 2 cables HDGs 300/500V 2x1 mm2 E90 PH90 11 85 minutes

57 2 cables HDGs 300/500V 2x1 mm2 E90 PH90 3 90 minutes no failure / interruption 58 2 cables HDGs 300/500V 2x1 mm2 E90 PH90 1 40 minutes

[3] The fire test was discontinued in 94

th

minute at the request of test sponsor.

Specimens S1 – S51 were tested by three-phase voltage supply 3 x 230/400V with bulbs 240V / 60 W.

Specimens S52 – S58 were tested by one-phase voltage supply 1 x 110V with LED diodes 3V /0,03W.

Circuit breakers with rating 3 A were used.

(10)

4. CLASSIFICATION AND FIELD OF APPLICATION 4.1 REFERENCE OF CLASSIFICATION

This classification has been carried out in accordance with clause 3.2 of DIN 4102 – 12:1998-11.

4.2 CLASSIFICATION ACCORDING TO DIN 4102-12:1998-11

Cable

Type of tested cable, single cross- sections and number of conductors,

[No. of test report]

Arrangement

Classification for type of tested cable

(by cross-sections and number of

conductors)

Classification for cable

NHXH 0,6/1kV E90

NHXH 0,6/1kV 4x1,5RE mm2 E90 [2]

Cable trays KCP/KCOP300H60.

Consoles WPCB700, spacers BR55, brackets WWS/WWSO400,

holders UPW/UPWO, threaded rods PG M10, ceiling hanger USV/USOV.

Loading 10kg.m-1. Consoles in spacing of 1200 mm.

Track No. 1. [1]

Tracks No. 1, 3 and 4. [2]

Tracks No. 1 and 2. [3]

E 90 n x ≥ 1,5 mm2 n ≥ 2 E 90

NHXH 0,6/1kV 4x50RM mm2 E90 [2] E 90

(N)HXH 0,6/1kV E90

(N)HXH 0,6/1kV 4x1,5RE mm2 E90 [3] E 90 n x ≥ 1,5 mm2

n ≥ 2 E 90

(N)HXH 0,6/1kV 4x50RM mm2 E90 [3] E 90

(N)HXCH 0,6/1kV

E90

(N)HXCH 0,6/1kV 4x1,5/1,5RE mm2 E90

[2] E 60 n x ≥ 1,5 mm2

n ≥ 2 E 60 (N)HXCH 0,6/1kV 4x50/25RM mm2 E90

[2] E 90

NHXCH 0,6/1kV E90

NHXCH 0,6/1kV 4x1,5/1,5RE mm2 E90

[1] E 90 n x ≥ 1,5 mm2

n ≥ 2 E 90 NHXCH 0,6/1kV 4x50/25RM mm2 E90

[2] E 90

HDGs 300/500V E90 PH90

HDGs 300/500V 2x1 mm2 E90 PH90 [1] E 90

n x ≥ 1,0 mm2 n ≥ 2 E 90 HTKSH

FE180/PH90 240V

HTKSH FE180/PH90 240V 1x2x0,8mm

[1] E 90

n x 2 x ≥ 0,8 mm n ≥ 1 E 90 NHXH

0,6/1kV E90

NHXH 0,6/1kV 4x1,RE mm2 E90 [2]

Cable ladders DGOP400H60.

Consoles WPCB700, spacers BR55, brackets WWS/WWSO400,

holders UPW/UPWO, threaded rods PG M10, ceiling hanger USV/USOV.

Loading 20kg.m-1. Consoles in spacing of 1200 mm.

Track No. 2. [1]

Tracks No. 2 and 5. [2]

Tracks No. 3 and 4. [3]

E 30 n x ≥ 1,5 mm2 n ≥ 2 E 30

NHXH 0,6/1kV 4x50RM mm2 E90 [2] E 90

NHXCH 0,6/1kV E90

NHXCH 0,6/1kV 4x1,5/1,5RE mm2 E90

[2] E 90 n x ≥ 1,5 mm2

n ≥ 2 E 90 NHXCH 0,6/1kV 4x50/25RM mm2 E90

[1] E 90

(N)HXH 0,6/1kV E90

(N)HXH 0,6/1kV 4x1,5RE mm2 E90 [3] E 90 n x ≥ 1,5 mm2

n ≥ 2 E 90

(N)HXH 0,6/1kV 4x50RM mm2 E90 [2] E 90

(N)HXCH 0,6/1kV

E90

(N)HXCH 0,6/1kV 4x1,5/1,5RE mm2 E90

[3] E 90 n x ≥ 1,5 mm2

n ≥ 2 E 90 (N)HXCH 0,6/1kV 4x50/25RM mm2 E90

[3] E 90

HDGs 300/500V E90 PH90

HDGs 300/500V 2x1 mm2 E90 PH90 [3] E 90

n x ≥ 1,0 mm2 n ≥ 2 E 90 HTKSH

FE180/PH90 240V

HTKSH FE180/PH90 240V 1x2x0,8mm

[1] E 30

n x 2 x ≥ 0,8 mm n ≥ 1 E 30

(11)

Cable Type of tested cable, single cross-

sections and number of conductors Arrangement

Classification for type of tested cable

(by cross-sections and number of

conductors)

Classification for cable

NHXH 0,6/1kV E90

NHXH 0,6/1kV 4x1,5RE mm2 E90 [2]

Cable mesh trays KDS/KDSO400H60.

Consoles combined of supports CWP/CWOP40H40/05 and

threaded rods PG M10.

Loading 20kg.m-1. Consoles in spacing of 1500 mm.

Tracks No. 3 and 4. [1]

Tracks No. 6 and 7. [2]

Tracks No. 5 and 6. [3]

E 30 n x ≥ 1,5 mm2 n ≥ 2 E 30

NHXH 0,6/1kV 4x50RM mm2 E90 [2] E 90

(N)HXH 0,6/1kV E90

(N)HXH 0,6/1kV 4x1,5RE mm2 E90 [1] E 90 n x ≥ 1,5 mm2

n ≥ 2 E 90

(N)HXH 0,6/1kV 4x50RM mm2 E90 [3] E 90

HTKSH FE180/PH90

240V

HTKSH FE180/PH90 240V 1x2x0,8mm

[2] E 30

n x 2 x ≥ 0,8 mm n ≥ 1 E 30 NHXCH

0,6/1kV E90

NHXCH 0,6/1kV 4x1,5/1,5RE mm2 E90

[2] E 60 n x ≥ 1,5 mm2

n ≥ 2 E 60 NHXCH 0,6/1kV 4x50/25RM mm2 E90

[1] E 90

(N)HXCH 0,6/1kV

E90

(N)HXCH 0,6/1kV 4x1,5/1,5RE mm2 E90

[3] E 90 n x ≥ 1,5 mm2

n ≥ 2 E 90 (N)HXCH 0,6/1kV 4x50/25RM mm2 E90

[1] E 90

HDGs 300/500V E90 PH90

HDGs 300/500V 2x1 mm2 E90 PH90 [1] E 30

n x ≥ 1,0 mm2 n ≥ 2 E 30 NHXH

0,6/1kV E90

NHXH 0,6/1kV 4x1,5RE mm2 E90 [2]

Cable trays KGJ/KGOJ400H60.

Consoles combined of supports CWP/CWOP40H40/05 and

threaded rods PG M10.

Loading 20kg.m-1. Consoles in spacing of 1500 mm.

Track No. 5. [1]

Tracks No. 8 and 10. [2]

Tracks No. 7 and 8. [3]

E 90 n x ≥ 1,5 mm2 n ≥ 2 E 90

NHXH 0,6/1kV 4x50RM mm2 E90 [1] E 90

(N)HXH 0,6/1kV E90

(N)HXH 0,6/1kV 4x1,5RE mm2 E90 [3] E 90 n x ≥ 1,5 mm2

n ≥ 2 E 90

(N)HXH 0,6/1kV 4x50RM mm2 E90 [3] E 90

NHXCH 0,6/1kV E90

NHXCH 0,6/1kV 4x1,5/1,5RE mm2 E90

[1] E 90 n x ≥ 1,5 mm2

n ≥ 2 E 90 NHXCH 0,6/1kV 4x50/25RM mm2 E90

[2] E 90

(N)HXCH 0,6/1kV

E90

(N)HXCH 0,6/1kV 4x1,5/1,5RE mm2 E90

[3] E 90 n x ≥ 1,5 mm2

n ≥ 2 E 90 (N)HXCH 0,6/1kV 4x50/25RM mm2 E90

[1] E 90

HDGs 300/500V E90 PH90

HDGs 300/500V 2x1 mm2 E90 PH90 [1] E 30

n x ≥ 1,0 mm2 n ≥ 2 E 30 HTKSH

FE180/PH90 240V

HTKSH FE180/PH90 240V 1x2x0,8mm

[1] E 30

n x 2 x ≥ 0,8 mm n ≥ 1 E 30

(12)

Cable Type of tested cable, single cross-

sections and number of conductors Arrangement

Classification for type of tested cable

(by cross-sections and number of

conductors)

Classification for cable

NHXH 0,6/1kV E90

NHXH 0,6/1kV 4x1,5RE mm2 E90 [2]

Cable ladders DUP/DUOP400H60.

Consoles combined of supports CWP/CWOP40H40/05 and

threaded rods PG M10.

Loading 20kg.m-1. Consoles in spacing of 1500 mm.

Tracks No. 6 and 7. [1]

Tracks No. 9 and 11. [2]

Tracks No. 9 and 10. [3]

E 90 n x ≥ 1,5 mm2 n ≥ 2 E 90

NHXH 0,6/1kV 4x50RM mm2 E90 [1] E 90

NHXCH 0,6/1kV E90

NHXCH 0,6/1kV 4x1,5/1,5RE mm2 E90

[1] E 90 n x ≥ 1,5 mm2

n ≥ 2 E 90 NHXCH 0,6/1kV 4x50/25RM mm2 E90

[1] E 90

(N)HXH 0,6/1kV E90

(N)HXH 0,6/1kV 4x1,5RE mm2 E90 [2] E 60 n x ≥ 1,5 mm2

n ≥ 2 E 60

(N)HXH 0,6/1kV 4x50RM mm2 E90 [3] E 90

(N)HXCH 0,6/1kV

E90

(N)HXCH 0,6/1kV 4x1,5/1,5RE mm2 E90

[3] E 90 n x ≥ 1,5 mm2

n ≥ 2 E 90 (N)HXCH 0,6/1kV 4x50/25RM mm2 E90

[1] E 90

HDGs 300/500V E90 PH90

HDGs 300/500V 2x1 mm2 E90 PH90 [1] E 90

n x ≥ 1,0 mm2 n ≥ 2 E 90 HTKSH

FE180/PH90 240V

HTKSH FE180/PH90 240V 1x2x0,8mm

[1] E 30

n x 2 x ≥ 0,8 mm n ≥ 1 E 30 (N)HXH

0,6/1kV E90

(N)HXH 0,6/1kV 4x1,5RE mm2 E90 [1]

Cable trays KGL/KGOL300H60.

Consoles WPCB700 reinforced in place of fixing brackets by spacer

BR55. Brackets WWS/WWSO300.

Loading 10kg.m-1. Consoles in spacing of 1500 mm.

Tracks No. 8 and 9. [1]

E 60 n x ≥ 1,5 mm2 n ≥ 2 E 60

(N)HXH 0,6/1kV 4x50RM mm2 E90 [1] E 90

HTKSH FE180/PH90

240V

HTKSH FE180/PH90 240V 1x2x0,8mm

[1] E 30

n x 2 x ≥ 0,8 mm n ≥ 1 E 30 (N)HXCH

0,6/1kV E90

(N)HXCH 0,6/1kV 4x1,5/1,5RE mm2 E90

[1] E 90 n x ≥ 1,5 mm2

n ≥ 2 E 30 (N)HXCH 0,6/1kV 4x50/25RM mm2 E90

[1] E 30

HDGs 300/500V E90 PH90

HDGs 300/500V 2x1 mm2 E90 PH90 [1] E 30

n x ≥ 1,0 mm2 n ≥ 2 E 30 (N)HXH

0,6/1kV E90

(N)HXH 0,6/1kV 4x1,5RE mm2 E90 [1]

Cable ladders DUD400H60.

Consoles combined of supports CWP40H22/05 and threaded rods PG M10.

Loading 20kg.m-1. Consoles in spacing of 1500 mm.

Tracks No. 10 and 11. [1]

E 90 n x ≥ 1,5 mm2 n ≥ 2 E 90

(N)HXH 0,6/1kV 4x50RM mm2 E90 [1] E 90

(N)HXCH 0,6/1kV

E90

(N)HXCH 0,6/1kV 4x1,5/1,5RE mm2 E90

[1] E 90 n x ≥ 1,5 mm2

n ≥ 2 E 90 (N)HXCH 0,6/1kV 4x50/25RM mm2 E90

[1] E 90

NHXH 0,6/1kV E90

NHXH 0,6/1kV 4x1,5RE mm2 E90 [1] E 30 n x ≥ 1,5 mm2

n ≥ 2 E 30

NHXH 0,6/1kV 4x50RM mm2 E90 [1] E 90

NHXCH 0,6/1kV E90

NHXCH 0,6/1kV 4x1,5/1,5RE mm2 E90

[1] E 90 n x ≥ 1,5 mm2

n ≥ 2 E 90 NHXCH 0,6/1kV 4x50/25RM mm2 E90

[1] E 90

HDGs 300/500V E90 PH90

HDGs 300/500V 2x1 mm2 E90 PH90 [1] E 30

n x ≥ 1,0 mm2 n ≥ 2 E 30 HTKSH

FE180/PH90 240V

HTKSH FE180/PH90 240V 1x2x0,8mm

[1] E 30

n x 2 x ≥ 0,8 mm n ≥ 1 E 30

(13)

Cable Type of tested cable, single cross-

sections and number of conductors Arrangement

Classification for type of tested cable

(by cross-sections and number of

conductors)

Classification for cable

NHXH 0,6/1kV E90

NHXH 0,6/1kV 4x1,5RE mm2 E90 [1]

Assembling profiles SDOP400 fixed to ceiling in spacing

of 300 mm.

Cables are fixed to profiles by cable clamps (UK1/UKO1).

Track No. 12. [1]

Track No. 12. [2]

Track No. 11. [3]

E 90 n x ≥ 1,5 mm2 n ≥ 2 E 90

NHXH 0,6/1kV 4x50RM mm2 E90 [2] E 90

(N)HXH 0,6/1kV E90

(N)HXH 0,6/1kV 4x1,5RE mm2 E90 [3] E 90 n x ≥ 1,5 mm2

n ≥ 2 E 90

(N)HXH 0,6/1kV 4x50RM mm2 E90 [3] E 90

NHXCH 0,6/1kV E90

NHXCH 0,6/1kV 4x1,5/1,5RE mm2 E90

[1] E 90 n x ≥ 1,5 mm2

n ≥ 2 E 90 NHXCH 0,6/1kV 4x50/25RM mm2 E90

[2] E 90

(N)HXCH 0,6/1kV

E90

(N)HXCH 0,6/1kV 4x1,5/1,5RE mm2 E90

[3] E 90 n x ≥ 1,5 mm2

n ≥ 2 E 90 (N)HXCH 0,6/1kV 4x50/25RM mm2 E90

[2] E 90

HDGs 300/500V E90 PH90

HDGs 300/500V 2x1 mm2 E90 PH90 [1] E 90

n x ≥ 1,0 mm2 n ≥ 2 E 90 HTKSH

FE180/PH90 240V

HTKSH FE180/PH90 240V 1x2x0,8mm

[1] E 90

n x 2 x ≥ 0,8 mm n ≥ 1 E 90 (N)HXH

0,6/1kV E90

(N)HXH 0,6/1kV 4x1,5RE mm2 E90 [1]

Assembling profiles SDOP400 fixed to ceiling in spacing

of 600 mm.

Cables are fixed to profiles by cable clamps (UK1/UKO1).

Tracks No. 13 and 14. [1]

E 90 n x ≥ 1,5 mm2 n ≥ 2 E 60

(N)HXH 0,6/1kV 4x50RM mm2 E90 [1] E 60

(N)HXCH 0,6/1kV

E90

(N)HXCH 0,6/1kV 4x1,5/1,5RE mm2 E90

[1] E 90 n x ≥ 1,5 mm2

n ≥ 2 E 30 (N)HXCH 0,6/1kV 4x50/25RM mm2 E90

[1] E 30

NHXH 0,6/1kV E90

NHXH 0,6/1kV 4x1,5RE mm2 E90 [1] E 90 n x ≥ 1,5 mm2

n ≥ 2 E 90

NHXH 0,6/1kV 4x50RM mm2 E90 [1] E 90

NHXCH 0,6/1kV E90

NHXCH 0,6/1kV 4x1,5/1,5RE mm2 E90

[1] E 90 n x ≥ 1,5 mm2

n ≥ 2 E 90 NHXCH 0,6/1kV 4x50/25RM mm2 E90

[1] E 90

HDGs 300/500V E90 PH90

HDGs 300/500V 2x1 mm2 E90 PH90 [1] E 60

n x ≥ 1,0 mm2 n ≥ 2 E 60 HTKSH

FE180/PH90 240V

HTKSH FE180/PH90 240V 1x2x0,8mm

[1] E 90

n x 2 x ≥ 0,8 mm n ≥ 1 E 90

(14)

Cable Type of tested cable, single cross-

sections and number of conductors Arrangement

Classification for type of tested cable

(by cross-sections and number of

conductors)

Classification for cable

(N)HXH 0,6/1kV E90

(N)HXH 0,6/1kV 4x1,5RE mm2 E90 [1]

Cable clips (UDF) fixed to ceiling by screws (MKR 6x32) in spacing of 600 mm.

Tracks No. 15 and 16. [1]

E 90 n x ≥ 1,5 mm2 n ≥ 2 E 90

(N)HXH 0,6/1kV 4x50RM mm2 E90 [1] E 90

(N)HXCH 0,6/1kV

E90

(N)HXCH 0,6/1kV 4x1,5/1,5RE mm2 E90

[1] E 90 n x ≥ 1,5 mm2

n ≥ 2 E 90 (N)HXCH 0,6/1kV 4x50/25RM mm2 E90

[1] E 90

NHXH 0,6/1kV E90

NHXH 0,6/1kV 4x1,5RE mm2 E90 [1] E 90 n x ≥ 1,5 mm2

n ≥ 2 E 60

NHXH 0,6/1kV 4x50RM mm2 E90 [1] E 60

NHXCH 0,6/1kV E90

NHXCH 0,6/1kV 4x1,5/1,5RE mm2 E90

[1] E 90 n x ≥ 1,5 mm2

n ≥ 2 E 90 NHXCH 0,6/1kV 4x50/25RM mm2 E90

[1] E 90

HDGs 300/500V E90 PH90

HDGs 300/500V 2x1 mm2 E90 PH90 [1] E 90

n x ≥ 1,0 mm2 n ≥ 2 E 90 HTKSH

FE180/PH90 240V

HTKSH FE180/PH90 240V 1x2x0,8mm

[1] E 60

n x 2 x ≥ 0,8 mm n ≥ 1 E 60 NHXH

0,6/1kV E90

NHXH 0,6/1kV 4x1,5RE mm2 E90 [2]

Cable clips (UDF) fixed to ceiling by screws (MKR 6x32) in spacing of 300 mm.

Track No. 17. [1]

Track No. 13. [2]

Track No. 12. [3]

E 90 n x ≥ 1,5 mm2 n ≥ 2 E 90

NHXH 0,6/1kV 4x50RM mm2 E90 [2] E 90

(N)HXH 0,6/1kV E90

(N)HXH 0,6/1kV 4x1,5RE mm2 E90 [3] E 90 n x ≥ 1,5 mm2

n ≥ 2 E 90

(N)HXH 0,6/1kV 4x50RM mm2 E90 [3] E 90

NHXCH 0,6/1kV E90

NHXCH 0,6/1kV 4x1,5/1,5RE mm2 E90

[2] E 90 n x ≥ 1,5 mm2

n ≥ 2 E 90 NHXCH 0,6/1kV 4x50/25RM mm2 E90

[2] E 90

(N)HXCH 0,6/1kV

E90

(N)HXCH 0,6/1kV 4x1,5/1,5RE mm2 E90

[3] E 90 n x ≥ 1,5 mm2

n ≥ 2 E 90 (N)HXCH 0,6/1kV 4x50/25RM mm2 E90

[1] E 90

HTKSH FE180/PH90

240V

HTKSH FE180/PH90 240V 1x2x0,8mm

[2] E 90

n x 2 x ≥ 0,8 mm n ≥ 1 E 90 HDGs

300/500V E90 PH90

HDGs 300/500V 2x1 mm2 E90 PH90 [3] E 90

n x ≥ 1,0 mm2 n ≥ 2 E 90

The element, Cable bearing system BAKS – cable trays, cable ladders, cable mesh trays, cable

clips and hangers with accessories (consoles, brackets, supports, hangers, etc.) and power and

communication halogen free cables of company Fabryka Kabli ELPAR with circuit integrity

maintenance classes are classified to classes according to achieved test results of tested cables

at tracks. Other classification is not allowed.

(15)

4.3 FIELD OF APPLICATION

This classification is valid for the following end use applications:

§ throughout the period during which circuit integrity is to be maintained, neighbouring building components shall not have a negative effect on circuit integrity;

§ although testing is only carried out on cables arranged horizontally, test results also apply to cables arranged either diagonally or vertically (e.g. risers), as long as the cable system is supported in transitional areas (i.e. where it switches from a horizontal to a vertical arrangement) in such a manner that the cables will not slip or kink at corners;

§ test results of function in fire test of cables tested at standard supporting construction are also applicable for tested standard supporting construction of other producers;

§ test results of function in fire test of cables tested at standard supporting construction are also applicable for cables of other producers tested at standard supporting construction;

§ maximal length of increasing routing shall be 3500 mm with consistent horizontal placing of cable with minimal length of 300 mm (apart from cable bending) and with maximal spacing of clips of 300 mm, eventually the cables are stabilized by cable transmissions at floor or ceiling with particular fire resistance;

§ for vertical systems, the test results obtained for cables mounted singly on the ceiling using single clips apply. Brackets of proven suitability may also be used, as long as their spacing is equal to that of the single clips tested;

§ results of testing single cables on the ceiling apply also to cables mounted horizontally on walls;

§ results of testing bunched cables on a ladder or tray also apply to support construction attached to a wall. However, such constructions required proof of suitability by means of a test certificate or other document issued by an accredited testing laboratory.

5. LIMITATIONS

This classification document does not represent type approval or certification of the product.

The classification is valid until 16. 04. 2020 provided that the product, field of application and standards and regulations are not changed.

Approved: Signed:

Ing. Štefan Rástocký Bc. Dávid Šubert

leader of the testing laboratory technician of the testing laboratory

Cytaty

Powiązane dokumenty

The element, Cable bearing system BAKS – cable trays, cable ladders, cable mesh trays, cable clips and hangers with accessories (consoles, brackets, supports, etc.) and power

Consoles combined of assembling profile CWP40H22/05 and threaded rods PG M8 fixed to.. ceiling by anchors HKD

Product comprise of cable bearing system BAKS – cable trays, cable ladders, cable mesh trays, cable clips and hangers with accessories (consoles, brackets,

The element, Cable bearing system BAKS – cable trays, cable ladders, cable clips and clamps with accessories (consoles, brackets, supports, hangers, etc.) and

Product comprise of cable bearing system of company BAKS Kazimierz Sielski – cable trays, mesh trays, ladders, cable clamps with accessories (consoles, brackets, supports,

The element, Cable bearing system BAKS – cable trays, cable ladders, cable clips and clamps with accessories (consoles, brackets, supports, hangers, etc.) and

The element comprise of cable bearing system BAKS – cable trays KCOP, cable ladders DGOP, ceiling ledges SDOP with clips UKO1 and clips UDF with accessories (consoles, booms,

§ test results of function in fire test of cables at nonstandard supporting construction are valid only for tested construction with particular tested cable