• Nie Znaleziono Wyników

Cable bearing system BAKS with power and communication cables of ELKOND HHK, a.s.

N/A
N/A
Protected

Academic year: 2021

Share "Cable bearing system BAKS with power and communication cables of ELKOND HHK, a.s. "

Copied!
10
0
0

Pełen tekst

(1)

FUNCTION IN FIRE EXPERT JUDGEMENT REPORT WITH CLASSIFICATION FIRES-JR-098-14-NURE

Cable bearing system BAKS with power and communication cables of ELKOND HHK, a.s.

This is an electronic version of a classification report which was made as a copy of classification report officially issued in a paper form. The electronic version of a classification report shall be used only for informative purpose. Any information listed in this classification report is the property of the sponsor and shall not be used or published without written permission. Contents of this file may only be modified by the editor i.e.

FIRES, s.r.o., Batizovce. Sponsor is allowed to publish this classification report in parts only with written permission of the editor.

FIRES 004/S2-20/12/2012-E-el

(2)

FUNCTION IN FIRE EXPERT JUDGEMENT REPORT WITH CLASSIFICATION IN ACCORDANCE WITH DIN 4102-12: 1998-11

FIRES-JR-098-14-NURE

FIRES 149/S-28/03/2014-E FIRES, s.r.o., Osloboditeľov 282, 059 35 Batizovce, Slovak Republic tel. 00421 52 775 22 98, fax. 00421 52 788 14 12, www.fires.sk

Name of the product: Cable bearing system BAKS with power and communication cables of ELKOND HHK, a.s.

Sponsor: BAKS Kazimierz Sielski ul. Jagodne 5

05 - 480 Karczew Poland

Prepared by: FIRES, s.r.o.

Approved Body No. SK01 Osloboditeľov 282

059 35 Batizovce Slovak Republic

Task No.: PR-14-0438 Date of issue: 03. 02. 2015

Reports: 5

Copy No.: 2

Distribution list:

Copy No. 1 FIRES, s. r. o., Osloboditeľov 282, 059 35 Batizovce, Slovak Republic (electronic version)

Copy No. 2 BAKS Kazimierz Sielski, ul. Jagodne 5, 05 - 480 Karczew, Poland (electronic version)

Copy No. 3 ELKOND HHK, a.s., Oravická 1228, Trstená 028 01, Slovak Republic (electronic version)

Copy No. 4 BAKS Kazimierz Sielski, ul. Jagodne 5, 05-480 Karczew, Poland

Copy No. 5 ELKOND HHK, a.s., Oravická 1228, Trstená 028 01, Slovak Republic

(3)

FIRES-JR-098-14-NURE

FIRES 149/S-28/03/2014-E Page: 2/9

1. INTRODUCTION

This expert judgement report with classification defines the function in fire classification assigned to element „Cable bearing system BAKS with power and communication cables of ELKOND HHK, a.s.” in accordance with the classes given in DIN 4102-12: 1998-11.

This test was carried out according to standard STN 92 0205: 2012 and meets requirements of DIN 4102-12: 1998-11. Basic deviation in process and carrying out of test between these standards is in measuring and in control of temperature in the test furnace. According to STN 92 0205: 2012, plate thermometers according to EN 1363-1 are used. According to DIN 4102-12: 1998-11, common thermocouples of construction which was used for this measurement till issue of EN 1363-1 are used.

Measurement by plate thermometers acc. to EN 1363-1 can be considered as stricter method of temperature control in test furnace in compare with thermocouples used till issue of EN 1363-1. Therefore, it is possible to use results of test according to STN 92 025: 2012 for classification of tested cables according to DIN 4102-12: 1998-11, but not conversely.

This expert judgement report defines field of application which is outside the field of direct application according test standard or outside the field of extended application according to relevant extended application standard. This expert judgement expresses the opinion of the FIRES and is based on the experience or internal rules of FIRES.

2. DETAILS OF CLASSIFIED PRODUCT 2.1 GENERAL

The element, Cable bearing system BAKS – cable trays, cable ladders, cable mesh trays, cable clips and clamps with accessories (consoles, brackets, assembling profiles, etc.) and power and communication halogen free cables of company ELKOND HHK, a.s. with circuit integrity maintenance classes.

2.2 PRODUCT DESCRIPTION

Product comprise of cable bearing system BAKS – cable trays, cable ladders, cable mesh trays, cable clips and clamps with accessories (consoles, brackets, assembling profiles, etc.) and power and communication halogen free cables of company ELKOND HHK, a.s. with circuit integrity maintenance classes.

Cable trays

Cable trays type KGJ/KGOJ…H60 are made from steel sheet thickness 0,9 mm.

Cable trays type KGL/KGOL…H60 are made from steel sheet thickness 0,7 mm.

Cable trays type KFL…H60 are made from steel sheet thickness 0,7 mm.

Trays are connected together and fixed by nut bolts (SGK M6x12). Trays are used as a bearing system for the cables.

Cable trays type KCP/KCOP…H60 are made from steel sheet thickness 1,5 mm. Trays are jointed together by two junctions (LPP/LPOPH60 - steel sheet 1,5 mm thick) on sides and by junction (BL/BLO…

- steel sheet 1,0 mm thick) on the bottom and with screws (SGK M6x12).

Cable mesh trays

Cable trays type KDS/KDSO…H60 are made from steel wire ∅ 4,0 – 4,5 mm. Mesh trays are jointed together by junctions (USSN/USSO).

Mesh trays are used as bearing system for the cables.

Cable ladders

Cable ladders type DGOP…H60N are made from steel sheet thickness 1,5 mm and spacing of transoms is 150 mm. Ladders are jointed together by two junctions (LDC/LDOCH60 - steel sheet 1,5 mm thick) on sides and by screws (SGK M8x14).

Cable ladders are used as bearing system for the cables.

(4)

Cable clips

Single cable clips UDF are made of steel sheet 1,2 mm thick.

Cable clips are used for fixing of cables directly to wall or ceiling.

Cable hangers

Cable hangers OZ/OZO are made of steel sheet thickness 1,5 mm.

Cable hangers OZS/OZSO and OZM/OZMO are made of steel sheet thickness 0,7 mm.

Cable hangers are used for fixing of cables to wall or ceiling.

Brackets

Brackets type WWS/WWSO… are made from steel sheet thickness 2,0 mm.

Brackets are used to gripping trays or ladders to ceiling or to wall.

Consoles

Consoles type WPCB… are made from steel sheet thickness 5,0 mm (base of console) and 2,0 mm (part for installation of brackets).

Accessories

Assembling profiles CWP40H22/… and CWP/CWOP40H40/… are made of steel sheet thickness 1,5 mm.

Trapezoidal hangers WT/WTO120 are made of steel sheet thickness 2,5 mm.

Used cables by test:

Power cables:

1-CXKH-V 4x1,5 RE P90-R B2

ca

-s1,d0,a1 (36x) 1-CXKH-V 4x10 RE P90-R B2

ca

-s1,d0,a1 (36x)

NHXH-J 4x1,5 RE FE180/E90 (4x)

NHXH-J 4x10 RE FE180/E90 (4x)

NHXH-J 4x1,5 RE FE180/E90 P (4x)

NHXH-J 4x10 RE FE180/E90 P (4x)

Communication cables:

SHXKFH-V180 1x2x0,8 Lg P90-R B2

ca

-s1,d1,a1 (30x) JE-H(St)H 1x2x0,8 Bd FE180/PS90 B2

ca

-s1,d1,a1 (14x) JE-H(St)H 1x2x0,8 Bd FE180/PS60 (4x)

The length of cables was 5,2 m and 4,0 m from that was exposed to fire.

More detailed information about product construction is shown in the drawings which form an integral part of test report [1]. Drawings were delivered by sponsor.

3. TEST REPORTS AND EXTENDED APPLICATION REPORTS IN SUPPORT OF CLASSIFICATION 3.1 TEST REPORTS AND EXTENDED APPLICATION REPORTS

No. Name of

laboratory Name of sponsor Test report No. Date of the

test Test method [1] FIRES, s.r.o.,

Batizovce, SR

BAKS Kazimierz Sielski, 05 - 480 Karczew, Poland

FIRES-FR-

225-14-AUNE 27. 11. 2014 STN 92 0205

(5)

FIRES-JR-098-14-NURE

FIRES 149/S-28/03/2014-E Page: 4/9

3.2 TEST RESULTS

No./

Test method

Specimen

No. Cables Track

No.

Time to first failure / interruption of conductor

[1]

STN 92 0205

1 2 cables NHXH-J 4x10 RE FE180/E90 P

16

41 minutes

2 2 cables NHXH-J 4x1,5 RE FE180/E90 P 48 minutes

3 2 cables 1-CXKH-V 4x10 RE P90-R B2ca-s1,d0,a1 90 minutes no failure / interruption 4 2 cables 1-CXKH-V 4x1,5 RE P90-R B2ca-s1,d0,a1 90 minutes no failure / interruption 5 2 cables NHXH-J 4x1,5 RE FE180/E90 P

15 71 minutes

6 2 cables NHXH-J 4x10 RE FE180/E90 P 64 minutes

7 2 cables 1-CXKH-V 4x10 RE P90-R B2ca-s1,d0,a1

21 90 minutes no failure / interruption 8 2 cables 1-CXKH-V 4x1,5 RE P90-R B2ca-s1,d0,a1 90 minutes no failure / interruption 9 2 cables NHXH-J 4x1,5 RE FE180/E90

14

90 minutes no failure / interruption 10 2 cables NHXH-J 4x10 RE FE180/E90 90 minutes no failure / interruption 11 2 cables 1-CXKH-V 4x1,5 RE P90-R B2ca-s1,d0,a1 90 minutes no failure / interruption 12 2 cables 1-CXKH-V 4x10 RE P90-R B2ca-s1,d0,a1 90 minutes no failure / interruption 13 2 cables NHXH-J 4x1,5 RE FE180/E90

13

90 minutes no failure / interruption 14 2 cables NHXH-J 4x10 RE FE180/E90 90 minutes no failure / interruption 15 2 cables 1-CXKH-V 4x10 RE P90-R B2ca-s1,d0,a1 90 minutes no failure / interruption 16 2 cables 1-CXKH-V 4x1,5 RE P90-R B2ca-s1,d0,a1 90 minutes no failure / interruption 17 2 cables 1-CXKH-V 4x1,5 RE P90-R B2ca-s1,d0,a1

20 90 minutes no failure / interruption 18 2 cables 1-CXKH-V 4x10 RE P90-R B2ca-s1,d0,a1 90 minutes no failure / interruption 19 2 cables 1-CXKH-V 4x10 RE P90-R B2ca-s1,d0,a1

12 90 minutes no failure / interruption 20 2 cables 1-CXKH-V 4x1,5 RE P90-R B2ca-s1,d0,a1 90 minutes no failure / interruption 21 2 cables 1-CXKH-V 4x10 RE P90-R B2ca-s1,d0,a1

11 90 minutes no failure / interruption 22 2 cables 1-CXKH-V 4x1,5 RE P90-R B2ca-s1,d0,a1 90 minutes no failure / interruption 23 2 cables 1-CXKH-V 4x1,5 RE P90-R B2ca-s1,d0,a1

10 90 minutes no failure / interruption 24 2 cables 1-CXKH-V 4x10 RE P90-R B2ca-s1,d0,a1 90 minutes no failure / interruption 25 2 cables 1-CXKH-V 4x1,5 RE P90-R B2ca-s1,d0,a1

8 90 minutes no failure / interruption 26 2 cables 1-CXKH-V 4x10 RE P90-R B2ca-s1,d0,a1 90 minutes no failure / interruption 27 2 cables 1-CXKH-V 4x10 RE P90-R B2ca-s1,d0,a1

6

90 minutes no failure / interruption 28 2 cables 1-CXKH-V 4x1,5 RE P90-R B2ca-s1,d0,a1 90 minutes no failure / interruption 29 2 cables 1-CXKH-V 4x10 RE P90-R B2ca-s1,d0,a1

5

90 minutes no failure / interruption 30 2 cables 1-CXKH-V 4x1,5 RE P90-R B2ca-s1,d0,a1 90 minutes no failure / interruption 31 2 cables 1-CXKH-V 4x10 RE P90-R B2ca-s1,d0,a1

19 90 minutes no failure / interruption 32 2 cables 1-CXKH-V 4x1,5 RE P90-R B2ca-s1,d0,a1 90 minutes no failure / interruption 33 2 cables 1-CXKH-V 4x10 RE P90-R B2ca-s1,d0,a1

4 90 minutes no failure / interruption 34 2 cables 1-CXKH-V 4x1,5 RE P90-R B2ca-s1,d0,a1 90 minutes no failure / interruption 35 2 cables 1-CXKH-V 4x10 RE P90-R B2ca-s1,d0,a1

3 90 minutes no failure / interruption 36 2 cables 1-CXKH-V 4x1,5 RE P90-R B2ca-s1,d0,a1 90 minutes no failure / interruption 37 2 cables 1-CXKH-V 4x10 RE P90-R B2ca-s1,d0,a1

18 90 minutes no failure / interruption 38 2 cables 1-CXKH-V 4x1,5 RE P90-R B2ca-s1,d0,a1 90 minutes no failure / interruption 39 2 cables 1-CXKH-V 4x10 RE P90-R B2ca-s1,d0,a1

2 90 minutes no failure / interruption 40 2 cables 1-CXKH-V 4x1,5 RE P90-R B2ca-s1,d0,a1 90 minutes no failure / interruption 41 2 cables 1-CXKH-V 4x10 RE P90-R B2ca-s1,d0,a1

1 90 minutes no failure / interruption 42 2 cables 1-CXKH-V 4x1,5 RE P90-R B2ca-s1,d0,a1 90 minutes no failure / interruption 43 2 cables 1-CXKH-V 4x1,5 RE P90-R B2ca-s1,d0,a1

17 85 minutes

44 2 cables 1-CXKH-V 4x10 RE P90-R B2ca-s1,d0,a1 90 minutes no failure / interruption

(6)

No./

Test method

Specimen

No. Cables Track

No.

Time to first failure / interruption of conductor

[1]

STN 92 0205

52 2 cables JE-H(St)H 1x2x0,8 Bd FE180/PS90 B2ca-s1,d1,a1 15

90 minutes no failure / interruption 53 2 cables SHXKFH-V180 1x2x0,8 Lg P90-R B2ca-s1,d1,a1 90 minutes no failure / interruption 54 2 cables JE-H(St)H 1x2x0,8 Bd FE180/PS60 90 minutes no failure / interruption 55 2 cables JE-H(St)H 1x2x0,8 Bd FE180/PS60

14

47 minutes

56 2 cables JE-H(St)H 1x2x0,8 Bd FE180/PS90 B2ca-s1,d1,a1 90 minutes no failure / interruption 57 2 cables SHXKFH-V180 1x2x0,8 Lg P90-R B2ca-s1,d1,a1 90 minutes no failure / interruption 58 2 cables JE-H(St)H 1x2x0,8 Bd FE180/PS90 B2ca-s1,d1,a1 13 66 minutes

59 2 cables JE-H(St)H 1x2x0,8 Bd FE180/PS90 B2ca-s1,d1,a1

20 75 minutes

60 2 cables SHXKFH-V180 1x2x0,8 Lg P90-R B2ca-s1,d1,a1 90 minutes no failure / interruption 61 2 cables SHXKFH-V180 1x2x0,8 Lg P90-R B2ca-s1,d1,a1 12 90 minutes no failure / interruption 62 2 cables SHXKFH-V180 1x2x0,8 Lg P90-R B2ca-s1,d1,a1 11 90 minutes no failure / interruption 63 2 cables SHXKFH-V180 1x2x0,8 Lg P90-R B2ca-s1,d1,a1 9 90 minutes no failure / interruption 64 2 cables SHXKFH-V180 1x2x0,8 Lg P90-R B2ca-s1,d1,a1 7 90 minutes no failure / interruption 65 2 cables SHXKFH-V180 1x2x0,8 Lg P90-R B2ca-s1,d1,a1 6 90 minutes no failure / interruption 66 2 cables SHXKFH-V180 1x2x0,8 Lg P90-R B2ca-s1,d1,a1 5 90 minutes no failure / interruption 67 2 cables SHXKFH-V180 1x2x0,8 Lg P90-R B2ca-s1,d1,a1 19 90 minutes no failure / interruption 68 2 cables SHXKFH-V180 1x2x0,8 Lg P90-R B2ca-s1,d1,a1 4 90 minutes no failure / interruption 69 2 cables SHXKFH-V180 1x2x0,8 Lg P90-R B2ca-s1,d1,a1 3 90 minutes no failure / interruption 70 2 cables JE-H(St)H 1x2x0,8 Bd FE180/PS90 B2ca-s1,d1,a1

18

83 minutes

71 2 cables SHXKFH-V180 1x2x0,8 Lg P90-R B2ca-s1,d1,a1 90 minutes no failure / interruption 72 2 cables SHXKFH-V180 1x2x0,8 Lg P90-R B2ca-s1,d1,a1

2

90 minutes no failure / interruption 73 2 cables JE-H(St)H 1x2x0,8 Bd FE180/PS90 B2ca-s1,d1,a1 31 minutes

74 2 cables SHXKFH-V180 1x2x0,8 Lg P90-R B2ca-s1,d1,a1

1 90 minutes no failure / interruption 75 2 cables JE-H(St)H 1x2x0,8 Bd FE180/PS90 B2ca-s1,d1,a1 90 minutes no failure / interruption

[1] The fire test was discontinued in 94

th

minute at the request of test sponsor.

Specimens S1 – S44 were tested by three-phase voltage supply 3 x 230/400V with bulbs 240V / 60 W.

Specimens S52 – S75 were tested by one-phase voltage supply 1 x 110V with LED diodes 3V /0,03W.

Circuit breakers with rating 3 A were used.

(7)

FIRES-JR-098-14-NURE

FIRES 149/S-28/03/2014-E Page: 6/9

4. CLASSIFICATION AND FIELD OF APPLICATION 4.1 REFERENCE OF CLASSIFICATION

This classification has been carried out in accordance with clause 3.2 of DIN 4102 – 12:1998-11.

4.2 CLASSIFICATION ACCORDING TO STN 92 0205:2012

Cable Type of tested cable, single cross-

sections and number of conductors Arrangement

Classification for type of tested cable

(by cross-sections and number of

conductors)

Classification for cable

1-CXKH-V P90-R B2ca-s1,d0,a1

1-CXKH-V 4x1,5 RE P90-R B2ca-s1,d0,a1

Cable trays KGL/KGOL300H60.

Consoles WPCB1000 reinforced by spacer BR40, brackets WWS/WWSO300.

Loading 10kg.m-1. Consoles in spacing of 1500 mm.

Track No. 1.

E 90 n x ≥1,5 – 10 mm2 n ≥ 2 E 90 1-CXKH-V 4x10 RE P90-R

B2ca-s1,d0,a1 E 90

SHXKFH-V180 P90-R B2ca-s1,d1,a1

SHXKFH-V180 1x2x0,8 Lg P90-R

B2ca-s1,d1,a1 E 90

n x 2 x ≥ 0,8 mm n ≥ 1 E 90 JE-H(St)H

FE180/PS90 B2ca-s1,d1,a1

JE-H(St)H 1x2x0,8 Bd FE180/PS90

B2ca-s1,d1,a1 E 90

n x 2 x ≥ 0,8 mm n ≥ 1 E 90

1-CXKH-V P90-R B2ca-s1,d0,a1

1-CXKH-V 4x1,5 RE P90-R B2ca-s1,d0,a1

Cable mesh trays KDS/KDSO300H60.

Consoles WPCB1000 reinforced by spacer BR40, brackets WWS/WWSO300.

Loading 10kg.m-1. Consoles in spacing of 1500 mm.

Track No. 2.

E 90 n x ≥1,5 – 10 mm2 n ≥ 2 E 90 1-CXKH-V 4x10 RE P90-R

B2ca-s1,d0,a1 E 90

SHXKFH-V180 P90-R B2ca-s1,d1,a1

SHXKFH-V180 1x2x0,8 Lg P90-R

B2ca-s1,d1,a1 E 90

n x 2 x ≥ 0,8 mm n ≥ 1 E 90 JE-H(St)H

FE180/PS90 B2ca-s1,d1,a1

JE-H(St)H 1x2x0,8 Bd FE180/PS90

B2ca-s1,d1,a1 E 30

n x 2 x ≥ 0,8 mm n ≥ 1 E 30

1-CXKH-V P90-R B2ca-s1,d0,a1

1-CXKH-V 4x1,5 RE P90-R B2ca-s1,d0,a1

Cable trays KGJ/KGOJ400H60.

Consoles WPCB100, brackets WWS/WWSO400,

holders UPW/UPWO, threaded rods PG M10.

Loading 20kg.m-1. Consoles in spacing of 1500 mm.

Track No. 3.

E 90 n x ≥1,5 – 10 mm2 n ≥ 2 E 90 1-CXKH-V 4x10 RE P90-R

B2ca-s1,d0,a1 E 90

SHXKFH-V180 P90-R B2ca-s1,d1,a1

SHXKFH-V180 1x2x0,8 Lg P90-R

B2ca-s1,d1,a1 E 90

n x 2 x ≥ 0,8 mm n ≥ 1 E 90

1-CXKH-V P90-R B2ca-s1,d0,a1

1-CXKH-V 4x1,5 RE P90-R B2ca-s1,d0,a1

Cable mesh trays KDS/KDSO400H60.

Consoles WPCB100, brackets WWS/WWSO400,

holders UPW/UPWO, threaded rods PG M10.

Loading 20kg.m-1. Consoles in spacing of 1500 mm.

Track No. 4.

E 90 n x ≥1,5 – 10 mm2 n ≥ 2 E 90 1-CXKH-V 4x10 RE P90-R

B2ca-s1,d0,a1 E 90

SHXKFH-V180 P90-R B2ca-s1,d1,a1

SHXKFH-V180 1x2x0,8 Lg P90-R

B2ca-s1,d1,a1 E 90

n x 2 x ≥ 0,8 mm n ≥ 1 E 90

1-CXKH-V P90-R B2ca-s1,d0,a1

1-CXKH-V 4x1,5 RE P90-R

B2ca-s1,d0,a1 Cable trays KGL/KGOL300H60.

Consoles combined of assembling profiles CWP40H22/04 and

threaded rods PG M10.

Loading 20kg.m-1. Consoles in spacing of 1500 mm.

Track No. 5.

E 90 n x ≥1,5 – 10 mm2 n ≥ 2 E 90 1-CXKH-V 4x10 RE P90-R

B2ca-s1,d0,a1 E 90

SHXKFH-V180 P90-R B2ca-s1,d1,a1

SHXKFH-V180 1x2x0,8 Lg P90-R

B2ca-s1,d1,a1 E 90

n x 2 x ≥ 0,8 mm n ≥ 1 E 90

1-CXKH-V P90-R B2ca-s1,d0,a1

1-CXKH-V 4x1,5 RE P90-R B2ca-s1,d0,a1

Cable mesh trays KDS/KDSO300H60.

Consoles combined of assembling profiles CWP40H22/04 and

threaded rods PG M10.

Loading 20kg.m-1. Consoles in spacing of 1500 mm.

Track No. 6.

E 90 n x ≥1,5 – 10 mm2 n ≥ 2 E 90 1-CXKH-V 4x10 RE P90-R

B2ca-s1,d0,a1 E 90

SHXKFH-V180 P90-R B2ca-s1,d1,a1

SHXKFH-V180 1x2x0,8 Lg P90-R

B2ca-s1,d1,a1 E 90

n x 2 x ≥ 0,8 mm n ≥ 1 E 90

(8)

Cable Type of tested cable, single cross-

sections and number of conductors Arrangement

Classification for type of tested cable

(by cross-sections and number of

conductors)

Classification for cable

1-CXKH-V P90-R B2ca-s1,d0,a1

1-CXKH-V 4x1,5 RE P90-R

B2ca-s1,d0,a1 Cable trays KFL100H60 fixed to trapezoidal hanger WT/WTO120 on ceiling by threaded rods PG M6

and center hangers ZSW.

Loading 5kg.m-1. Hangers in spacing of 1500 mm.

Tracks No. 7 and 8.

E 90 n x ≥1,5 – 10 mm2 n ≥ 2 E 90 1-CXKH-V 4x10 RE P90-R

B2ca-s1,d0,a1 E 90

SHXKFH-V180 P90-R B2ca-s1,d1,a1

SHXKFH-V180 1x2x0,8 Lg P90-R

B2ca-s1,d1,a1 E 90

n x 2 x ≥ 0,8 mm n ≥ 1 E 90

1-CXKH-V P90-R B2ca-s1,d0,a1

1-CXKH-V 4x1,5 RE P90-R B2ca-s1,d0,a1

Cable mesh trays KDS/KDSO100H60 fixed to trapezoidal hanger WT/WTO120 on ceiling by threaded rods PG M6

and center hangers ZSW.

Loading 5kg.m-1. Hangers in spacing of 1500 mm.

Tracks No. 9 and 10.

E 90 n x ≥1,5 – 10 mm2 n ≥ 2 E 90 1-CXKH-V 4x10 RE P90-R

B2ca-s1,d0,a1 E 90

SHXKFH-V180 P90-R B2ca-s1,d1,a1

SHXKFH-V180 1x2x0,8 Lg P90-R

B2ca-s1,d1,a1 E 90

n x 2 x ≥ 0,8 mm n ≥ 1 E 90 1-CXKH-V

P90-R B2ca-s1,d0,a1

1-CXKH-V 4x1,5 RE P90-R B2ca-s1,d0,a1

Cable trays KGL/KGOL300H60.

Consoles combined of assembling profiles CWP40H22/03 and threaded rods PG M10. Consoles fixed to trapezoidal steel sheet by trapezoidal hangers WT/WTO120.

Loading 10kg.m-1. Consoles in spacing of 1500 mm.

Track No. 11.

E 90 n x ≥1,5 – 10 mm2 n ≥ 2 E 90 1-CXKH-V 4x10 RE P90-R

B2ca-s1,d0,a1 E 90

SHXKFH-V180 P90-R B2ca-s1,d1,a1

SHXKFH-V180 1x2x0,8 Lg P90-R

B2ca-s1,d1,a1 E 90

n x 2 x ≥ 0,8 mm n ≥ 1 E 90

1-CXKH-V P90-R B2ca-s1,d0,a1

1-CXKH-V 4x1,5 RE P90-R B2ca-s1,d0,a1

Cable mesh trays KDS/KDSO300H60.

Consoles combined of assembling profiles CWP40H22/03 and threaded rods PG M10. Consoles fixed to trapezoidal steel sheet by trapezoidal hangers WT/WTO120.

Loading 10kg.m-1. Consoles in spacing of 1500 mm.

Track No. 12.

E 90 n x ≥1,5 – 10 mm2 n ≥ 2 E 90 1-CXKH-V 4x10 RE P90-R

B2ca-s1,d0,a1 E 90

SHXKFH-V180 P90-R B2ca-s1,d1,a1

SHXKFH-V180 1x2x0,8 Lg P90-R

B2ca-s1,d1,a1 E 90

n x 2 x ≥ 0,8 mm n ≥ 1 E 90

1-CXKH-V P90-R B2ca-s1,d0,a1

1-CXKH-V 4x1,5 RE P90-R B2ca-s1,d0,a1

Cable trays KCP/KCOP300H60.

Consoles WPCB1000, brackets WWS/WWSO400,

holders UPW/UPWO, threaded rods PG M10.

Loading 10kg.m-1. Consoles in spacing of 1200 mm.

Track No. 13.

E 90 n x ≥1,5 – 10 mm2 n ≥ 2 E 90 1-CXKH-V 4x10 RE P90-R

B2ca-s1,d0,a1 E 90

NHXH FE180/E90

NHXH-J 4x1,5 RE FE180/E90 E 90 n x ≥1,5 – 10 mm2

n ≥ 2 E 90

NHXH-J 4x10 RE FE180/E90 E 90

JE-H(St)H FE180/PS90 B2ca-s1,d1,a1

JE-H(St)H 1x2x0,8 Bd FE180/PS90

B2ca-s1,d1,a1 E 60

n x 2 x ≥ 0,8 mm n ≥ 1 E 60 1-CXKH-V

P90-R B2ca-s1,d0,a1

1-CXKH-V 4x1,5 RE P90-R B2ca-s1,d0,a1

Cable ladders DGOP400H60.

Consoles WPCB1000, brackets WWS/WWSO400,

holders UPW/UPWO, threaded rods PG M10.

Loading 20kg.m-1. Consoles in spacing of 1200 mm.

Track No. 14.

E 90 n x ≥1,5 – 10 mm2 n ≥ 2 E 90 1-CXKH-V 4x10 RE P90-R

B2ca-s1,d0,a1 E 90

NHXH FE180/E90

NHXH-J 4x1,5 RE FE180/E90 E 90 n x ≥1,5 – 10 mm2

n ≥ 2 E 90

NHXH-J 4x10 RE FE180/E90 E 90

SHXKFH-V180 P90-R B2ca-s1,d1,a1

SHXKFH-V180 1x2x0,8 Lg P90-R

B2ca-s1,d1,a1 E 90

n x 2 x ≥ 0,8 mm n ≥ 1 E 90 JE-H(St)H

FE180/PS90 B2ca-s1,d1,a1

JE-H(St)H 1x2x0,8 Bd FE180/PS90

B2ca-s1,d1,a1 E 90

n x 2 x ≥ 0,8 mm n ≥ 1 E 90 JE-H(St)H

FE180/PS60 JE-H(St)H 1x2x0,8 Bd FE180/PS60 E 30

n x 2 x ≥ 0,8 mm n ≥ 1 E 30

(9)

FIRES-JR-098-14-NURE

FIRES 149/S-28/03/2014-E Page: 8/9

Cable Type of tested cable, single cross-

sections and number of conductors Arrangement

Classification for type of tested cable

(by cross-sections and number of

conductors)

Classification for cable

NHXH FE180/E90

P

NHXH-J 4x1,5 RE FE180/E90 P

Cable trays KCP/KCOP300H60.

Assembling profiles CWP/CWOP40H40 fixed to wall,

brackets WWS/WWSO400, holders UPWK/UPWKO, threaded rods PG M10 fixed to

profiles by hangers WKPO.

Loading 10kg.m-1. Consoles in spacing of 1200 mm.

Track No. 15.

E 60 n x ≥1,5 – 10 mm2 n ≥ 2 E 60

NHXH-J 4x10 RE FE180/E90 P E 60

SHXKFH-V180 P90-R B2ca-s1,d1,a1

SHXKFH-V180 1x2x0,8 Lg P90-R

B2ca-s1,d1,a1 E 90

n x 2 x ≥ 0,8 mm n ≥ 1 E 90 JE-H(St)H

FE180/PS90 B2ca-s1,d1,a1

JE-H(St)H 1x2x0,8 Bd FE180/PS90

B2ca-s1,d1,a1 E 90

n x 2 x ≥ 0,8 mm n ≥ 1 E 90 JE-H(St)H

FE180/PS60 JE-H(St)H 1x2x0,8 Bd FE180/PS60 E 90

n x 2 x ≥ 0,8 mm n ≥ 1 E 90 1-CXKH-V

P90-R B2ca-s1,d0,a1

1-CXKH-V 4x1,5 RE P90-R

B2ca-s1,d0,a1 Cable ladders DGOP400H60.

Assembling profiles CWP/CWOP40H40 fixed to wall,

brackets WWS/WWSO400, holders UPWK/UPWKO, threaded rods PG M10 fixed to

profiles by hangers WKPO.

Loading 20kg.m-1. Consoles in spacing of 1200 mm.

Track No. 16.

E 90 n x ≥1,5 – 10 mm2 n ≥ 2 E 90 1-CXKH-V 4x10 RE P90-R

B2ca-s1,d0,a1 E 90

NHXH FE180/E90

P

NHXH-J 4x1,5 RE FE180/E90 P E 30 n x ≥1,5 – 10 mm2

n ≥ 2 E 30

NHXH-J 4x10 RE FE180/E90 P E 30

1-CXKH-V P90-R B2ca-s1,d0,a1

1-CXKH-V 4x1,5 RE P90-R B2ca-s1,d0,a1

Track is made of cable hangers (OZO) fixed to ceiling by expansion screws (MKR Ø6 x 30)

mm in spacing of 600 mm.

Track No. 17.

E 60 n x ≥1,5 – 10 mm2 n ≥ 2 E 60 1-CXKH-V 4x10 RE P90-R

B2ca-s1,d0,a1 E 90

1-CXKH-V P90-R B2ca-s1,d0,a1

1-CXKH-V 4x1,5 RE P90-R B2ca-s1,d0,a1

Track is made of single cable clips (UDF) fixed to ceiling by expansion screws (MKR Ø6 x 30)

mm in spacing of 600 mm.

Track No. 18.

E 90 n x ≥1,5 – 10 mm2 n ≥ 2 E 90 1-CXKH-V 4x10 RE P90-R

B2ca-s1,d0,a1 E 90

SHXKFH-V180 P90-R B2ca-s1,d1,a1

SHXKFH-V180 1x2x0,8 Lg P90-R

B2ca-s1,d1,a1 E 90

n x 2 x ≥ 0,8 mm n ≥ 1 E 90 JE-H(St)H

FE180/PS90 B2ca-s1,d1,a1

JE-H(St)H 1x2x0,8 Bd FE180/PS90

B2ca-s1,d1,a1 E 60

n x 2 x ≥ 0,8 mm n ≥ 1 E 60

1-CXKH-V P90-R B2ca-s1,d0,a1

1-CXKH-V 4x1,5 RE P90-R B2ca-s1,d0,a1

Track is made of cable hangers (OZSO) fixed to ceiling by screws (SBSTM 7,5 x 52) mm in spacing

of 600 mm.

Track No. 19.

E 90 n x ≥1,5 – 10 mm2 n ≥ 2 E 90 1-CXKH-V 4x10 RE P90-R

B2ca-s1,d0,a1 E 90

SHXKFH-V180 P90-R B2ca-s1,d1,a1

SHXKFH-V180 1x2x0,8 Lg P90-R

B2ca-s1,d1,a1 E 90

n x 2 x ≥ 0,8 mm n ≥ 1 E 90

1-CXKH-V P90-R B2ca-s1,d0,a1

1-CXKH-V 4x1,5 RE P90-R B2ca-s1,d0,a1

Track is made of single cable clips (UDF) fixed to trapezoidal steel sheet by steel self-drilling screws (SMD 4,8 x 16) mm in spacing of

600 mm.

Track No. 20.

E 90 n x ≥1,5 – 10 mm2 n ≥ 2 E 90 1-CXKH-V 4x10 RE P90-R

B2ca-s1,d0,a1 E 90

SHXKFH-V180 P90-R B2ca-s1,d1,a1

SHXKFH-V180 1x2x0,8 Lg P90-R

B2ca-s1,d1,a1 E 90

n x 2 x ≥ 0,8 mm n ≥ 1 E 90 JE-H(St)H

FE180/PS90 B2ca-s1,d1,a1

JE-H(St)H 1x2x0,8 Bd FE180/PS90

B2ca-s1,d1,a1 E 60

n x 2 x ≥ 0,8 mm n ≥ 1 E 60

1-CXKH-V P90-R B2ca-s1,d0,a1

1-CXKH-V 4x1,5 RE P90-R B2ca-s1,d0,a1

Track is made of cable hangers (OZMO) fixed to ceiling by expansion screws (MKR Ø6 x 30)

mm in spacing of 600 mm.

Track No. 21.

E 90 n x ≥1,5 – 10 mm2 n ≥ 2 E 90 1-CXKH-V 4x10 RE P90-R

B2ca-s1,d0,a1 E 90

(10)

The element, Cable bearing system BAKS – cable trays, cable ladders, cable mesh trays, cable clips and clamps with accessories (consoles, brackets, assembling profiles, etc.) and power and communication halogen free cables of company TECHNOKABEL S.A. with circuit integrity maintenance classes are classified to classes according to achieved test results of tested cables at tracks. Other classification is not allowed.

4.3 FIELD OF APPLICATION

This classification is valid for the following end use applications:

§ throughout the period during which circuit integrity is to be maintained, neighbouring building components shall not have a negative effect on circuit integrity;

§ although testing is only carried out on cables arranged horizontally, test results also apply to cables arranged either diagonally or vertically (e.g. risers), as long as the cable system is supported in transitional areas (i.e. where it switches from a horizontal to a vertical arrangement) in such a manner that the cables will not slip or kink at corners;

§ test results of function in fire test of cables tested at standard supporting construction are also applicable for tested standard supporting construction of other producers;

§ test results of function in fire test of cables tested at standard supporting construction are also applicable for cables of other producers tested at standard supporting construction;

§ maximal length of increasing routing shall be 3500 mm with consistent horizontal placing of cable with minimal length of 300 mm (apart from cable bending) and with maximal spacing of clips of 300 mm, eventually the cables are stabilized by cable transmissions at floor or ceiling with particular fire resistance;

§ for vertical systems, the test results obtained for cables mounted singly on the ceiling using single clips apply. Brackets of proven suitability may also be used, as long as their spacing is equal to that of the single clips tested;

§ results of testing single cables on the ceiling apply also to cables mounted horizontally on walls;

§ results of testing bunched cables on a ladder or tray also apply to support construction attached to a wall. However, such constructions required proof of suitability by means of a test certificate or other document issued by an accredited testing laboratory.

5. LIMITATIONS

This classification document does not represent type approval or certification of the product.

The classification is valid until 03. 02. 2020 provided that the product, field of application and standards and regulations are not changed.

Approved: Signed:

Ing. Štefan Rástocký Bc. Dávid Šubert

leader of the testing laboratory technician of the testing laboratory

Cytaty

Powiązane dokumenty

Consoles combined of assembling profile CWP40H22/05 and threaded rods PG M8 fixed to.. ceiling by anchors HKD

Product comprise of cable bearing system BAKS – cable trays, cable ladders, cable mesh trays, cable clips and hangers with accessories (consoles, brackets,

The element, Cable bearing system BAKS – cable trays, cable ladders, cable mesh trays, cable clips and hangers with accessories (consoles, brackets, supports, hangers, etc.)

Product comprise of cable bearing system BAKS – cable trays, cable ladders, cable clips with accessories (consoles, brackets, cable clamps, etc.) and power and communication

The element, Cable bearing system BAKS – cable trays, cable ladders, cable clips and clamps with accessories (consoles, brackets, supports, hangers, etc.) and

Product comprise of cable bearing system BAKS – cable trays, cable mesh trays, cable clips and clamps with accessories (consoles, brackets, assembling profiles, etc.) and

Product comprise of cable bearing system of company BAKS Kazimierz Sielski – cable trays, mesh trays, ladders, cable clamps with accessories (consoles, brackets, supports,

The element, Cable bearing system BAKS – cable trays, cable ladders, cable clips and clamps with accessories (consoles, brackets, supports, hangers, etc.) and