Geobim for digital building permit process

Learning from a case study in Rotterdam

Noardo, F.; Wu, T.; Arroyo Ohori, K.; Krijnen, T.; Tezerdi, H.; Stoter, J.

DOI

10.5194/isprs-annals-VI-4-W1-2020-151-2020

Publication date

2020

Document Version

Final published version

Published in

ISPRS Annals of the Photogrammetry, Remote Sensing and Spatial Information Sciences

Citation (APA)

Noardo, F., Wu, T., Arroyo Ohori, K., Krijnen, T., Tezerdi, H., & Stoter, J. (2020). Geobim for digital building

permit process: Learning from a case study in Rotterdam. ISPRS Annals of the Photogrammetry, Remote

Sensing and Spatial Information Sciences, 6(4/W1), 151-158.

https://doi.org/10.5194/isprs-annals-VI-4-W1-2020-151-2020

Important note

To cite this publication, please use the final published version (if applicable).

Please check the document version above.

Copyright

Other than for strictly personal use, it is not permitted to download, forward or distribute the text or part of it, without the consent of the author(s) and/or copyright holder(s), unless the work is under an open content license such as Creative Commons. Takedown policy

Please contact us and provide details if you believe this document breaches copyrights. We will remove access to the work immediately and investigate your claim.

(2)

GEOBIM FOR DIGITAL BUILDING PERMIT PROCESS: LEARNING FROM A CASE

STUDY IN ROTTERDAM

F. Noardo1∗, T. Wu1, K. Arroyo Ohori1, T. Krijnen1, H. Tezerdi2, J. Stoter1

13D Geoinformation group, Delft University of Technology, Delft, The Netherlands —

(f.noardo, t.wu, k.ohori, t.f.krijnen, j.e.stoter)@tudelft.nl

2Municipality of Rotterdam, Rotterdam, The Netherlands — h.tezerdi@rotterdam.nl

KEY WORDS: Digital building permit, regulations interpretation, BIM, GeoBIM, Industry Foundation Classes, data integration

ABSTRACT:

Among the digitalization processes which are being raised in Europe and in the world, the building permit process is seen as one of the priorities by municipalities, governmental institutions and standardization organizations. However, in current practice, the building permit issuing as well as the integration of geoinformation with BIM (GeoBIM) suffers from a number of complex sub-issues. These issues still remain and prevent the development of successful methodologies. In this paper, the building permit use case is explored within a project in close collaboration with the municipality of Rotterdam. A very specific case study in Rotterdam was selected as a starting point, which allowed us to develop the needed methodology for the implementation of an effective tool. In this paper we highlight the interpretation and formalization of regulation for building height, overhang and tower ratio. While these rules are specific to a zoning plan in Rotterdam, we believe that the methodology and encountered issues in formalizing the rules, applying the rules on delivered models and integrating various data sources (BIM and GIS specifically) are general to most building codes.

1. INTRODUCTION

With the development of 3D model-related technologies, espe-cially regarding the design of buildings with Building Inform-ation Models (BIMs), and the improvement of digital and web systems, the advantages of automated building permits issuing systems became apparent in many countries. The process can be faster and more objective. In addition, errors and misun-derstanding in the design evaluations and in the interpretation of regulations can be avoided, bringing benefits (included eco-nomic) from the reduced amount of needed resources. Further-more, the built environment can benefit from an automated sys-tem, since more consistent decisions can be taken considering more complex parameters (for example, the whole area can be considered in 3D, instead of having 2D or partial views, which are also limited to what is delivered by applicants for building permits). And a quick turnaround of model check outcomes may result in a more iterative process and a higher quality built environment. Attempts in such a direction are being developed in many countries, starting perhaps with the CORENET e-PlanCheck project in 1995 in Singapore and later in Europe1 (Noardo et al., 2019b) and in the rest of the world. Some stud-ies proposed methods and tools for checking the building regu-lations by means of BIMs (e.g. Kim et al. (2016); Getuli et al. (2017); Choi and Kim (2017); Plazza et al. (2019)) and others considered the integration of BIM and 3D city models (e.g. in Sweden2).

Corresponding author

1 e.g. Sweden, Finland (http://www.aecbytes.com/feature/200

5/CORENETePlanCheck.html https://kirahub.org/en/home/) some municipalities (like Vantaa) in particular, Estonia (https://ae c-business.com/digital-transformation-of-the-estonia n-construction-sector-an-interview-with-jaan-saar/), Germany, United Kingdom (https://www.cdbb.cam.ac.uk), some of which are described in the presentations at https://kirahub.or g/en/wdbe2020/pre-event-2/#presentations

2 https://www.smartbuilt.se/in-english/

A common issue in those previous experiences is taking into ac-count the small specific parts of the process and the challenges given by the use of involved data in a consistent way. Especially when standardised information is involved, as it is sensible for fostering interoperability and re-usability, some further issues could arise, also given by the nature of standards themselves (e.g. Noardo et al. (2020a)). To push even further this interest, the European Directive 2014/24/EU3was published, strongly encouraging the use of BIM for public projects. The result of this is that in many countries from 2018 a process began to-wards the mandatory adoption of BIM, at least for public build-ings, generally to be fulfilled by 2022.

The organizations responsible of single portions of the topic are addressing it internally (for example, see the buildingSMART effort in its Regulatory Room4). However, a synergy of dis-ciplines, expertises and stakeholders are needed to face such multifaceted and complex issue in a thorough way. This goal is being pursued from beginning 2020 within the European Net-work for Digital Building Permit (EUnet4DBP)5(Noardo et al., 2020b).

1.1 The premises to this work: The EuroSDR GeoBIM project and Rotterdam digital city

Furthermore, stakeholders from many European countries, par-ticipated in the EuroSDR GeoBIM project6(2017-2020) aiming at the the development of a coherent approach to the integration of geoinformation with BIM with consensus between multiple 3 https://eur-lex.europa.eu/legal-content/EN/TXT/?uri =celex%3A32014L0024 4 https://www.buildingsmart.org/standards/rooms/regula tory/ 5 https://3d.bk.tudelft.nl/projects/eunet4dbp/ 6 https://3d.bk.tudelft.nl/projects/eurosdr- geobim/

(The Netherlands, Ireland, UK, France, Spain, Switzerland, Slovenia, Poland, Denmark, Finland, Sweden, Norway are involved)

(3)

stakeholders from both the geoinformation and the BIM sides, working at an international level. The automation of the build-ing permit issubuild-ing was one of the use cases of the project (the other being asset and facility management).

In order to provide scalable and shareable methods and tools, international open standards, fostering interoperability were chosen as reference data formats. Therefore, CityGML7 by the Open Geospatial Consortiumand the Industry Foundation Classes (IFC)8by buildingSMARTwere chosen.

The investigation approach in the project, where national map-ping and cadastral agencies (NMCAs), together with some re-search institutes participated, was mainly guided by the applica-tion, starting the investigation with interviewing municipalities operators and analysing current practice workflows (Noardo et al., 2019a)9.The collaboration with the municipality of Rotter-dam started within this context.

Meanwhile, the Rotterdam “Digital city” pilot is on-going, as the effort of the Rotterdam Municipality to transpose proced-ures to a digital integrated environment, able to help the optim-ization of resources and improve the efficiency of management, through integrated information, city monitoring and automatic processes. A part of this is the work towards automation (or semi-automation) of the building permit process, for which a specific project was funded to investigate the specific cases with available data and develop a demonstrator able to be extended and scaled as a support to the building regulation checks.

1.2 Objectives

This paper firstly describes the methodology followed to de-velop the project by starting from concrete cases and data by designers. As a necessary preliminary step, the interpretation and formalization of the considered regulation is explained. In addition, the observations about the use of the geometry repres-ented in the BIM to support the checks of such regulation are outlined.

2. METHODOLOGY

Although a huge discussion is on-going about the building per-mit automation topic, concrete, complete, flexible and scalable solutions are seldom implemented, and remaining issues are still widespread. The methodology we followed was therefore built step by step, with previous steps enabling the unveiling of useful following ones. The big challenge in such a use case, be-sides the multidisciplinarity, is the little development, with re-spect to systematic adoption of criteria and methods to produce and store information, of almost all the premises intended to support their final synergy for checking urban regulations (reg-ulations text, the zoning maps, the 3D city model, the BIMs, the checking procedures).

The approach we adopted was therefore completely bottom-up, starting from the previous investigations and interviews per-formed within the EuroSDR project, to proceed step by step in 7 http://www.citygmlwiki.org

8 http://www.buildingsmart-tech.org/specifications/if

c-overview

9 A harmonised workflow was developed and reviewed by the

part-ners and many municipalities in different countries (https://3d .bk.tudelft.nl/projects/eurosdrgeobim/Workflow Description.pdf) EuroSDR GeoBIM project - Integrated Work-flow using GeoBIM information for building permit process.Zenodo. http://doi.org/10.5281/zenodo.3948493

collaboration with the Municipality officers and from the avail-able data sets.

First step was the selection of 2 specific regulations among the ones that were deemed likely to have the best advantage from GeoBIM: building dimensions and parking places. In this paper the results regarding the dimensions regulation are described. Those regulations were selected, in consultation with Muni-cipality experts, because these were judged to be among the simplest ones to implement. After solving the most straightfor-ward issues for these cases, the work could be further extended more easily.

Moreover, those two regulations were expressed for one spe-cific zone, where a case study was chosen. The selected case study (Section 2.1) lies in the centre of Rotterdam, in the Mar-itiemdistrict, where building works are ongoing and recent sub-missions of building permits were just approved, following the most up-to-date approval procedure.

The specific text of the regulation was analysed with the aim of translating it to a formal language that would be able to be inter-preted by machines. Several studies propose methods to auto-matically interpret the natural language of regulations trans-forming them to code to check the proposed building design, as represented in models (e.g. the UK D-COM activity10). How-ever, challenges appeared long before the conversion of this in-formation from natural language to any formal language, since even for humans, the interpretation of the regulations’ text can be open to a number of different interpretations (see Section 3.1), whilst an effective code should be absolutely unambigu-ous.

A relevant step to solve this was the organization of a specific workshop by the Rotterdam Municipality (H. Tezerdi and R. Manbodh), with the involvement of expert operators usually checking and deciding on building permits themselves, who know by experience how to interpret the main building reg-ulation (the bouwbesluit). The details and meanings of the two chosen regulations were explained and agreed upon and the specific questions we had about ambiguous statements were answered. Some more details arising during the following work towards implementation were asked later. That was the only way to have ambiguities about the regulation solved. This issue already showed how little the current state of regulations lends itself to automation. After that, the regulation could be formal-ised step by step and the related information was extracted from where it was deemed most effective (either in the BIM, in the 3D city model or elsewhere). Only at this point, it was possible to define the sub-issues to be tackled, now appearing sharper. These ones, with related research questions can be listed as:

BIM, and specifically IFC, georeferencing How the geore-ferencing information is currently attached to BIM and how it would be most useful? How to help designers adding georeferencing to BIM? How to make sure it is stored in the correct place in the IFC?

Extraction of the building envelope What elements of the BIM should be considered? Is it possible to use only one of the several IFC models composing the BIM? Can we con-sider spatial structure segmentations, such as storeys and bounding boxes, for approximating the envelope? How can we choose the reference surface and what tolerances 10http://www.dcom.org.uk

(4)

do we consider for generalising the building envelope in a suitable way? And finally, what algorithms can we use and what kind of geometry can be most effective as as in-put/output?

Building envelope segmentation Where should the building envelope be segmented to support the checking of the reg-ulation? What tolerances are to be considered? How to automatically detect the different segments?

Measuring the model to check regulations, using GeoBIM How to obtain the starting point for measuring heights in the 3D city model? How to measure the overlapping area of the two detected parts? How to automatically detect the directions “towards Boompjes” or “towards Heterkade” from the integration of BIM and 3D city model?

As a base to start addressing these issues in a proper way, we should necessarily analyse and work with the specific involved data, besides looking at the standard data models. In fact, since there are few specific prescriptions and criteria about how to model and store specific elements in IFC, we cannot exactly know what to expect from such models. This degree of free-dom could be useful for adapting to different use cases, but actually hinders interoperability, allowing a set of alternatives which are too open for practical purposes. Exactly the same issue is found for CityGML (e.g. where is the height of LoD1 building model?).

Furthermore, other features of the BIM, usually composed by several IFC files, depend on the building design practice itself, and can be different from what an outside person can imagine. For 3D city models, the field is a bit more restrained, but equally open to different choices, which remain unknown, unless good information is available as metadata about modelling choices that were made and reference datasets that were used.

The solution to the permissiveness of IFC and CityGML could be to make the standard itself to be more restrictive, through specific guidelines, or possibly by developing tools to assist in the preparation of the models. The guidelines formulated in this project will be used to rule the modelling of BIMs and 3D city models for the use case. For these reasons, the two examples of BIMs representing the designed, mainly residential, buildings, with a quite good quality, were a great advantage to guide the choices during implementation. They were preventively manu-ally inspected, in order to both understand how to effectively use them and to verify and measure the ground truth, useful to assess the result.

2.1 Case study

In consultation with the Municipality of Rotterdam, we selected the zone “Centrum 3” of the Waterstad bestemmingsplan (des-tination plan) in the centre of Rotterdam (Maritiem district). Within the area, two recently designed buildings were used as the case study for this project: the so-called Peak tower (Figure 1) and the Terrace tower (Figure 2). The two available BIMs were kindly provided in IFC (v.2x3) for the tests.

The Peak tower is composed by structural, architectural and facades models. They are correctly registered together, by means of the same reference point and orientation. They are not georeferenced, though: the reference point coordinates are (0, 0, 0), whilst the attributes in the IfcSite would locate the model in a general location in Amsterdam.

Figure 1. The three IFC models composing the Peak tower BIM, from left to right: structural, architectural and facades.

The Terrace tower BIM is represented by structural and archi-tectural IFC models, plus one representing the context and ele-ments probably belonging to the work site. They are correctly registered together too, and in this case they are also georefer-enced by storing projected coordinates in a point related to the IfcSite, according to a level of georeferencing LoGeoRef 20 (Clemen and Hendrik, 2019).

Figure 2. The three IFC models composing the Terrace tower BIM, clockwise, the structural, the architectural and the context

one.

For the integration, georeferencing is essential. In order to geor-eference these specific models properly, we followed a com-plex manual process, passing through the representation of the model in the city context as delivered in PDF, measuring there the coordinates of common points in the city map and in the BIM plan. This process was successful, but it is definitely not a procedure to be preferred. A reliable solution will be developed with guidelines and assisting reference data and tools.

3. RESULTS

3.1 Regulations interpretation

The regulation considered here is the Waterstadt - Artikel 5 Centrum – 3, specifically, the section 5.2 Building rules - 5.2.3 Building standards11.

11https://www.ruimtelijkeplannen.nl/documents/NL.IMRO.

(5)

The text, here translated to English, is: “The maximum build-ing height is 100 meters, on the understandbuild-ing that it can be realized with a substructure of a maximum of 17 meters high and a construction of a maximum of 50% of the surface of the substructure. At the location of Boompjes 60-68 and Boompjes 55-58, an overhang of 5 meters on the Boompjes side and 10 meters on the Hertekade side is permitted”.

Although being a very short text, when considering it for form-alization, several ambiguities and uncertainties arise, also for human interpretation. For example:

• “The maximum building height is 100 meters” - Where is the 0 to be considered for starting measuring? What ele-ments have to be counted (e.g. if installations or antennas rise above, do they count?)

• “on the understanding that it can be realized with a sub-structure of a maximum of 17 meters high and a construc-tion of a maximum of 50% of the surface of the substruc-ture.”- Do the substructure has a minimum height? If the substructure or the top structure are split in different parts (like multiple towers), do they count as one? Is it allowed? Must the substructure cover the whole parcel? Is any align-ment to be considered? Is the footprint or the outline of the top part to be considered for measuring the overlap? Is the 50% including only the overlapping footprint of the top part or also the area of possible overhangs?

• “At the location of Boompjes 60-68 and Boompjes 55-58, an overhang of 5 meters on the Boompjes side and 10 meters on the Hertekade side is permitted”- How do we detect such locations (are they parcel names, addresses, what else)?

Those were mainly solved during the organised workshop on the 18th October 2019 in Rotterdam Municipality, with the help of the expert Rotterdam municipality officer knowing the rules and performing the checks. Later, further ambiguities could be solved thanks to the continuous collaboration with the Muni-cipality, which was critical for the success of this initial phase.

3.2 Regulation formalization

To allow a more easy conversion to a machine-readable code, the rules stated by the regulation were written in a more formal language according to explanation.

First, the building (B), intended as a whole, has to be con-sidered as the composition of two superimposed parts, i.e. bounding volumes (BP 1 and BP 2), formally defined as B := BP 1 ∪ BP 2, or more in detail:

BP 2xy ∩ BP 1xy AN D min(BP 2z) ≤ max(BP 1z)

Moreover, BP 1 and BP 2 can possibly consist of several dis-connected parts, therefore we should consider:

BP 1 = BP 1a ∪ BP 1b ∪ ... ∪ BP 1n BP 2 = BP 2a ∪ BP 2b ∪ ... ∪ BP 2n

tad-va01.html# 5 Centrum-3

Eventually, it is necessary to consider a different segmentation of the building, in which the portions of BP 2 overhanging from BP 1are detected for calculating the maximum overhang to-wards the two streets (Boompjes and Heterkade) (Figure 3).

Figure 3. Building segmentation to check overlap percentage and overhangs dimensions, where BP 2ol is the part of BP 2 with a footprint overlapping the BP 1 one; BP 2ohB and BP 2ohH are the BP 2 parts with outline overhanging, towards

“Boompjes” and “Heterkade” streets respectively. BP 2 = BP 2ol ∪ BP 2ohB ∪ BP 2ohH

Once defined the different parts we are able to check the dimen-sions according to the regulation.

The ratio between the footprint12area f ootprint.A of the seg-ment of BP 2 overlapping BP 1 (i.e. BP 2ol and the total BP 1 area, has to be lower than 50%. That is:

f ootprint.A(BP 2ol) ≤ 0.5 × f ootprint.A(BP 1).

Moreover, the total building height needs to be lower than 100 m, with starting height according to the rules:

• for a structure, the main entrance of which is adjacent to the road: the height of the road at the top of the road;

• for a building whose main access is not adjacent to the road: the height of the site at the location of that main access, after completion of the construction of that site;

• if a structure is built on more than one road, the level of the highest road is the norm.

Moreover, the minimum height for BP 1 should be 2.6 m, which is not a number explicit from this regulation, but it is im-plied, since being the minimum ceiling height defined by bouw-besluit(the Dutch building codes). We therefore obtain the rule to be checked:

2.6m ≤ Height(BP 1) ≤ 17m.

Finally the maximum outline overhanging of the top part BP 2 with respect to BP 1, in the two directions has to be measured. 12‘footprint’ is the part touching and intersecting the ground (or the

build-ing part below); ‘outline’ of the buildbuild-ing is the maximum extension on xy plane of the maximum envelope of the building, including over-hanging parts and 3D extension.

(6)

We need the information about the parcel address (Boompjes 55-58 and Boompjes 60-68), for which we should rely on an at-tribute in the models. We will come back to this when defining suitable guidelines for (3D city model) modellers.

Figure 4. Dimensions to be checked.

After these detailed definitions, it was possible to begin the work addressing the specific sub-issues involved in the solution of each part (Sections 3.3 - 3.5).

Moreover, it is essential to understand the treated data and where the needed information could be obtained, therefore, an inspection of the models was performed to guide the imple-mentation and guidelines proposal.

3.3 Building envelope extraction

For the dimensions regulation check, we need to consider the envelope of the building. It would be possible to ask the archi-tect to generate it before submission (and trust the information that is provided), but it is preferable if it is automatically gener-ated from the BIM. Since BIMs are usually split in several mod-els, it is necessary to consider all of them together. Moreover, to approximate the shape of the building two solutions could be used:

• minimum (rotated) bounding box (BBB), to understand the orientation w.r.t the 3D city model (e.g. the regulations make reference to street names), maximum height; • building envelope (BE), to calculate dimensions.

However, the extraction of such geometries is not straightfor-ward, since a generalization has to be applied to a very complex surface (even though this facade can appear mostly flat from afar), and a selection of discontinuity is necessary, probably ac-cording to a tolerance, to obtain a suitable envelope (Figure 5).

Figure 5. Close look at the facade: horizontal planes (in red) can all be potentially read as discontinuities of vertical surfaces.

Alternative approaches can be followed for this task, such as using storey attributes13; 2D alpha shapes, 3D alpha shape, and voxelization.

13e.g. https://gist.github.com/aahoo/c97248816510bf9892

a2e8bdf90d1626

Once this is done, we can proceed to the envelope segmenta-tion or measurement, as useful to check the regulasegmenta-tions. Al-ternatively, the minimum bounding box of the building can be calculated from the total envelope if necessary.

3.3.1 Building local systems Before going to the building envelope segmentation, a reasoning about the different kind of needed Cartesian systems is necessary. OM is the origin of the BIM and to which the georeferencing information is associated. In the case of very extended models, more than one OMwill be provided: in that case the model will be split in the different parts, having one OM each. In order to segment the building and check the rules as stated in the regulations (heights, dis-tance, overhangs and so on), it is necessary to refer to different local building Cartesian systems. The local Cartesian system used during the building design is chosen by the architect or engineer according to the design requirements. Therefore it is not straightforward that it is also the best needed for building permits calculations (Figure 6).

Figure 6. CRS for the checks calculations (O, in black) and possible others CRS OM possibly used to attach georeferencing

information. In yellow, the bounding box of the building.

We can instead set two more local Cartesian systems to be used in the calculations (Figure 7):

• The origin (O) of the first one (LocalTotal) can be set in one of the lowest vertexes of the bounding box, with the x and y axis positive directions aligned to the bounding box base and the z axis upward.

• The second one (LocalOutside) is parallel to LocalTotal, but it is translated upward along the z axis, until the origin (OI) leaves at the intersection of the building bounding box with the terrain, for example according to the rules stated in Section 3.2.

Figure 7. The origin of the two Local systems useful for regulation checks: LocalTotal, with origin in O and

LocalOutsitewith origin in Oi.

3.4 Building envelope segmentation

Again, a suitable method to detect horizontal discontinuities in the building envelope has to be chosen.

(7)

After that, it is possible to segment the building envelope ac-cordingly: cut the building envelope in as many parts (P1, P2, . . . , PN, . . . , PM) as the horizontal discontinuities are (Figures 8-9).

Figure 8. Segmentation of the building envelope according to the horizontal discontinuities.

Figure 9. Segmentation of the building envelope of the actual BIM according to the horizontal discontinuities.

In the LocalOutside Reference system:

IF P 1zmax≤ 17m AN D P 2zmin≥ 2.6m T HEN BP 1 = P 1

ELSEIF P 2zmax≤ 17m AN D P 3zmin≥ 2.6m T HEN BP 1 = P 1 + P 2

ELSEIF P Nzmax≤ 17m AN D P N + 1zmin≥ 2.6m T HEN BP 1 = P 1 + P 2 + ... + P N

ELSE −−N OT COM P LIAN T T OREGU LAT ION − −

BP2 ≡ T otalBuildingEnvelope − BP 1 ≡ P (N + 1) + . . . + P M

Looking at the BIM representing the designed building, we can observe that P1 is the only part extending for the whole build-ing, below both the towers leaned on the top of it. In the orange part of Figure 9, representing P1 is 6.89 m high, as measured in the part where the discontinuity with the top parts is visible, and not including the whole ground storey. That would be a bit higher, but is not reflected in the building sections. The follow-ing part, P2 is 16.86 m high Therefore, it could be considered as part of the base. However, P3, which begins at the same level, raises up to 19.9 m, which is more than the allowed 17 meters.

Since in this case the parts are not piling up one on the top of the other one, it is more difficult to check the rules with the previous equations. The easiest and probably most sensible choice in this case could be to separate the towers from the base. Therefore, we can consider P1 as BP 1 in this case and the two towers be-ing BP 2. In similar cases, the software should be able to recog-nize when all the building parts (and, consequently, elements)

on the same level are contiguous (they are a unique building part) or they are separated in more than one part.

For the segmentation, we should exclude the facade articula-tions (overhangs and recesses) being smaller than a tolerance. For example, almost at the border between P1 and P2, but with this segmentation, completely fitting within P2, there is a small change in the facade surface, protruding 8 cm more towards the exterior in the top part. However, this is a negligible change, not worth a cut in the building. The further protruding or re-cessing parts of the building, that deserve to be considered as vertical discontinuity, are in the order of approximately 3.5 m. Therefore, we could set the tolerance to either an absolute value (e.g. 1 meter, that would measure 0.5 cm in a scale 1:200 pa-per drawing, or 0.5 meter to be more inclusive), or maybe to a percentage of the building horizontal extent (for example 5% or 10%). This should be further discussed with the municipality officers.

An approximated option could be considering the difference between storeys footprint (or overlay) coordinates, possibly choosing a threshold to assess if such a difference is worth the detection of a discontinuity. For example, a percentage with re-spect to the total lenght of a floor could be chosen (e.g. if the difference is less than 5% they are part of the same segment).

However, to rely on one footprint per storey would lead to the exclusion of possible protruding parts above or below the sec-tion height, although it can be useful to intensec-tionally exclude specific objects, such as balconies.

This opens up the discussion to a further point, i.e. the possible selection of the elements to be included or not in the relevant envelope. The balconies are a typical case.

3.5 Checking the building dimensions

At this point, it would be possible to check the regulation, split in its different parts.

First, it has to fit in the parcel. Therefore, considering the BP1 envelop in the georeferenced system:

georef M axOutlineBP 1 ⊆ georef M axOutlineP arcel

Second, the overlapping area of the two building parts is given by:

BP 2bottomf aceAreaoverlappingBP 1 ≤

0.5 ∗ AreaBP 1topf ace

Finally, we should calculate the maximum height (in the Loc-alOutsideReference system: BP 2 zmax ≤ 100m

The tolerances to the rule can be considered 0.5 meters (in the case it is required for an architecturally responsible rounding off the top construction layer or roof / sloping roof surface) considering the Article 19.1 “General derogation rules - Devi-ation from permitted architectural height, whilst if the building height exceed of no more of 5 meter, the system could give a warning for the case being assessed by a commission possibly deciding for the exemption allowed by the Article 19.2 ”Gen-eral derogation rules - Deviation from permitted construction height technique”14. The city objects useful for the calculation 14https://www.ruimtelijkeplannen.nl/documents/NL.IMRO.

0599.BP1054Waterstad-va01/r NL.IMRO.0599.BP1054Waters tad-va01.html# 19 Algemeneafwijkingsregels

(8)

are provided in the 3D city model and other possible geoinform-ation, eventually modified according to the elements provided in the BIM model (e.g. IfcSite). We assume that if the terrain is considerably changed, the design is provided in the BIM, hav-ing borders correctly aligned with existhav-ing, 3D city model, so that it could be easily substituted without complex and point-less data fusion processing. As measured in Revit, the max-imum height, considering the entrance door towards Boompjes is 103.47 m and 106.20 m starting from the entrance towards Heterkade. Considering the BIM design, the last storey is com-pletely over the limit. However, it is entirely dedicated to in-stallations; for this reason the exemption foreseen by the Article 19.2 can be applied and the design be approved anyway, with the 0 should be set at the entrance towards Boompjes, which is the highest one. Actually, one more check should be neces-sary, considering the road elevation adjacent to such entrance, instead of the entrance itself.

3.5.1 Calculating overhangs Several steps are finally ne-cessary for the measurement of overhangs. First, it is nene-cessary to find out if the parcel is Boompjes 60-68 or Boompjes 55-58. Considering the BP 1 envelop in the georeferenced system, a corresponding attribute value of the parcel within which it lies can be read (assuming that this information is stored there), de-termining if the rule applies.

The second step is finding out which are the faces (out of the six of the oriented bounding boxes) in the direction ‘towards Boompjes’ and which ‘towards Heterkade’: Considering the georeferenced oriented bounding boxes of BP 1 and BP 2, find, for each of them, the faces BP XtB and BP XtH by calculat-ing, as alternative options:

• For each P (P 1, P 2, ..., P N, ..., P M ) which is the face whose normal positive direction meets each of the two streets (or virtual continuation of them);

• Intersection between a line by FaceCenter+FaceNormal intersected (2d) with wall axis and distance with FaceCen-ter.

In this way we find which is the face oriented towards each street for each part: P 1tB (P 1 face towards Boompjes), P 2tB, . . . , P N tB, . . . , P M tB) P 1tH (P 1 face towards Het-erkade), P 2tH, . . . , P N tH, . . . , P M tH) (Figure 10).

Figure 10. BP 1 and BP 2 bounding boxes, normals and streets.

Third step is the measurements of the overhangs.

We consider the oriented bounding box of BP 2 and the ori-ented bounding box of BP 1 in the LocalTotal or the LocalOut-sidereference system.

BP 1tB, BP 2tB and BP 1tH, BP 2tH define the maximum extension of BP 1 and BP 2 toward Boompjes and toward Het-erkade respectively; BP 1P is each P included in BP 1.

The calculation of BP 1tB (and similar for the other parts BP 2tB, BP 1tH, BP 2tH) is:

IF Boompjes is met in positive direction of LocalOut-side CRS y axis

T HEN BP 1tB = BP 1P tBy.max15

ELSEIF Boompjes is met in negative direction of Loc-alOutside CRS y axis

T HEN BP 1tB = BP 1P tBy.min

ELSEIF Boompjes is met in positive direction of Loc-alOutside CRS x axis

T HEN BP 1tB = BP 1P tBx.max

ELSEIF Boompjes is met in negative direction of Loc-alOutside CRS x axis

T HEN BP 1tB = BP 1P tBx.min

Now the overhang towards Boompjes can be checked:

|BP 1tB − BP 2tB| ≤ 5m

Considering the ground truth as measured in Revit, the max-imum overhang towards Boompjes is 5 m, therefore, the regu-lation should result as approved.

And the same towards Heterkade:

|BP 1tH − BP 2tH| ≤ 10m

Considering the ground truth as measured in Revit, the max-imum overhang towards Heterkade is 9 m, therefore, the regu-lation should result as approved.

3.6 The resulting tool

The explained concepts guided the initial implementation of a tool16that starts from the IFC files to support the checks. Other issues had to be tackled before arriving to the implementation, but the work described in this paper was the essential start-ing point for the tool to be effective with real-world data about design-related BIM and regulations.

4. DISCUSSION

The issue of automatic regulation checking appears as a series of nested challenges, which can only be detected or disclosed if very closely investigated. For this reason, the choice of pro-ceeding from a specific case study revealed to be a fruitful ap-proach, even though at first sight is could seem lacking scalab-ility. For example, other regulations will present different chal-lenges; notwithstanding this, the reflection about how to con-sider the geometry represented in the BIM and the solutions found for extracting it or its relevant parts is a step likely regard-ing a big part of the cases, to which the solutions can be adapted after little changes in the otherwise solid procedure. The rep-resentation of geometry in the BIM will be very similar in all the cases as well. It makes, for example, the reasoning about the necessary generalizations relevant (e.g. what are the toler-ances to be considered when distinguishing between different elements or parts of the building).

15i.e. The maximum y value of the faces detected towards Boompjes

among all the parts composing BP1.

(9)

The resulting single detailed steps could appear as more chal-lenging than a simplified but faster solution (e.g. checking if the building fits into a box having maximum dimensions). How-ever, solving this actually makes the basis for scaling up the project, and it shows how such systems can actually align with the municipality current practice. In addition, the strict collab-oration with municipality officers allows correct results to be obtained and should be a central part of any similar study.

Beyond the limitations of this study, some more general chal-lenges are present, which were partially pointed out in this pa-per: first of all the ambiguity in regulations, the difficulty in their interpretation and the existence of several different regu-lations about similar parameters, coming from different fields. The still suboptimal interoperability of BIM models (and other involved geoinformaton) is another issue, due to the imple-mentation of standards, standards themselves and followed best practices.

Although such hindrances are present, the automation of at least some steps of the building permit process would allow a higher efficiency in the planning procedures: the saved resources could be effectively re-invested in the current flaws of the system (e.g. difficulty in managing the high number of requests, careful in-spection of the most tricky or borderline cases, management of exemptions, focus on the cases where human judgement is ne-cessary).

The implemented demonstrator could be further refined, for ex-ample to overcome the lacks and inaccuracies in the models, but it already represents a good base to deal with the information in the IFC files.

5. CONCLUSIONS

The paper presents the work developed for implementing a tool and a methodology able to support the municipality of Rotter-dam in building permits regulation checks by means of digital solutions, starting from digital standardised datasets (mainly BIM in IFC). The approach was completely bottom-up, starting from a very specific case study (one regulation and few data-sets). This allowed the explication of several sub-issues which need to be overcome before solving the most apparent steps in the building permit workflow. Addressing them could allow the formulation of guidelines for all the involved data providers (regulations, BIM, 3D city models and so on) and the imple-mentation of a demonstrator, still in an initial state, but prom-ising to be improved and scaled for actually supporting the mu-nicipality in the building permit task.

Future directions regard the specific analysis of the available IFC files to understand specific features, current practices, fre-quent limitations or inaccuracies. This will guide safer choices while implementing the tool. In addition, guidelines could be provided to produce more suitable models and avoid inconsist-encies or inaccuracies. In addition, alternative algorithms could be tested for various steps, such as the detection of the most useful exterior facade geometry to support the checks. The ex-tension of the research and tool to the check of other regulations or to other parts of the city would be an additional interesting work, as well as a wider collaboration with planners, municip-ality officers and designers.

ACKNOWLEDGEMENTS

This project was funded by the Municipality of Rotterdam (resp. Hasim Tezerdi and Rosen Manbodh). This project has also received funding from the European Research Council (ERC) under the European Union’s Horizon2020 Research & Innovation Programme (grant agreement no. 677312, Urban modelling in higher dimensions, and Marie Skłodowska-Curie grant agreement No. 707404, Multisource Spatial data Integra-tion for smart City ApplicaIntegra-tions).

References

Choi, J. and Kim, I., 2017. Development of rule-based build-ing code compliance checkbuild-ing system for bbased quality im-provement. International Information Institute (Tokyo). Inform-ation20(4B), pp. 2929–2936.

Clemen, C. and Hendrik, G., 2019. Level of georeferencing (logeoref) using ifc for bim. Journal of Geodesy (10), pp. 15– 20.

Getuli, V., Ventura, S. M., Capone, P. and Ciribini, A. L., 2017. Bim-based code checking for construction health and safety. Procedia engineering196, pp. 454–461.

Kim, I., Jang, J. and Choi, J., 2016. Development of pre-specification for bim-based automated building code check-ing. Korean Journal of Computational Design and Engineering 21(1), pp. 31–41.

Noardo, F., C. Ellul, C., Harrie, L., Overland, I., Shariat, M., Ohori, K. A. and Stoter, J., 2019a. Opportunities and challenges for geobim in europe: developing a building permits use-case to raise awareness and examine technical interoperability chal-lenges. Journal of Spatial Science.

Noardo, F., Ellul, C., Arroyo Ohori, K., Biljecki, F., Harrie, L., Krijnen, T., Kokla, M. and Stoter, J., 2020a. The ISPRS-EuroSDR GeoBIM benchmark 2019. In: ISPRS Congress 2020, ISPRS - International Archives of the Photogrammetry, Remote Sensing and Spatial Information Sciences, ISPRS.

Noardo, F., Ellul, C., Harrie, L., , Devys, E., Arroyo Ohori, K., Olsson, P. and Stoter, J., 2019b. EuroSDR GeoBIM Project a Study in Europe on how to use the Potentials of BIM and Geo Data in Practice. In: 14th 3D GeoInfo Conference 2019, ISPRS - International Archives of the Photogrammetry, Remote Sensing and Spatial Information Sciences, Vol. XLII-4number W15, ISPRS, pp. 53–60.

Noardo, F., Malacarne, G., Mastrolembo Ventura, S., Tagliabue, L., Ciribini, A., Ellul, C., Guler, D., Harrie, L., Senger, L., Waha, A. and Stoter, J., 2020b. Integrating expertises, goals and data for digital building permits - the EUnet4DBP. In: 15th 3D GeoInfo Conference 2020, ISPRS - International Archives of the Photogrammetry, Remote Sensing and Spatial Informa-tion Sciences, Vol. XLII-4number W15, ISPRS, pp. 53–60.

Plazza, D., R¨ock, M., Malacarne, G., Passer, A., Marcher, C. and Matt, D., 2019. Bim for public authorities: Basic research for the standardized implementation of bim in the building per-mit process. In: IOP Conference Series: Earth and Environ-mental Science, Vol. 323number 1, IOP Publishing, p. 012102.

Cytaty

Powiązane dokumenty

Analizując transatlantyckie stosunki gospodarcze nie można po­ minąć znaczenia, jakie miało dla nich rozszerzenie Unii o 10 nowych państw w 2004 r. Oficjalnie rząd Stanów

In clear cell carcinoma, accounting for 5% of ovarian cancers, atherothrombotic incidents tend to occur 2.5 times more frequently.. Clear cell carcinoma is diagnosed

In Prose Refutations I3, Ephraim turns against heretics: in the introduction to the second discourse To Hypatius4, the names of Mani, Marcion and Bar­ daisan are

[r]

Athough little is known of life on the ocean floor, it most likely exists, even in places where it was thought not possible (as with the life forms around Black Smokers). Athough

Nasza prawdziwie autentyczna tradycja, którą w pełni dzielimy z naszy- mi prawosławnymi braćmi, uczy nas, że język piękna oddany na służbę wiary zdolny jest dotrzeć do

This new recursive sequential multivariate B-splines method, called the RS-MVSB method, enables the online identification of large scale nonlinear aerodynamic models which are at

Otwarcie Kongresu odbyło się w nowoczesnej Sali Kongresowej, a zebrania sekcyjne miały miejsce w gmachu Wydziału Filozoficznego w Zagrzebiu. Na posiedzeniu